ML20071D321

From kanterella
Jump to navigation Jump to search
Amends 82 & 83 to Licenses DPR-32 & DPR-37,respectively, Revising Tech Specs to Incorporate Requirements Re Plant Staff Working Hours & Increase Frequency of Emergency & Security Program Audits
ML20071D321
Person / Time
Site: Surry  
(DPR-32-A-082, DPR-32-A-82, DPR-37-A-083, DPR-37-A-83)
Issue date: 03/01/1983
From: Varga S
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20071D323 List:
References
NUDOCS 8303110131
Download: ML20071D321 (8)


Text

.

.aace o

UNITED STATES NUCLEAR REGULATORY COMMISSION o

{

g WASHINGTON, D. C. 20065

%,...../

VIRGINIA ELECTRIC AND POWER COMPANY

_ DOCKET NO. 50-280 SURRY POWER STATION, UNIT NO. 1 AMENDMENT TO FACILM r OPERATING LICENSE Amendment No. 82 License No. DPR-32 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Virginia Electric and Power Company (the licensee) dated December 1,1982, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations ' set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act,.and the rules and regulations of the Commission; C.

Ther' is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted,in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

e e

e 8303110131 830301 l

PDR ADOCK 05000280 P

PDR_

2-2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B of Facility Operating License No. DPR-32 is hereby amended to read as follows:

B.

Technt, cal Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. '82, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION jh.

h, h

t-even a.

arga, ef Operating Reactor ranch #1 Division of Licens g

Attachment:

Changes to the Technical Specifications Date of Issuance: March 1,1983 l

~

a e

e e

e

kn astog%

UNITED STATES E

NUCLEAR REGULATORY COMMISSION g

g j

WASHINGTON, D. C. 20655 VIRGINIA ELECTRIC AND POWER COMPAN DOCKET NO. 50-281 SURRY POWER STATION, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 83 License No. DPR-37 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Virginia Electric and Power Company (the licensee) dated December 1,1982, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Canmission; C.

There fs reasonable assurance (i) that th.e activities authorized

^

by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.8 of Facility Operating License No. DPR-37 is hereby amended to read as follows:

B.

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 83, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance.

FOR

'HE NUCLEAR REGULATORY COMMISSION ar s

ven Operating Reactors'B anch #1 Division of Licensi

Attachment:

Changes to the Technical Specifications Date of Issuance: March 1,1983 i

i l

l l

t i

e+.i

ATTACHMENT TO LICENSE AMENDMENTS AMENDMENT NO. 82 TO FACILITY OPERATING LICENSE NO. DPR-32 AMENDMENT NO. 83 TO FACILITY OPERATING LICENSE NO. DPR-37 DOCKET NOS. 50-280 AND 50-281 Revise Appendix A as follows:

Remove Pages Insert Pages 6.1-3 6.1-3

~

6.1-13 6.1-13 6.1-14 6.1-14 4

e r

\\

1 1

1

~

a s..

TS 6.1-3 7.

A Fire Brigade of at least five members, all of whom have received fire service training, will be maintained on-site at all times.

This excludes personnel in Table 6.1-1 of the minimum shift crew necessary for safe shutdown of the plant and any personnel required for other essential functions during a fire emergency.

8.

A training program for the Fire Brigade shall be maintained under

~

the direction of a Fire Marshall and shall meet or exceed the requirements of the NFPA Code Section 27 (1975), except that a training session and drill shall be held at least once per 92 days.

9.

The health physics technician and Fire Brigade composition of Specifi,

cations 6.1.B.5 and 6.1.B.6 may be less than t,he minimum requirement' for a period of time not to exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> in order to accomodate unexpected absence provided immediate action is taken to fill the required positions.

10.

Procedures will be established to insure that NRC policy statement guidelines regarding working hours established for empicyees are followed. In addition, procedures will provide for documentation of authorized deviat$ons from those guidelines and that the documentation is available for NRC review.

f Anendments 82 & 83 s.

3 l

,e-,

,,--,,w-,,

--wm-e.-

- - - - - +-

= -

~

TS 6.1-13 3.

Quality Assurance Department a.

Function The Quality Assurance Department shall function to audit station activities. These audits shall encompass:

1.

The conformance of facility operation to provisions contained within the Technica'l Specifications and applicable license conditions at.least one per 12 months.

2.

The performance, training and qualifications of the entire facility staff at least once per 12 months.

t 3.

The results of actions taken to correct deficiencies occurring l

in facility equipment, structures, systems or method of opera-

\\

tion that affect nuclear safety at least one per 6 months.

l 4.

The performance of activities required by the Operational Quality Assurance Program to meet the criteria of Appendix "B",

10 CFR 50, at least once per 24 months.

1 1

5.

The Station Emergency Plan and implementing procedures at least once per 12 months.

Amendments 82 a 83

.L.

- ~

TS 6.1-14 6.

The Station Security Plan and implementing procedures at least once per 12 months.

' s0 7.

Any other area of facility operation considered appropriate by the Executive Manager-Quality Assurance or the Senior Vice President-Power Operations.

8.

The Station Fire Protection Program and implementing procedures at least once per 24 months..

9.

'An independent fire protection and loss prevention program inspection and audit shall be performed at least once per 12 months utilizing either qualified offsite licensee personnel or an outside fire protection firm.

10. An inspection and audit of the fire protection and loss preven-tion program shall be performed by a qualified outside fire consultant at least once per 36 months.

l b.

Authority The Quality Assurance Department shall report' to and advise the Executive Manager-Quality Assurance, who shall advise the Senior Vice President-Power Operations on those areas of responsibility specified in 6.1.C.3.a above.

Amendments 82 & 83 l