Requests NRC Review & Concurrence W/Work Activities on Flanged Joints & Release of Piping from Warehouse for Testing Purposes.Activities Do Not Violate 821112 Show Cause Order for Immediate Suspension of Essential Const
ML20071D144
Person / Time
Site: Zimmer
Issue date: 02/23/1983
From: Borgmann E
CINCINNATI GAS & ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20071D139 List:
References
EAB-SOL-29, NUDOCS 8303090212
Download: ML20071D144 (2)


Text

'

~:

THE CINCINNATI GAS & ELECTRIC COMPANY CINCINN ATI. OHIO 452ol February 23, 1983 EAB-SOL-29 E A. BORGMANN sENIOm WCE PmCSIDENT MA :A6 A DRd v

U.

S.

NUCLEAR REGULATORY COMMISSION DLRA__lMPg8 Region III 3f fil!_,.

.,Q E if M' 799 Roosevelt Road Q!

Glen Ellyn, Illinois 60137 Ec.. ;.'_. -

j 2.5f !

-H Attention:

Mr.

J.

G.

Keppler

~.)g. g Regional Administrator t

RE:

Wm.

H.

Zimmer Nuclear Power Station - Unit 1 WORK REQUEST AFTER SHOW CAUSE ORDER OF NOVEMBER 12, 1982 Docket No. 50-358 Construction Permit No. CPPR-88 W.O.

57300 Job E-5590 File 956 Gentlemen:

The Cincinnati Gas & Electric Company (CG6E) wishes to continue certain work activities which do not violate the spirit of the November 12, 1982 Show Cause and Order of Immediate Suspension of Essential Consttuction.

CG&E would like NRC review and concurrence of the following items prior to their performance:

1)

FLANGED JOINTS Both the H.

J.

Kaiser Company, CG&E Quality Assurance, and the Quality Confirmation Program will need to have flanged joints taken apart on safety related systems in order to perform inspections.

CG&E feels that the disassembly and reassembly of flanged joints in accordance with approved site procedures in order to support inspections should not be considered as

" enhancing construction".

2)

RELEASE OF PIPING FROM THE WAREHOUSE FOR TESTING PURPOSES.

CG&E requests the release of the following 48 pieces of essential Small Bore Piping from the H.

J.

Kaiser Warehouse:

8303090212 830303 PDR ADOCK 05000358 A

PDR FEB SG he3 i

1

I i

1 Mr. J.

G.-Kspp1Gr

.EAB-50L-29 February 23, 1983l Page 2 l

1/2" Schedule 40, 80, 160, XXS 3/4" Schedule 40, 80, 160, XXS 1"

Schedule 40, 80, 160, XXS ik" Schedule 40, 80, 160, XXS 1h" Schedule 40, 80,-160, XXS j'

2" Schedule 40, 80, 160,-XXS The Piping will be both stainless steel and carbon steel cut in approximately six (6) foot lengths.

The Piping will be used as a test material on.a Hydraulic Pipe Bender and the resulting data used in a 50.55(e) Report M-67.

The released material will not be used for physical Construction.

f A prompt reply to this request would be appreciated.

a Very truly yours,.

THE CINCINNATI GAS &. ELECTRIC CO.

I a

By t

E.

A.

Borgmann Senior Vice President JCH: rem i

cc: NRC Office of Inspection and Enforcement Washington, D.

C.

20555 l

4 l

NRC Senior Resident Inspector Attn:

W.

F.

Christianson a

1 a

l l

i 4

,, _,