ML20071D123

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Rev 10 to Emergency Plan Implementing Procedure FNP-0-EIP-4 Re Chemistry & Health Physics Support to Emergency Plan & Rev 11 to FNP-0-EIP-9 Re Radiation Exposure Estimates & Emergency Classification
ML20071D123
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 02/09/1983
From: Hudspeth J
ALABAMA POWER CO.
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20071D117 List:
References
NUDOCS 8303090199
Download: ML20071D123 (1)


Text

,

/

q

=u o

L AlabamaPower I

the southem etecirc system February 9, 1983

-l d

$h l

Director NRR j

Nuclear. Reactor Relations USNRC Phillips Building i

7920 Norfolk Building I

Bethesda,'MD 20014 h

Dear Sir:

In accordance with Alabama Power Company Administrative Procedure j

FNP-0-AP-4, Control of Plant Documents and Records, attached are revisions to Emergency Plan Implementing Procedures.

Please verify that you have the procedures with the corresponding copy numbers that are listed on the Document Transmittal Forms.

l Please sign and return the forms as soon as possible to the following j

address.

Alabama Power Company f

Farley Nuclear Plant l

Box 470 Ashford, AL 36312 7

ATTN: Document Control Supervisor If you should have any questions, please call me at (205) 899-5156 Ext. 422.

Sincerely, 1

l l

[.$2 2 B. /Hudspeth W

e j

/

l o

Doc 6mentControlfupervisor JBH:hre l

cc: Larry W. Enfinger l

File i

l' I![O 8303090199 830302 PDRADOCK05000g F

l-