I i
THE CINCINNATI GAS & ELECTRIC COMPANY is
^ ~
CINCINN ATI, OHIO 452OI February 23, 1983 QA-2272 E. A BORGMANN SENIOR VICE PRESIDENT U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attention:
Mr. J. G. Keppler Regional Administrator RE:
WM. H. ZIMMER NUCLEAR POWER STATION UNIT I 10CFR50.55(e) ITEM M RADIOGRAPHIC AND WELD DEFICIENCIES FOR SACRIFICIAL SHIELDS CONTAINMENT MONORAIL AND VENT STACK WELDS DOCKET NO. 50-358, CONSTRUCTION PERMIT NO.
CPPR-88, W.O. #57300, JOB'E-5590 FILE NO. NRC-8, M-49 Gentlemen:
This letter constitutes an interim report concerning the referenced subject conditions initially reported to the Commission under the requirements of 10CFR50.55(e).
Since our previous report, QA-2185, dated December 29, 1982 Cincinnati Gas & Electric Company (CG&E) and Sargent & Lundy Engineers (S&L) have completed the review of the radiographs associated with the Sacrificial Shield Welds. These welds were reviewed to the criteria established in paragraph UW-52 of the 1971 Edition of the ASME Code,Section VIII. With the exception of seven (7) films all views are acceptable. The unacceptable areas have been identified and corrective action is being determined.
Review of Radiographic film of welds associated with both the monorail and Vent Stack have also been performed by CG&E.
Several of these welds were originally radiographed in the as-welded condition.
These areas will be surface prepared, as required, re-radiographed and the new film evaluated. This process can begin when an NRC release of the " Order to Show Cause and Order Immediately Suspending Construction" *or work in this area is granted. A follow-up report will be submitted by May 31, 1983.
8303080239 830223 EDyl m
PDR ADOCK 05000308 I
Mr. J. G. Keppler
' Regiona1' Administrator
- Region'III' February 23, 1983 QA-2272 Page 2 We trust' the above will be found acceptable as an interim report under 10CFR50.55(e).
Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY By
- E. A. BORGMANN SENIOR VICE PRESIDENT DLC:as cc: NRC affice of Inspection & Enforcement Washington, D.C.
20555 NRC Senior Resident Inspector Attn:
W. F. Christianson Zimmer Project Inspector Region III d