Monthly Operating Rept for Dec 1982
ML20071C889
Person / Time
Site: Ginna 
Issue date: 01/06/1983
From: Mcnamara A
BALTIMORE GAS & ELECTRIC CO.
To:
Shared Package
ML20071C885 List:
References
NUDOCS 8303080217
Download: ML20071C889 (5)


Text

-

j

.i.

OPERATING DATA R2 PORT DOCKET NO.

50-244 DATE January 6, 1983 COMPLETED BY d E # 8.Md- = a.

Andrew E. McNamar P TELEPilONE 1 (315) 524-4446 OPERATING STATUS Ext. 301, at Ginna

1. Unit Name:

GINNA STATION. UNIT #1 Notes The reactor power level

2. Reporting Period: December. 1982 was maintained at 100% for 1520 the majority of the report
3. Licensed Thermal Power (MWr):

49 Period. The exception was a

4. Nameplate Rating (Gross MWe):

470 reduction to ~ 47% power

5. Design Electrical Rating (Net MWe):

level on 12/19, detailed on 499

6. Maximum Dependable Capacity (Gross MWe):

Page 3.

470

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level to Which Restricted, If Any (Net MWe): _
10. Reasons For Restrictions, If Any:

This Month Yr.-to-Da te Cumulative

11. Ilours In Reporting Period 744 8,760.00 114,816.00 744 5,243.33 86,886.15
12. Number of Ilours Reactor Was Critical 0

0 1,631.32 *

13. Reactor Reserve Shutdown liours 744 5,152.50 84,980.13
14. Ilours Generator On-Line
15. Unit Reserve Shutdown llours 0

0 8.5

  • 1,121,448.0 7,677,000 116,582,554
16. Gross Thermal Energy Generated (MWil) 370,410 2,531,832 37,966,797
17. Gross Electrical Energy Generated (MTII) 352,525 2,407,989 35,986,062
18. Net Electrical Energy Generated (MWil) 100%

58.82%

74.01%

19. Unit Service Factor 100%

58.82%

74.02%

20. Unit Availability Factor 100.81%

58.49%

68.60%

21. Unit Capacity Factor (Using MDC Net) 100.81%

58.49%

68.60%

22. Unit Capacity Factor (Using DER Net) 0 11.70 8.51%
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Mid-March-1983 - Refueling and Maintenance

25. If Shur Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 42-48 I R E V.

1/79)

  • Cummulative Total <-nmmencing January 1,1975 8303000217 830106 PDR ADOCK 05000244 R

PDR u

t AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-244 UNIT

  1. 1, Ginna Station DATE Japuary 6, 1983 COMPLETED BY W E, h4h Andrew E.

McNamara TELEPHONE 1 (315) 524-4446 Ext. 301 at Ginna MONTH December, 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL

( MWe-Ne t)

(MWe-Ne t) 1.

477 17.

476 2.

477 18.

476 3.

477 19.

401 4.

477 20.

474 5.

476 21.

475 6.

476 22.

476 7.

477 23.

476 8.

476 24.

476 9.

475 25, 476 10.

476 26.

476 11.

476 27.

476 12.

477 28.

477 13.

477 29.

477 14.

477 30.

476 15.

477 31.

476 16.

476 INSTRUCTIONS On this format, list the averace daily unit power level in MWe-Nat for each day in the reporting month.

Compute to the nearest whole megawatt.

s D(X:KliT NO.

50-244 UNIT NAM!: 3,Ginna Sctrion

[3---

UNIT SHUTDOWN AND POWER REDUCTIONS DATE 3"""*"

6' COMPLETED llY d-w Andrew E. McNamara REPORT MONTil December, 1982 TELEPilONE 1 (315) 524-4446 Ext. 301, at'Ginna m

8; oy Licensee e,

m Cause & Corrective e

} di c No.

Date

{

jj g

Event 2g ij Action to Report #

yj

!u Prevent Recurrence F-fE j

2 g

U Q

HA (Turbine)

Load reduction to ~ 47% reactor l

PR

  • 12-19-82 S

~6 hrs.

B N/A power level to perform a series of monthly turbine valve and trip tests.

I 1

2 Power Reduction 3

4 F: Forced Reason:

Method:

Exhibit G - Instructions S: Scheduled A-Equipment Failure (Esplain) 1 -Manual for Preparation of Data Il-Maintenance or Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examination F-Administrative 5

G-Operational Error (Explain) w 4909 ( R E V.1/7 8 )

II*0ther (Explain)

Exhibit 1 - Same Source

O

~4-NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-244 UNIT Ginna Station, Unit #1 DATE January 6, 1983 COMPLETED BY

(,__ h e E.h Ste-Andrew E.

McN3msta TELEPHONE 1 (315) 524-4446 EXT. 301 MONTH DECEMBER, 1982 The reactor power level was maintained at 100% for the majority of the report period.

The major exception, on 12/19, was a reduction to 47% reactor power level to perform a series of turbine valve and trip tests.

The reactor power was gradually increased to the 100% level following completion of the tests.

i I

i,

Pcqo 5 GINNA STATIOtt Maintenance Report December, 1982 During December, routine maintenance and inspections were completed.

Corrective maintenance was required to repair an Air-operated containment isolation valve, AOV-846, Nitrogen supply to contain-ment.

The valve had seized up during normal operation.