NRC MONTHLY OPERATING REPORT OPERATING
SUMMARY
- DECEMBER 1982 UNIT 1 The unit remained shutdown the entire month for the 1-P.5 refueling out l
l t
i 8303080059 830114 PDR ADOCK 05000313 R
OPERATING DATA REPORT DOCKET NO.
50-313 DATE 1 la n1 COMPLETED BY A.J. Gertsh TEL EPHONE Sni-gga-3155 OPERATING STATUS Notes Arkansas Nuclear One - Unit 1
- 1. Unit Na.ae:
December 1-31. 1982
- 2. Reporting Period:
2568
- 3. Licensed Thstmal Power (MW ):
- 4. Nameplate Rating (Gross MWe):
902.74 850
- 5. Design Electrical Rating (Net MWel:
883
- 6. Maximum Dependable Capacity (Gross MWe):
836
- 7. Masimum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
None
- 9. Power Lesel To which Restricted. if Any (Net MWe):
- 10. Reasons For Restrictions. If Any:
This Month Yr. to Date Cumulatise 744.0 8760.0 70435.0
- 11. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical 0.0 5759.8 48007.3 0.0 0.0 5044.0
- 13. Reactor Resene Shutdown Hour, 0.0 5673.7 47057.5
- 14. Hours Generator On-Line
- 15. Unit Resene Shutdown Hours nn 0.0 817.5
- 16. Gross Thermal Energy Generated IMWH) 0.0 12239608.0 111769814.0
- 17. Gross Electrical Energy Generated iMWH) 0.0 3928288.0 36765044.0 0.0 E21409.0 35037810.0
- 18. Net Electrical Energy Generated (MWHi 0.0 64.8 66.8
- 19. Unit Senice Factor
- 20. Unit Availability Factor 0.0 64.8 68.0 0.0 50.R 59.5
- 21. Unit Capacity Factor (Using MDC Net 1
- 22. Unit Capacity Factor (Using DER Net p 0.0 50.0 58.5 0.0 11.7 15.6
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Oser Nest 6 Months (Type. Date.and Duration of Eacht:
Unit remained in scheduled 1-R5 refueling notage fnr the antiro rnnnth_
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achiesed INITI A L CRITICALITY INITI AL ELECTRICITY COMMERCI AL OPER ATION 08/77i
AVERAGE DAILY UNIT POWER LEVEL i
DOCKET NO.
50-313 1
UNIT I
DATE 1-14-83 COMPLETED BY A.J. Gertsh TELEPHONE 501-964-3155 MONTH December. 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe.Neti 1
0 37 0
2 0
18 0
3 0
39 0
4 0
0 20 0
0 5
22 6
0 32 0
7 23 0
0 8
n 24 9
0 0
25 lo 0
0 26 0
11 0
27 12 0
0 23 13 0
0 29 0
0 14 3o 15 0
0 3,
16 0
INSTRUCTIONS On this format. list the average daily unit power lesel in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
(u '77 )
4 DOCKET NO.
50-313 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME ANO-Unit 1 DATE _J AN. 4. 1983 COMPLETED BY A. J. GERTSCH REPORT MONTH DECEMBER TELEPHONE 501-964-3155
.5 ?
3 hY Licensee
[-t,
't Cause & Corrective Action to No.
Date i
3g j
jg5 Event 37 g3 y:
U@=
Report a in V o'
Prevent Recurrence H
o g
Q 82-07 821108 S
744,0 C
4 N/A N/A N/A 1-R5 Refueling Outage I
2 3
4 F: Forced Reason:
Method:
Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.
Entsy Sheets for Licensee C Refueling 3-Automatic Scram.
Event Repor (LER) File (NUldG-D Regulatory Restriction 4 Continuation 0161)
E-Operator Training & License Examination 5-Load Reduction 5
F-Administ rative 9-0ther Exhibit I - Same Source Goperational Er ror (Explair.)
P8/77)
Il Other (Explain)
i i
REFUELING INFORMATION
^
t-1.-
Name of facility.
ARKANSAS NUCLEAR Oi4E - UNIT'1 2.
Scheduled date for next refueling shutdown. November 8.1982 - Refueling in progress.
3.
Scheduled date for restart following refueling.
March 15. 1983 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If answer is yes, what, in general, will these Se?
If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the i
core reload (Ref. 10 CFR Section 50.59)?
Yes.
Reload repo'rt and associated proposed specification chanae (82A-14L 4
5.
Scheduled date(s) for submitting proposed licensieg action and supporting information.
Submitted November 19. 1982 6.
Importanc licensing considerations associated with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
Will reload 72 fresh fuel assemblies, four of which will be high burn-uo test assemblies. and oDerate for aDDroXimatelY f
16 months.
7 7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool, a) 177 b) 244 8.
The present licensed spent fuel pool storage capacity and the size lof any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
present 58 9 increase size by 379 9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.
DATE: __1997