NRC MONTHLY OPERATING REPORT OPERATING
SUMMARY
- DECEMBER 1982 UNIT 2 The unit began the month at 50% full power and holding for physics testing.
On December 11, the unit tripped on low DNBR.
The trip was caused by a dropped CEA which was in turn caused by a failed upper gripper coil. The unit was returned to power on December 18.
On December 22, the unit tripped again on low DNBR. This time the exact cause of trip was not determined.
The unit was returned to power and reached 100% full power on December 24.
Full power operation continued through the month.
l l
i l
l 8303080046 830114 PDR ADOCK 05000368 R
pop i
OPERATING DATA REPORT DOCKET NO. 50-368 DATE 1/14 / A'4 COMPLETED BY 1..S.' Bramlett TELEPHONE R01 -464-3145 OPERATING STATUS N
- 1. Unit Name:
Arkansas Nucipar One - Unit 2
- 2. Reporting Period: December 1-31. 1982 2815
- 3. Licensed Thermal Power (MWt):
- 4. Nameplate Rating (Gross MWe):
942.57 912
- 5. Design Electrical Rating (Net MWe):
897
- 6. Maximum Dependable Capacity (Gross MWe):
858
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Lesel To which Restricted. lf Any (Net MWe):
None
- 10. Reasons For Restrictions. If Any:
This Month Yr.-to.Date Cumulatise 744.0 8760.0 24264.0
- 11. Hours in Reporting Period
- 12. Number Of Hours Reactor has Critical 621.4 5261.6 16156.2
- 13. Reactor Resene Shutdown Hours 0.0 324.8 1338.5
- 14. Hours Generator On-Line 585.6 5026.9 15568.7 0.0 0.0 75.0
- 15. Unit Resene Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH) 1300220.0 12465192.0 3R251061_0
- 17. Gross Electrical Energy Generated iMWH) 418604.0 4003386.0 12375304.0 396829.0 3746746.0 11717744.0
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor 78.7 57.4 64.9 78.7 57.4 64.5
- 20. Unit Asailability Factor 62.2 49.8 56.3
- 21. Unit Capacity Factor (Using MDC Net) 58.5 46.9 53.0
- 22. Unit Capacity Factor (Using DER Net) 21.3 23.2 20.8
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Oser Next 6 Months (Type. Date,and Duration of Each t:
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITI A L CRITICA LITY INITIA L ELECTRICITY
(
l COMM ERCI A L OPER ATION (o/77
AVER AGE DAILY UNIT POWER LEVEL DOCKET NO. 50-368 UNIT 2 DATE l/14/83 j
COMPLETED BY L.S. Bramlett TELEPHONE 501-964-3145 MONTH December. 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net) 1Mwe. Net; I
418 17 415 2
415 18 829 422 863 3
i, 4
474 20 R61 5
428 21 862 6
429 357 22 7
424 23 183 8
605 24 849 9
704 25 860 10 716 26 860 1
275 27 859 0
12 28 861 13 n
29 861 14 0
862 3o 15 0
860 3,
16 INSTRUCTIONS On this format. list the average daily unir power leselin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
to '771
DOCKET NO. 5.,0-368 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME ANO Unit 2 DATE JAN. 5.1982 COMPLETED BY L.
- s. Eramlere REPORT MONTH December TELEPHONE 'iO 1 -96 /M 1 A 's
~.
E E
j?
3
$Y3 Licensee h
{1, Cause & Corrective No.
Date i
5g 4
is5 Event g-p' Action to
$=
5 3 5 =s Report e mV Prevent Recurrence H
o e
v Q
82-14 821211 F
131.1 A
3 NONE RB CRDRVE Dropped CEA due to a failed upper gripper coil. The coil was replaced.
82-15 821222 F
27.3 H
3 NONE ZZ ZZZZZZ Spurious trip. The exact cause was undetermined.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1 -Manual for Prepanrion of Data B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3 Automatic Scram.
Event Report (LFR) File (NUREG-D Regulatory Restriction 4 Continuation 01611 E-Operator Training & License Examination 5-Load Reduction 5
F Administrative 9-Other G-Operational Error (Explain)
Eshibit I - Same Source P8/77)
Il-Other (E xplaini
REFUELING INFORMATION 1.
Name of facility.
ARKANSAS NUCLEAR ONE - UNIT 2 2.
Scheduled date for next refueling shutdown.
November 1, 1983 3.
Scheduled date for restart following refueling.
February 1. 1984 4.
Will refueling or resumption of operation thereafter require a tcehnical specification change or other license amendment?
If answer is yes, what, in general, will these be?
If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref. 10 CFR Section 50.59)?
To be determined i
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
N/A 6.
Important licensing considerations associated with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
N/A 7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool. a) 177 b) 112 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage apacity that has been requested or is planned, in number of fuel assemblies.
present 485 increase size by 503 9.
The projected date of the last refueling that can be dischargea to the spent fuel pool assuming the present licensed capacity.
DATE: