|
---|
Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML20211J9861999-09-0101 September 1999 Application for Amends to Licenses DPR-53 & DPR-69,changing Definition of Azimuthal Power Tilt in TS 1.1,correcting Peak Linear Heat Rate Safety Limit in TS 2.1.1.2 & Correcting Dc Voltage Range Listed in Surveillance Requirement 3.3.6.2 ML20211G7591999-08-27027 August 1999 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 3.7.13 to Allow Placement of One or More Fuel Assemblies on SFP Rack Spacers to Support Fuel Reconstruction Activities During Continuing Fuel Assembly Movement ML20196E2101998-11-30030 November 1998 Application for Amends to Licenses DPR-53 & DPR-69,allowing Repair of Defective SG Tubes with leak-limiting Alloy 800 sleeves.Non-proprietary Rev 03-P to CEN-633-NP & Proprietary Rev 03-P to CEN-633-P,encl.Proprietary Info Withheld ML20195K3711998-11-20020 November 1998 Application for Amends to Licenses DPR-53 & DPR-69,removing TS Originally Developed from Reg Guide 1.35 & Implementing Requirements of 1992 Edition Through 1992 Addenda of ASME B&PV Code Section Xi,Subsections IWE & Iwl,Per 10CFR50.55a ML20196A6001998-11-20020 November 1998 Application for Amends to Licenses DPR-53 & DPR-69, Requesting Indirect Transfer of Control,Pursuant to 10CFR72.50,of Matls License SNM-2505 for Plant ISFSI ML20195J7131998-11-19019 November 1998 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 3.7.6, SWS, by Adding One SWS Heat Exchanger Inoperable as New Condition for LCO 3.7.6 ML20154N1861998-10-16016 October 1998 Application for Amends to Licenses DPR-53 & DPR-69 to Incorporate Revised TS 3.3.1 & 3.3.2 to Clarify Inconsistency Between TS Wording & Design Bases as Described in TS Bases & UFSAR ML20236S1341998-07-20020 July 1998 Application for Amend to License DPR-59,implementing Mod That Involves Replacing SW Heat Exchangers W/New Plate & Frame Heat Exchangers Having Increased Thermal Performance Capability ML20236S5591998-07-20020 July 1998 Application for Amend to Licenses DPR-53 & DPR-69,providing Alternate Cooling Water Supply to Maintain EDGs Operability During 1999 Refueling Outage ML20198K9591998-01-12012 January 1998 Rev 11 to 961204 Application for Amends to Licenses DPR-53 & DPR-69,converting to Improved Sts,Per NUREG-1432 ML20217K6591997-10-22022 October 1997 Application for Amends to Licenses DPR-53 & DPR-69, Incorporating Both Steady State & Transient Degraded Voltage Setpoints Into Tss,As Opposed to Current Single Degraded Voltage Setpoint ML20211J2691997-10-0202 October 1997 Application for Amend to License DPR-53,revising TS to Reflect New Electrical Capacity for 1B Edg.Significant Hazards Considerations Associated W/Change Have Been Evaluated ML20141F9181997-05-16016 May 1997 Application for Amend to License DPR-53,implementing Mod Involves Replacing Service Water Heat Exchangers W/New Plate & Frame Heat Exchangers Having Increased Thermal Performance Capability ML20136A9751997-03-0606 March 1997 Application for Amend to License DPR-69,allowing Mod to Unit 2 SW Sys Which Constitutes Unreviewed Safety Question in 10CFR50.59 ML20134D2871997-01-31031 January 1997 Application for Amends to Licenses DPR-53 & DPR-69,changing to Support Larger Number of Plugged SG Tubes for Future Operating Cycles ML20149M0801996-12-0404 December 1996 Application for Amends to Licenses DPR-53 & DPR-69,revising TSs to Be Generally Consistent w/NUREG-1432,Rev 1,thus Replacing 2 Current Sets of TSs W/Single Set Applicable to Both Units ML20135A5171996-11-26026 November 1996 Application for Amends to Licenses DPR-53 & DPR-69,adopting Option B of 10CFR50,App J,To Require Types B & C Containment Leakage Rate Testing to Be Performed on performance-based Testing Schedule ML20128H5971996-10-0303 October 1996 Application for Amend to License DPR-53,changing Provisions for Receiving,Possessing & Using Byproduct,Source & Special Nuclear Matl at Plant ML20117L7801996-09-10010 September 1996 Application for Amends to Licenses DPR-53 & DPR-69 Requesting Extension of ESFAS Automatic Actuation Logic Surveillance from Monthly to Quarterly ML20116F8231996-08-0101 August 1996 Application for Amends to Licenses DPR-53 & DPR-69,allowing Use of Blind Flanges During Modes 1-4 in Plant Containment Purge Sys ML20116E3571996-07-26026 July 1996 Application for Amends to Licenses DPR-53 & DPR-69,to Repair Defective SG Tubes by Electrosleeving ML20117J1911996-05-28028 May 1996 Application for Amend to License DPR-53 & DPR-69,requesting Exigent Amends to Allow Installation of Proposed Modification of Unit 1 & 2 Service Water (SRW) Systems ML20101K5911996-03-28028 March 1996 Application for Amends to Licenses DPR-53 & DPR-69, Requesting to Reduce Moderator Temp Coefficient Limit Shown on TS Figure 3.1.1-1 ML20101D8211996-03-15015 March 1996 Suppl to LAR Re Sleeving Option for SG Tube Repair.Proposes Rev to TS Wording in Attachments (A-3) & (A-4) by Removing Generic Ref to Technical Repts & Replace W/Ref to Specfic Approved Repts ML20096D4291996-01-16016 January 1996 Application for Amends to Licenses DPR-53 & DPR-69,adopting Option B of 10CFR50,App J to Require Type a Containment Lrt to Be Performed on performance-based Testing Schedule ML20095K2701995-12-21021 December 1995 Application for Amends to Licenses DPR-53 & DPR-59, Requesting Temporary Exemption & TS Change to Allow Placement of Four Lead Test Fuel Assemblies in Unit 1 Reactor Core During Cycles 13,14 & 15 ML20095C7421995-12-0707 December 1995 Application for Amends to Licenses DPR-53 & DPR-69 to Add Analysis Technique to List of Approved Core Operating Limits Analytical Methods in TS for Plant ML20094S1481995-11-30030 November 1995 Application for Amends to Licenses DPR-53 & DPR-59,allowing Installation of Tube Sleeves as Alternative to Plugging to Repair Defective SG Tubes ML20094D6131995-11-0101 November 1995 Application for Amends to Licenses DPR-53 & DPR-69,upgrading ESF Electrical Sys at Plant to Provide Addl Protection from Loss of Electrical Power ML20093M4141995-10-20020 October 1995 Application for Amend to License DPR-53,extending 18-month Surveillances to 960331 ML20098C0661995-10-0202 October 1995 Application for Amend to License DPR-69,requesting Extension of Unit 2 TS Action Statements 3.7.6.1.a & B from 7 Days to 30 Days for Loss of Emergency Power to Support 1996 Refueling Outage ML20086N2341995-07-13013 July 1995 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 5.2.1 to Allow Use of Lead Fuel Assemblies & Requests Temporary Exemption from Requirements of 10CFR50.46, 10CFR50.44 & 10CFR50,App K for Ccnpp Unit 1 ML20085D4901995-06-0909 June 1995 Application for Amends to Licenses DPR-53 & DPR-69, Implementing Changes to Radiological Effluent TS Per GL 89-01 ML20084R0111995-06-0606 June 1995 Application for Amends to Licenses DPR-53 & DPR-69.Amends Would Revise TSs to Extend Certain 18-month Frequency Surveillances to Refueling Interval ML20084P9681995-06-0202 June 1995 Application for Amends to Licenses DPR-53 & DPR-69,proposing TS Re Pressurizer Safety Valves Lift Tolerance ML20087H9141995-04-28028 April 1995 Application for Emergency Amend to License DPR-53.Amend Would Revise CREVS TSs to Provide an Extension of Allowed Outage Time ML20081D0411995-03-15015 March 1995 Application for Amends to Licenses DPR-53 & DPR-69 to Reformat Current Administrative Controls Section & Relocate Several Requirements to Other Documents & Programs ML20079A5771995-02-24024 February 1995 Application for Amend to License DPR-69,allowing Extension of Interval Between First & Second Type a Test During Second Service Period & Extension of Second Service Period to 12 Years to Coincide w/1999 Plant Inservice Insp ML20078G8161995-01-31031 January 1995 Application for Amends to Licenses DPR-53 & DPR-69,revising TS to Increase Min Amount of Trisodium Phosphate Dodecahydrate Verified in TS Surveillance ML20073G2401994-09-23023 September 1994 Application for Amends to Licenses DPR-53 & DPR-69,allowing one-time Extension from 7 to 14 Days of AOT for Dedicated Class 1E Emergency Power Source During 1995 Refueling Outage ML20071P4421994-08-0404 August 1994 Application for Amend to License DPR-53 & DPR-69,eliminating TS 3/4.3.3.3 for Seismic Monitoring Instrumentation, Relocating Requirements for Operation & Testing of Seismic Monitoring Instrumentation to Plant Updated FSAR ML20149E8321994-08-0202 August 1994 Application for Amends to Licenses DPR-53 & DPR-69,revising Surveillances Associated W/Edgs to Add High Crankcase Pressure to EDG Trips Which Are Verified to Be Automatically Bypassed on Safety Injection Actuation Signal ML20071N2961994-08-0202 August 1994 Application for Amends to Licenses DPR-53 & DPR-69, Incorporating TS 3.9.1, Refueling Operations,Boron Concentration ML20069H6471994-06-0808 June 1994 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 4.6.2.2.d,extending Surveillance Interval from 18 to 24 Months ML20069H6191994-06-0808 June 1994 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 4.8.1.1.1.b,extending Alternate Offsite Power Circuit Surveillance Frequency from 18 to 24 Months ML20069H6311994-06-0808 June 1994 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 4.7.1.2.c,extending Interval for Three Auxiliary Feedwater Surveillance Requirements from 18 to 24 Months ML20069C3921994-05-27027 May 1994 Application for Amend to License DPR-69,revising Heatup & Cooldown Curves & LTOP Controls for Unit 2 to Support Mods to LTOP Sys Scheduled for Spring 1995 Refueling Outage ML20069C2801994-05-27027 May 1994 Application for Amends to Licenses DPR-53 & DPR-69, Revising TS Surveillance Test Interval from Monthly to Quarterly for Several Channel Functional Tests for RPS & ESFAS ML20058K2831993-12-0808 December 1993 Application for Amends to Licenses DPR-53 & DPR-69,revising TS Associated W/Content of Design Features ML20059L4051993-11-11011 November 1993 Application for Amends to Licenses DPR-53 & DPR-69,revising TSs by Relocating Tables of Response Time Limits for Reactor Protection Sys & ESFAS Instruments from TSs to Updated FSAR 1999-09-01
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20211J9861999-09-0101 September 1999 Application for Amends to Licenses DPR-53 & DPR-69,changing Definition of Azimuthal Power Tilt in TS 1.1,correcting Peak Linear Heat Rate Safety Limit in TS 2.1.1.2 & Correcting Dc Voltage Range Listed in Surveillance Requirement 3.3.6.2 ML20211J3431999-09-0101 September 1999 Amends 231 & 207 to Licenses DPR-53 & DPR-69,respectively, Revising Appropriate TSs to Permit Use of leak-limiting Alloy 800 Repair Sleeves Developed by ABB-CE ML20211G7591999-08-27027 August 1999 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 3.7.13 to Allow Placement of One or More Fuel Assemblies on SFP Rack Spacers to Support Fuel Reconstruction Activities During Continuing Fuel Assembly Movement ML20207L2911999-03-0808 March 1999 Amend 205 to License DPR-69,permitting One Time Change to TS 3.8.2 to Provide Alternate Cooling to EDGs During Replacement of Service Water Heat Exchangers in 1999 Refueling Outage ML20196J6721998-12-0808 December 1998 Amends 229 & 204 to Licenses DPR-53 & DPR-69,respectively, Revising TS 3.3.1 & TS 3.3.2 to Clarify Inconsistency Between TS Wording & Design Bases as Described in TS Bases & UFSAR ML20196E2101998-11-30030 November 1998 Application for Amends to Licenses DPR-53 & DPR-69,allowing Repair of Defective SG Tubes with leak-limiting Alloy 800 sleeves.Non-proprietary Rev 03-P to CEN-633-NP & Proprietary Rev 03-P to CEN-633-P,encl.Proprietary Info Withheld ML20195K3711998-11-20020 November 1998 Application for Amends to Licenses DPR-53 & DPR-69,removing TS Originally Developed from Reg Guide 1.35 & Implementing Requirements of 1992 Edition Through 1992 Addenda of ASME B&PV Code Section Xi,Subsections IWE & Iwl,Per 10CFR50.55a ML20196A6001998-11-20020 November 1998 Application for Amends to Licenses DPR-53 & DPR-69, Requesting Indirect Transfer of Control,Pursuant to 10CFR72.50,of Matls License SNM-2505 for Plant ISFSI ML20195J7131998-11-19019 November 1998 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 3.7.6, SWS, by Adding One SWS Heat Exchanger Inoperable as New Condition for LCO 3.7.6 ML20154N1861998-10-16016 October 1998 Application for Amends to Licenses DPR-53 & DPR-69 to Incorporate Revised TS 3.3.1 & 3.3.2 to Clarify Inconsistency Between TS Wording & Design Bases as Described in TS Bases & UFSAR ML20236S1341998-07-20020 July 1998 Application for Amend to License DPR-59,implementing Mod That Involves Replacing SW Heat Exchangers W/New Plate & Frame Heat Exchangers Having Increased Thermal Performance Capability ML20236S5591998-07-20020 July 1998 Application for Amend to Licenses DPR-53 & DPR-69,providing Alternate Cooling Water Supply to Maintain EDGs Operability During 1999 Refueling Outage ML20249C0021998-06-23023 June 1998 Corrected Amends 227 & 201 to Licenses DPR-53 & DPR-69. Revision Due to Failure to Include Pages 10-13,Section 3.4, Reactor Coolant Sys, or Se,Table L,Matrix of Less Restrictive Changes & in Bases,Page B 3.7.6-5 ML20248B0131998-05-23023 May 1998 Amends 228 & 202 to Licenses DPR-53 & DPR-69,respectively, Revising TS for Reduction of Total Reactor Coolant Sys Flow Limit from 370,000 Gpm to 340,000 Gpm in Support of Increased SG Tube Plugging ML20216H1661998-03-17017 March 1998 Amends 226 & 200 to Licenses DPR-53 & DPR-69,respectively, Change TSs to Incorporate Both Steady State & Transient Degraded Voltage Setpoints as Opposed to Current Single Degraded Voltage Setpoints ML20203A6461998-02-10010 February 1998 Amend 225 to License DPR-53,authorizing Rev of UFSAR in Response to as Supplemented 971114,to Reflect Installation of Svc Water HX W/New Plate & Frame HX ML20198K9591998-01-12012 January 1998 Rev 11 to 961204 Application for Amends to Licenses DPR-53 & DPR-69,converting to Improved Sts,Per NUREG-1432 ML20198K5481998-01-0505 January 1998 Amend 224 to License DPR-53,consisting of Changes to TSs 4.8.1.1.2.a.5,4.8.1.1.2.d.4 & 4.8.1.1.2.d.5,in Response to Application Transmitted by ML20202C3561997-11-18018 November 1997 Amends 223 & 199 to Licenses DPR-53 & DPR-69,respectively, Incorporating Refs to New C-E TR Describing SG Tube Sleeves, Deleting Refs to Previous C-E TR & Incorporating Sleeve/Tube Insp Scope & Expansion Criterion ML20217K6591997-10-22022 October 1997 Application for Amends to Licenses DPR-53 & DPR-69, Incorporating Both Steady State & Transient Degraded Voltage Setpoints Into Tss,As Opposed to Current Single Degraded Voltage Setpoint ML20211J2691997-10-0202 October 1997 Application for Amend to License DPR-53,revising TS to Reflect New Electrical Capacity for 1B Edg.Significant Hazards Considerations Associated W/Change Have Been Evaluated ML20141F9181997-05-16016 May 1997 Application for Amend to License DPR-53,implementing Mod Involves Replacing Service Water Heat Exchangers W/New Plate & Frame Heat Exchangers Having Increased Thermal Performance Capability ML20135F7971997-03-0707 March 1997 Amends 221 & 197 to Licenses DPR-53 & DPR-69.Amends Modify TSs Requirements to Allow Use of Blind Flanges During Modes 1-4 in Plants Unit 1 & 2 Containment Purge Sys Instead of Two Outboard 48 Inch Isolation Valves ML20136A9751997-03-0606 March 1997 Application for Amend to License DPR-69,allowing Mod to Unit 2 SW Sys Which Constitutes Unreviewed Safety Question in 10CFR50.59 ML20134N6951997-02-19019 February 1997 Amend 220 to License DPR-53 Concerning Provisions at Plant for Receiving,Possessing & Using Byproduct,Source & Special Nuclear Matl ML20134K7261997-02-11011 February 1997 Amends 219 & 196 to Licenses DPR-53 & DPR-69,changing TSs in Response to & Adopting Option B,10CFR50,app J to Require Type B & C Containment Leakage Testing to Be Performed on Performance Based Testing Schedule ML20134D2871997-01-31031 January 1997 Application for Amends to Licenses DPR-53 & DPR-69,changing to Support Larger Number of Plugged SG Tubes for Future Operating Cycles ML20149M0801996-12-0404 December 1996 Application for Amends to Licenses DPR-53 & DPR-69,revising TSs to Be Generally Consistent w/NUREG-1432,Rev 1,thus Replacing 2 Current Sets of TSs W/Single Set Applicable to Both Units ML20135A5171996-11-26026 November 1996 Application for Amends to Licenses DPR-53 & DPR-69,adopting Option B of 10CFR50,App J,To Require Types B & C Containment Leakage Rate Testing to Be Performed on performance-based Testing Schedule ML20129D6911996-10-18018 October 1996 Amends 217 & 194 to Licenses DPR-53 & DPR-69,respectively, Implementing Changes to RETS IAW GL 89-01, Implementation of Programmatic for Radiological Effluent TS in Admin Controls Section of TSs & Relocation of Procedural.. ML20128H5971996-10-0303 October 1996 Application for Amend to License DPR-53,changing Provisions for Receiving,Possessing & Using Byproduct,Source & Special Nuclear Matl at Plant ML20117L7801996-09-10010 September 1996 Application for Amends to Licenses DPR-53 & DPR-69 Requesting Extension of ESFAS Automatic Actuation Logic Surveillance from Monthly to Quarterly ML20117H6211996-08-26026 August 1996 Amends 216 & 193 to Licenses DPR-53 & DPR-69,respectively, Revising TS Section 6.0 Administrative Controls to Be Consistent W/Sts & Allow STA to Perform Dual Roles ML20116F8231996-08-0101 August 1996 Application for Amends to Licenses DPR-53 & DPR-69,allowing Use of Blind Flanges During Modes 1-4 in Plant Containment Purge Sys ML20116E3571996-07-26026 July 1996 Application for Amends to Licenses DPR-53 & DPR-69,to Repair Defective SG Tubes by Electrosleeving ML20112J3271996-06-17017 June 1996 Amends 215 & 192 to Licenses DPR-53 & DPR-69,revising Applicable UFSAR Sections to Reflect Installation of Variable Flow Controller for Service Water Inlet Control Valves for Containment Air Coolers ML20117J1911996-05-28028 May 1996 Application for Amend to License DPR-53 & DPR-69,requesting Exigent Amends to Allow Installation of Proposed Modification of Unit 1 & 2 Service Water (SRW) Systems ML20101N3101996-04-0202 April 1996 Amends 214 & 191 to Licenses DPR-53 & DPR-69,respectively, Reflecting New Plant Electrical Distribution Configuration, Surveillance & Limiting Condition for Operation of New SR EDG ML20101K5911996-03-28028 March 1996 Application for Amends to Licenses DPR-53 & DPR-69, Requesting to Reduce Moderator Temp Coefficient Limit Shown on TS Figure 3.1.1-1 ML20101G9181996-03-22022 March 1996 Amends 213 & 190 to Licenses DPR-53 & DPR-69,respectively, Allowing Installation of Tube Sleeves as Alternative to Plugging for Repairing SG Tubes Using Repair Techniques Developed by Westinghouse Electric Corp ML20101D8211996-03-15015 March 1996 Suppl to LAR Re Sleeving Option for SG Tube Repair.Proposes Rev to TS Wording in Attachments (A-3) & (A-4) by Removing Generic Ref to Technical Repts & Replace W/Ref to Specfic Approved Repts ML20101G2791996-03-13013 March 1996 Amends 212 & 189 to Licenses DPR-53 & DPR-69,respectively, Revising TSs to Reflect Approval for Use of 10CFR50,App J, Option B,For Plant Containment Leakage Rate Test Program for Type a Tests ML20100H1321996-02-21021 February 1996 Amend 211 to License DPR-53,allowing Use of Cladding Matl Other than Zircaloy or ZIRLO ML20097E3461996-02-0505 February 1996 Amends 210 & 188 to Licenses DPR-53 & DPR-69,respectively, Adding Convolution Analytical Technique for Analysis of Pretrip MSLB Event ML20096D4291996-01-16016 January 1996 Application for Amends to Licenses DPR-53 & DPR-69,adopting Option B of 10CFR50,App J to Require Type a Containment Lrt to Be Performed on performance-based Testing Schedule ML20095L7481995-12-28028 December 1995 Amend 209 to License DPR-53,revising CC-1 TSs by Extending Certain 18-month Instrument Surveillance Intervals by Max of 39 Days to 960331 ML20095K2701995-12-21021 December 1995 Application for Amends to Licenses DPR-53 & DPR-59, Requesting Temporary Exemption & TS Change to Allow Placement of Four Lead Test Fuel Assemblies in Unit 1 Reactor Core During Cycles 13,14 & 15 ML20095C7421995-12-0707 December 1995 Application for Amends to Licenses DPR-53 & DPR-69 to Add Analysis Technique to List of Approved Core Operating Limits Analytical Methods in TS for Plant ML20094S1481995-11-30030 November 1995 Application for Amends to Licenses DPR-53 & DPR-59,allowing Installation of Tube Sleeves as Alternative to Plugging to Repair Defective SG Tubes ML20094D6131995-11-0101 November 1995 Application for Amends to Licenses DPR-53 & DPR-69,upgrading ESF Electrical Sys at Plant to Provide Addl Protection from Loss of Electrical Power 1999-09-01
[Table view] |
Text
-
BALTIMORE GAS AND
- ELECTRIC CHARLES CENTER.P. O. BOX 1475 BALTIMORE, MARYLAND 21203
. ARTHun E". LONOVALL..jR.
vice p=csecia Supav Director of Nuclear Reactor Regulation Attentiom Mr. R. A. Clark, Chief Operating Reactors Branch #3
' Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Subject:
Calvert Cliffs Nuclear Power Plant Units Nos.1 & 2; Dockets Nos. 50-317 and 50-318 Fire Protection Schedular Relief
' Gentlemen:
Baltimore Gas and Electric Company, pursuant to 10 CFR Part 50, paragraph 50.12, hereby requests an exemption from the schedular requirements of 10 CFR 50.48(c) l for certain emergency lighting modifications required by 10 CFR 50, Appendix R, j
Paragraph III.3, as described below. In addition, this letter clarifles the fire detection and suppression systems which are installed in the Calvert Cliffs main control room and intake structure.
Exemption Request i
l 10 CFR 50.48(c) states that those fire protection features that require prior i
NRC approval shall be implemented 6 months after NRC approval for items not requiring plant shutdown ~or before startup after the earliest outage of certain specified durations commencing 180 days after NRC approval for those items which do require plant shutdown. A maximum of 65 battery powered emergency lighting banks remain to be installed in Calvert Cliffs Units 1 and 2. These installations were heavily dependent on i
the NRC approval of equipment evaluations contained in our Interactive Cable nnalyses (ICA) for Unit I and Unit 2.
The NRC approval of these ICA's was contained in
~
Supplement 3 to the Fire Protection Safety Evaluation Report (FPSER), dated September 27,- 1982. Using the guidelines of 10 CFR 50.48(c)(4), those emergency lights whose installation does not require plant shutdown should.be installed by March 27, 1983. We request an extension of this date to September 1,1983.
7 Approximately five of the lighting banks are to be installed in areas which are i
inaccessible during normal operation. These areas are the 27' elevation west penetration rooms and the volume control tank rooms for both Units. Our interpretation of 10 CFR 50.48(c)(3) is that the installation of these lighting banks may be accomplished during the first outage of sufficient duration specified in paragraph 50.48(c)(3), and we request that you notify us if this interpretation is not correct.
i 8303020035 830223 PDR ADOCK 05000317 1
0 p
PDR h
. ~ -
Mr. R. A. Clark 2-Februtry 23,1983 -
The reason fo our requested extension is that, at the time of ' the
, September 27,1982 FPSER. supplement, our engineering and planning resources were heavily committed;to the imminent Unit No. 2 refueling ' outage, which commenced on October 16, 1982 and was completed on January 16, 1983. We were not able to include any emergency lighting modification work in-that outage interval, but we did begin making the modifications after the completion of the outage. We now estimate that all of the non-outage related lighting modifications should be complete by Setpember 1, 1983. During this same time frame, we will be adding several new Jacks to the existing fire protection sound-powered phone system.
c Clarification Supplement 3 to the FPSER, dated September 27,1982 states in Paragraph C that "... all other areas of the plant not required to have an alternate shutdown system will comply with the requirements of Section III.G.2 of Appendix R...." Our reading of this statement leads us to conclude that it may be necessary to restate and clarify our fire protection design for two areas of the plant; namely, the control room and the intake structure. As previously documented in the NRC's FPSER and supplements, as well as in t
our Fire Hazards Analyses and the NRC consultant's reviews of our analyses, we have provided for automatic fire detection and fixed (fire hose) fire suppression in those areas of the plant. We have identified the intake structure as having sufficient separation of redundant equipment and cabling so as not to require the installation of automatic sprinklers, and we have identified the control room as being continuously manned and backed up by alternative shutdown provisions, so as to not require sprinklers..Although 1
we were confident that the NRC had acknowledged these designs as acceptable, we feel obligated to reiterate the design configuration based on the broad statement previously cited from the FPSER Supplement. Our letter of May 14, 1982, which was the basis for the statement in the FPSER Supplement, contained a table which identified those areas i
of the plant for which the cable routing was in accordance with Section III.G.2 of Appendix R and those areas which were to be modified to provide alternate safe 4
shutdown in accordance with Section III.L.
That table was constructed only as a convenience for the NRC and its consultant in reviewing our ICA's and was not intended to serve as an upgraded commitment to install automatic or manual sprinklers in either area.
We hope this clarified the design of our fire protection system within the intake structure and control room.
Safety Committee Review i -
This request for an exemption has been reviewed by our Plant Operations and Safety Review and Offsite Safety Review Committees, and they have determined that granting the exemption will not endanger life or property or the common defense and security. This conclusion is based, in part, on the fact that the installation of emergency lighting is proceeding on a priority basis with the most critical lights being installed first and commensurate with the associated equipment installations; that emergency lighting has previously been installed and approved for access and egress to and from certain areas; and that sufficient' other fire protection measures exist within the plant to prevent, detect, extinguish and otherwise mitigate the effects of an incipient fire during the relatively short interval covered by the requested extension.
i
- -.. _ _,.. _. -.. - _ _..... - -. -.,.. _ -. _ -.~. _.., _ _., _ _ _. _. -..- - _.. _,..___
Mr. R. A. Clark February 23,1983 Fee Determination We have determined, pursuant to 10 CFR Part 170, that this request for an exemption constitutes Class III and Class I Amendments to Operating Licenses DPR-53 and DPR-69, respectively, inasmuch as a single issue is involved; and, accordingly, we are enclosing BG&E Check No. A111790 in the amount of $4,400.00 to cover this request.
BALTIMORE GAS & ELECTRIC COMPANY
/
By:
A. E. Lundvall, Jr.
Vice President L Supply STATE OF MARYLAND :
TO WIT:
CITY OF BALTIMORE Arthur E. Lundvall, Jr., being duly sworn, states that he is Vice President of the Baltimore Gas and Electric Company, a Corporation of the State of Maryland; that he executed the foregoing for the purposes therein set forth; that the statements made therein are true and correct to the best of his knowledge, information, and belief; and that he was authorized to execute the same on behalf of said Corporation.
WITNESS My Hand and NotarialSeal:
/
C(k A / AL/
Notary Public ' ~
/r/ 'h My Commission Expires:
1AIAf y
ate AEL/RCLO/gvg Enclosure cc: 3. A. Biddison, Jr., Esq.
G. F. Trowbridge, Esq.
Mr. D. H. Jaffe, NRC Mr. R. E. Architzel, NRC l
e e
Mr. R. A. Clark Fcbruary 23,1983 bcc: Messrs. A. E. Lundvall, Jr.
G. C. Creel R. M. Douglass R. H. Kent S. A. Rittenhouse -
- 3. A. Tiernan/D. W. Latham R. F. Ash / File
- 3. T. Carroll /G. S. Pavis C. H. Cruse /T. N. Pritchett S. E. Jones P. E. Katz B. S. Montgomery R. C. L. Olson M. D. Patterson A. R. Thornton/3. M. Dahlquist, Jr.
E. "R" Zumwalt -
1 J
E
..