D THE ' CINCINNATI GAS & ELECTRIC COMPANY mK' CIN CINNATI.OHlO 452ol February 7, 1983 QA-2248' C A. eORGMANN SENIOR VICE PREhlDENT U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attention:
Mr. J. G. Keppler Regional Administrator RE:
WM. H. ZIMMER NUCLEAR POWER STATION UNIT I 10CFR50.55(e) - ITEM M-29, LACK OF WELD PROCEDURE QUALIFICATION - DOCK T NO. 50-358, CONSTRUCTION PERMIT NO. CPPR-88, W.O. #57300
' JOB E-5590 FILE NO. NRC-8, M-29~
Gentlemen:
This letter constitutes a follow-up report to our report QA-2030, dated November 2, 1982, concerning the subject condition. As stated in
~
that report, the Zimmer Quality Confirmation Program and CG&E Quality Engineering have been reviewing and evaluating the adequacy of H. J.
Kaiser welding procedures.
A Welding Review Group has been formed to investigate and resolve any problems with HJK Welding Procedures. This group is comprised of representatives from the following organizations:
CG&E Nuclear Engineering Department CG&E Quality Confirmation Program CG&E Quality Engineering Sargent & Lundy Engineering H. J. Kaiser Weld Engineering H. J. Kaiser Quality Engineering All revisions of each Welding Procedure Specification (WPS) will be reviewed and a qualification review package developed. Each package will contain the original weld documents and other supporting data. The review will be accomplished according to approved procedures and divided into Phases of (1) Problem Identification (2) Technical Evaluation and (3) Problem Resolution. Where Welding Procedures or their qualifications are determined to be inadequate, the Welding Review Group will develop a corrective action plan to address any hardware related concerns as required.
N c) i 8302280435 830207 PDR ADOCK 05000358 FEB 2 5 g S
r L.* -
.\\
.-Mr. J. G..Keppler Region III
. February 7, 1983
'QA-2248 Pagn 2 New Welding Procedures will~be developed for future welding at:
Zimmer and qualified under controlled. conditions. The existing pro-cedures will be retired.-
A follow-up report will be submitted.by April 30, 1983.
We trust the above will be-found acceptable as an interim report under 10CFR50.55(e).
.Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY g = c--
E. A. BORGMANN SENIOR VICE PRESIDENT BLM:as cc: NRC Office of Inspection & Enforcement.'