ML20071A920

From kanterella
Jump to navigation Jump to search
Requests Authorization to Begin Auxiliary Bldg Underpinning Pier 11 const-related Activities
ML20071A920
Person / Time
Site: Midland
Issue date: 02/09/1983
From: Miller D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
CSC-6544, NUDOCS 8302250225
Download: ML20071A920 (1)


Text

.

PRINCIPAL STAFF 34 ENF ,

gSs/

im 3 CORSum813 $^3 o f Power wa* SLO

@^ ac company (MLSP kP. t _

Midland Project: Po Box 1963, Midland, MI 48640 e (517) 6314650 g, 0, FitE tu f /) .

February 9, 1983 Mr. W. D. Shafer, Chief Midland Project Section US Nuclear Regulatory Commission

' Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDLAND PROJECT GWO 7020 AUTHORIZATION FOR AUXILIARY BUILDING UNDERPINNING PIER 11 File: ~0485.16 UFI: 43*05*22*04 Serial: CSC-6544 12*32 We have completed our review of the documents for Pier 11 E&W including the load test on Pier 11 West. Based on our review, we have -concluded that we are ready to start the work.

According to the NRC/CPCo Work Authorization Procedure, we request authori-zation for the following activities:

155052027 Drift from access shaft to Pier 11E 155053015 Excavate Pier 11E 155054015 Install and load Pier llE 165052027 Drift from Access Shaft to Pier 11W 165053015 Excavate Pier 11W

, 165054015 Install and load Pier 11W (includes install bituminous plywood forms) 105050908 Perform Pier load test Please note that the activities listed above are similar to the corresponding l activities for Pier which ave previously been authorized.

D. B. Miller Site Manager l DBM/RMW/dmw

~