Requests Authorization to Begin Auxiliary Bldg Underpinning Pier 11 const-related Activities
ML20071A920
Person / Time
Site: Midland
Issue date: 02/09/1983
From: Miller D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
CSC-6544, NUDOCS 8302250225
Download: ML20071A920 (1)


Text

.

PRINCIPAL STAFF 34 ENF im 3

CORSum813

$^3 gSs/

f o

Power wa*

SLO company

@^

ac (MLSP kP.

t Midland Project: Po Box 1963, Midland, MI 48640 e (517) 6314650 g,

tu f /).

0, FitE February 9, 1983 Mr. W. D. Shafer, Chief Midland Project Section US Nuclear Regulatory Commission

' Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDLAND PROJECT GWO 7020 AUTHORIZATION FOR AUXILIARY BUILDING UNDERPINNING PIER 11 File: ~0485.16 UFI:

43*05*22*04 Serial: CSC-6544 12*32 We have completed our review of the documents for Pier 11 E&W including the load test on Pier 11 West.

Based on our review, we have -concluded that we are ready to start the work.

According to the NRC/CPCo Work Authorization Procedure, we request authori-zation for the following activities:

155052027 Drift from access shaft to Pier 11E 155053015 Excavate Pier 11E 155054015 Install and load Pier llE 165052027 Drift from Access Shaft to Pier 11W 165053015 Excavate Pier 11W 165054015 Install and load Pier 11W (includes install bituminous plywood forms) 105050908 Perform Pier load test Please note that the activities listed above are similar to the corresponding l

activities for Pier which ave previously been authorized.

D. B. Miller Site Manager l