ML20071A144
| ML20071A144 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 01/21/1983 |
| From: | Edelman M CLEVELAND ELECTRIC ILLUMINATING CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20071A128 | List: |
| References | |
| NUDOCS 8302180434 | |
| Download: ML20071A144 (2) | |
Text
.
1'!'[
i' !
V F !,n, sL0
~
~'
P '
"r,. 'u
.i o.
,n'i i '.
c t-n.
. u o
1,
-~
c u P.o. box 5000 - CLEVELAND. oHlo 44101 - TELEPHONE (216) 622-9800 - lLLUMINATING BLDG.
- 55 PUBLICSOUARE Serving The Best Location in the Nation MURRAY R. EDELMAN January 21, 1983 VICE PRESIDENT NUCMAR Mr. James G. Keppler Regional Administrator, Region III Of fice of Inspection and Enforcement U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 RE:
Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Response to I.E. Report 50-440/81-19; 50-441/81-19 Transmitted September 27, 1982
Dear Mr. Keppler:
Please refer to pages 7 and 8 of Attachment A to our letter dated October 27, 1982, responding to I.E. Report 50-440/81-19; 50-441/81-19.
It has come co my attention that additional information is necessary to update our response to Noncompliance 440/81-19-03; 441/81-19-03, example a.
Mr. V. Higaki of The Cleveland Electric Illuminating Company discussed this matter with Mr. H. Wescott of your of fice on January 14, 1983.
Paragraph a. (1) states in part:
" Penetration inspection records have been reviewed by the Project Organization Engineering Group.
The records are incomplete and the contractor is in the arocess of completing the records. This item will be resolved by December 15, 1982."
In accordance with this response, Project Organization Engineering Group did review the penetration inspection records.
In response to Engineering's question, Pullman Power supplied L. K. Comstock with the documentation to address Project Organization Engineering.
This was accomplished by the December 15, 1982, deadline.
However, during the L. K. Comstock receipt and review of this material, a number cf questions have arisen that require further discussion.
Pullman and L. K. Comstock will be meeting in the near future.
It is anticipated that resolution will be achieved by March 15, 1983.
8302180434 830214 PDR ADOCK 05000440 JAN 2 7 1983 0
Mr. James G. Keppler January 21, 1983 Additionally, our response a.(2) on page 7 and 8 states that reverification
. programs for the Switchgear, Unit Substation and Motor Control Centers were in progress and that the reverification will be completed by January 14, 1983.
This activity has been accomplished. As a result of the reverification, dispositions to several Nonconformance Reports are awaiting vendor concurrence and are the last outstanding items requiring address for response a.(2).
If there are additional questions, please do not hesitate to call.
l Sincerely, Murray R.
elman Vice President Nuclear Group MRE:pab cc:
Mr. M. L. Gildner NRC Site Office U.S. Nuclear Regulatory Commission c/o Document Management Branch Washington, D.C.
20555 l
-_m s
.