Forwards Petition to File late-filed Contention Re Issue of Current Viability of River Follower Method in Light of Increased Cost of Const
ML20071A112
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 02/14/1983
From: Sugarman R
DEL-AWARE UNLIMITED, INC., SUGARMAN & ASSOCIATES
To: Brenner L, Cole R, Morris P
Atomic Safety and Licensing Board Panel
Shared Package
ML20071A114 List:
References
NUDOCS 8302180419
Download: ML20071A112 (1)


Text

SUGARM AN & DENWORTH ATTOR N EYS AT LAW susic so3 RO B ERT J. SUG ARM AN suits bio. NonTH Au gnicaN,a sto JOANNE R.DENWORTH 121 SOUTH BROAD STREET

taca> rst-seeo H

A N 5 A A 107 MARYB.COE R3 BIN T. LOCKE (als) 546-ossa ROBERT RAYMOND ELUOTT, P. C.*

COUNSCL

  • Not ADesstigo en pa February I, 1983 Administrative Judge Lawrence Brenner Administrative Judge Richard F.

Cole Administrative Judge Peter A. Morris Atomic Safety & Licensing Board U.S.

Nuclear Regulatory Commission Washington, D.C.

20555 Re:

Application of Philadelphia Electric Company, No. 50-352, 353

Dear Judges:

Enclosed for filing is Petitioner's request to be permitted to file contention to deal with the issue of the current viability of the river follower method, both relatively and absolutely, in light of the increased cost of construction of Unit 1, combined with other factors.

I appreciate the Board's consideration in this matter.

Si. erely

\\

Robert J.

garman RJS/jes cc:

All Counsel I

0302100419 830214 PDR ADOCK 05000352 PDR b