Interim Deficiency Rept M-40 Re Indeterminate Heat Treatment for Small Bore Pipe.Removal of Pipe for Destructive Tests to Determine Heat Treatment Contingent Upon NRC Release of Stop Work Order.Followup Rept to Be Submitted by 830415
ML20070W062
Person / Time
Site: Zimmer
Issue date: 02/08/1983
From: Borgmann E
CINCINNATI GAS & ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, M-40, QA-2253, NUDOCS 8302180253
Download: ML20070W062 (1)


Text

..

e THE CINCINNATI GAS & ELECTRIC COMPANY d CINCINN ATI. OHIO 452ol February 8, 1983 QA-2253 E. A. BORG MAN N SENton vaCE PRESsOENT U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attention: Mr. J. G. Keppler Regional Administrator RE: WM. H. ZIMMER NUCLEAR POWER STATION UNIT I 10CFR50.55(e) - ITEM M INDETERMINATE HEAT TREATMENT FOR SMALL BORE PIPE - DOCKET NO. 50-358, CONSTRUCTION PERMIT NO. CPPR-88, W.O. #57300 JOB E-5590 FILE NO. NRC-8, M-40 Gentlemen:

This letter constitutes an interim report concerning the subject condition, initially reported to the Commission as a potentially re-portable deficiency under the requirements of 10CFR50.55(e).

As stated in cur previous report, QA-2075, dated October 25, 1982, CG&E intends to perform destructive tests to determine the heat treatment for samples of four heats of piping listed on NR #E-4337. A document review has identified the locations of each heat in the plant, however, because of the NRC's November 12, 1982 " Order to Show Cause and Order Immediately Suspending Construction," this pipe could not be cut out for the necessary tests by the expected completion date.

The removal of the pipe is, therefore, contingent upon the release of the Commission's Order for work in this area. A follow-up report will be submitted by April 15, 1983.

We trust the above will be found acceptable as an interim report under 10CFR50.55(e).

Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY

,wp -

By E. A. BORGMANN 8302180253 830208 SENIOR VICE PRESIDENT PDR ADOCK 05000358 S PDR FKP:as cc: NRC Office of Inspection & Enforcement Zimmer Project Inspector Washington, D.C. 20555 Region III NRC Senior Resident Inspector Attn: W. F. Christianson FEB 141983