The Light Company ri-mn usmng i><- m ux mo ri-mn.wxas mouwm.<mi January 31, 1983 ST-HL-AE-931 File Number: G25 Mr. Thomas M. Novak Assistant Director of Licensing U. S. Nuclear Regulatory Commission Washington, D. C.
20555
Dear Mr. Novak:
South Texas Project Units 1 & 2 Docket Nos. STN 50-498, STN 50-499 Control Room Design Review Program Plan Houston Lighting & Power Company (HL&P) submitted a letter to you dated October 20, 1982 which transmitted the South Texas Project (STP) Control Room Design Review (CRDR) Program Plan and described the program schedule. The schedule provided indicated that the CRDR would be complete in February 1983 and that the CRDR Final Report would be submitted on February 28, 1983. The above schedule was based on the cssumption that identified human engineering discrepancies could be corrected and engineering design changes could be implemented using th'e existing STP control panels. Based on the scope of the design changes identified in the review, it now appears prudent to make additional modifications to some of the control panels.
HL&P has revised the CRDR schedule to be consistent with the redesign schedule. HL&P now expects to have the CRDR Criteria Report complete in early February 1983 and to submit the CRDR Implementation Report by April 11, 1983.
This report will outline proposed coritrol room changes based on identified human engineering discrepancies and engineering design changes.
The redesigned control panels will be validated in mid 1983 and the CRDR Final Report will Le cubmitted by October 17, 1983. The NRC in-progress audit discussed in the October 29, 1982 letter should be rescheduled for mid April 1983 to support a timely review of the CRDR results.
If you should have any questions concerning this matter, please contact Mr. Michael E. Powell at (713)877-3281.
l Very truly yours,
[
t J. H. Goldberg Vice President Nuclear Engineering and Construction MAM/mg 0
A
llouston Lighting & Powcr Company January 31, 1983 cc:
G. W. Oprea, Jr, ST-HL-AE-931 J. H. Goldberg File Number: G25 J. G. Dewease Page 2 J. D. Parsons D. G. Barker M. R. Wisenburg R. A. Frazar J. W. Williams R. J. Maroni J. E. Geiger H. A. Walker S. M. Dew J. T. Collins (NRC)
H. E. Schierling (NRC)
W. M. Hill, Jr.
NRC)
M. D. Schwarz Baker &Botts)
R. Gordon Gooch Baker & Botts)
J. R. Newman (Lowenstein, Newman, Reis, & Axelrad)
STP RMS Director, Office of Inspection & Enforcement Nuclear Regulatory Commission Washington, D. C. 20555 G. W. Muench/R. L. Range Charles Bechhoefer, Esquire Central Power & Light Company Chairman, Atomic Safety & Licensing Board P. O. Box 2121 U. S. Nuclear Regulatory Commission Corpus Christi, Texas 78403 Washington, D. C.
20555 H. L. Peterson/G. Pokorny Dr. James C. Lamb, III p
City of Austin 313 Woodhaven Road P. O. Box 1088 Chapel Hill, North Carolina 27514 l
l J. B. Poston/A. vonRosenberg Mr. Ernest E. Hill City Public Service Board Lawrence Livermore Laboratory i
l P. O. Box 1771 University of California San Antonio, Texas 78296 P. O. Box 808, L-46 Livermore, California 94550 Brian E. Berwick, Esquire William S. Jordan, III Assistant Attorney General Harmon & Weiss for the State of Texas 1725 I Street, N. W.
P. O. Box 12548 Suite 506 Capitol Station Washington, D. C.
20006 Austin, Texas 78711 Lanny Sinkin Citizens for Equitable Utilities, Inc.
Citizens Concerned About Nuclear Power c/o Ms. Peggy Buchorn i
5106 Casa Oro Route 1, Box 1684 j
San Antonio, Texas 78233 Brazoria, Texas 77422 l
Jay Gutierrez, Esquire Hearing Attorney Office of the Executive Legal Director U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Revision Date 12-20-82