PutSC $PfVke ll6ctne arid GM Compaay Thomas M, Crimmins, Jr.
Pub 5C Service Electoc and Gas Compe.ay P.O Box 23E Hancom Bodyt NJ 08038 609-339 4700 s ce %oet N a g ne y MAR 2 8 1991 NLR-N91042 i
S.
Nuclear Regulatory Commission Do ument Control Desk Washington, DC 20555 Gentlemen:
WIDE RANGE NEUTRON FLUX MONITORING INSTRUMENTATION HOPE CREEK GENERATING STATION DOCKET NO. 50-354 On April 23, 1990, Public Service Electric and Gas Company (PSE&G) submitted a commitment to the NRC to provide a detailed schedule for installation of a Regulatory Guide 1.97 qualified Wide Range Neutron Monitoring System (WRNMS).
This commitment, which was made following the NRC's rejection of a BWR Owners Group (BWROG) appeal on this issue, became due within 180 days of the NRC's October 3, 1990 approval of the General Electric WRNMS design.
Since that time, PSE&G has followed the progress of a subsequent BWROG appeal of the WRNMS requirement and strongly endorses the bases of that appeal.
The WRNMS design, while providing a number of attractive features, as described in the LWROG arguments, does not provide increased safety benefit commensurate with its' attendant costs.
PSE&G believes that the resources necessary to purchace and install the WRNMS could be better expended on more safety-significant plant improvements.
Therefore, pending NRC's resolution of the BWROG appeal, we have delayed a final decision regarding a WRNMS installation-schedule.
Should you have ar./ questions regarding this letter, we will be pleased to discus them with you.
Sincerely, j
Ib f,
~~
t (e
I i
\\
bh l /1 }
6 9
910408o17e 92032e O
fDR ADOCK 05000354
\\\\%
\\
l
-+
Document Control Desk MAR 2 8 199; NLR-N91042 C
Mr. T. Martin, Administrator Region I Mr.
S.
Dembek Licensing Project Manager Mr.
T.
Johnsen Senior Resident Inspector Mr. Kent Tosch, Chief New Jersey Department of Environmental Protection Bureau of Nuclear Engineering l