ML20070U015
| ML20070U015 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 01/31/1983 |
| From: | Varga S Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20070U017 | List: |
| References | |
| NUDOCS 8302100108 | |
| Download: ML20070U015 (4) | |
Text
_~._s atroq'*
~
UN' 1D STATES
'n NUCLEAR REGI JTORY COMMISSION
{
- ,E wAsnimorow, p. c.2 cess t
\\,..../
i ALABAMA POWER COMPANY DOCKET NO. 50-348 JOSPEH M. FARLEY NUCLEAR PLANT, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment Nc. 28 License No. NPF-2 1.
The Nuclear Regulatory Commission (the Coninission) has found that:
A.
The application for amendment by Alabama Power Company (the licensee) dated November $,1982, complies with the standards and -equirements of the Atomic Energy Act of 1954, as amended (the Act) and the Conunission's rules and regulations set forth in 10 CFR Chapter I-i B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commissiont C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part
-l 51 of the Commission's regulations and all applicable requirements have been satisfied.
s' s
b $i 8302100108 830131
[
PDR ADOCK 05000340 P
PDR ll
.i 2-l t
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the ' attachment to th's license l
amendment, and paragraph 2.C.(2) of Facility Operating License j
No. NPF-2 is hereby amended to read as follows:
l (2) Technical Specifications t
i The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 28, are i
hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
i 3.
Within 90 days after the effective date of this amendment, or such later time as the Commission may specify, the licensee shall satisfy any applicable requirement of P.L.97-425 related to pursuing an agreement with the Secretary of Energy for the disposal of high-level radioactive waste and spent nuclear fuel.
4.
This license amendment is effective as of the date of its issuance.
FqRTHENUCLEARREGULATORYCOMMISSION b'
hY&g ief perating React rs Branch #1 Division of Licehsing i
Attachnent:
Changes to the Technical Specifications Date of Issuance: January 31, 1983 1
l i
t e
.,__.,,_y.
,g n.
o
ATTACHENT TO LICENSE AMEN 0 MENT AMENDMENT NO. 28 TO FACILITY OPERATING LICENSE NO. NPF-2 DOCKET NO. 50-348 Revise AppeMix A as follows:
Remove Page Insert Page 3/4 7-23 3/4 7-23
+
9 i
i s
D a
l l.
l' li 4
j
- 7 y;-=~ y
- e-
- =wa=>
~~
L
PLANT SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) 2.
Snubber bleed, or release rate, where required, is within the specified range ir. compression or tension. For enubbers specifically required to not displace under continuous load, the ability of the snubber to withstand load without displacement shall be verified.
i e.
Mechanical Snubbers Functional Test Acceptance Criteria
- The mechanical snubber functional test shall verify that:
1.
The forca that initiates free movement of the snubber rod in either tension or compressien is less than the specified maximum drag force.
i i
2.
Activation (restraining action) is achieved within the specified range in both tension and compression.
3.
Snubber release rate, where required, is within the specified range in compression or tension.
For snubbers specifically required not to displace under continuous load, the ability of the snubber to withstand load without displacement shall be i
verified.
i-l l
l l',
i i
"This portion of the specification is affective prior to startup fol10 wing'the i
fifth refuelir1 outage. However, for the fourth refueling outage a manual stroke test will be substituted for the functional test.
FARLEY-UNIT 1.
3/4 7-23 AMENDMENT NO. 28
- - - -