ML20070T750

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Rev 1 to Emergency Plan Implementing Procedure GO-EIP-117, Emergency Operations Facility Administrative Support
ML20070T750
Person / Time
Site: Farley  
Issue date: 01/24/1983
From: Clayton F
ALABAMA POWER CO.
To: Varga S
Office of Nuclear Reactor Regulation
Shared Package
ML20070T748 List:
References
NUDOCS 8302090467
Download: ML20070T750 (1)


Text

(

  • 4 4 tiling Addr:ss j

i Alabama Power Company 600 Nortn 18th Street e

Pcst Office Box 2641 Birmingham. Alabama 35291 A

, Telephone 205 783-6081 F. L. Cla yton, Jr.

R2';cL"J;d*"'

AlabamaPower tie sournern electnc system January 24, 1983 Docket No. 50-348 Docket No. 50-364 Director, Nuclear Reactor Re'gulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention:

Mr. Steve A. Varga Chief, Operating Reactors Branch

Dear Sir:

Ten (10) copies of General Office Emergency Implementing Procedure G0-EIP-117 Rev.1 are submitted herewith in accordance with the requirements' of 10CFR50.55 Appendix E.

Please have the enclosed receipt acknowledgement forms signed and returned to the addresss shown (,the forms.

Yours very truly, F. L. Clayton, Jr.

FLC/KWM:cb Enclosure xc:

Mr. K. W. McCracken File A-27.9

[@s jto C

8302090467 830203 PDR ADOCK 05000348 F

PDR

--