ML20070T327

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Underrated Motor Control Ctr Control Circuit Transformers.Gould Inadvertently Supplied 50VA Transformers.Bechtel Investigating Root Cause.Next Rept Expected by 830506
ML20070T327
Person / Time
Site: Midland
Issue date: 01/28/1983
From: Jackie Cook
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, 20679, 82-10-#2, 82-10-2, MCAR-61, NUDOCS 8302080305
Download: ML20070T327 (9)


Text

'

4 CORSumBIS power CompaRy I""i*"*_,,oj,,,o.g.,s.,

and Co.structio.

General Offices: 1946 West Parnell Road, Jackson, MI 49201 * (517) 788 0453 January 28, 1983 82-10 #2 Mr J G Keppler, Regional Administrator US Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDLAND NUCLEAR C0 GENERATION PLANT -

DOCKET N0S 50-329 AND 50-330 UNDERRATED MOTOR CONTROL CENTER CONTROL CIRCUIT TRANSFORMERS FILE:

0.4.9.66 SERIAL:

20679

Reference:

J W Cook letter to J G Keppler, Same Subject, Serial 19088, dated November 10, 1982 This letter, as was the referenced letter, is an interim 50.55(e) report on underrated control circuit transformers supplied by Gould-Brown Boveri for the 460 volt motor control centers. The attachment to this letter provides an analysis of the deficiency and the corrective action being taken with regard to this matter.

Another report, either interim or final, will be sent on or before May 6, 1983.

WRB/lr

Attachment:

MCAR-61, Interim Report 2, " Deficiencies Associated with Gould Supplied 480/120V Control Power Transformers," dated 1/21/83 CC: Document Control Desk, NRC Washington, DC RJCook, NRC Resident Inspector q,

Midland Nuclear Plant b DC.)

8302080305 830128 PDR ADOCK 05000329 S

PDR OC0183-0050A-MP01 h

Sarisi 20679 2

82-10 #2 CC: CBechhoefer, ASLB Panel RSDecker, ASLB Panel FPCowan, ASLB~ Panel AS&L Appeal Panel' MMCherry, Esq MSinclair

-BStamiris CRStephens, USNRC

'WDPaton, Esq, USNRC FJKelley,'Esq. Attorney General SHFreeman, Esq. Asst Attorney General' WHMarshall GJMerritt, Esq, TNK&J l

t 4

1 4

4 i

s 4

i OC0183-0050A-MP01

~.

Attachment to Serial 20679 8-Bechtel Associates Professional Corporation I02308 102204 Management Corrective Action Report (MCAR)

SUBJECT:

MCAR 61 (Issued 10/13/82)

Deficiencies Associated with Gould Supplied 480/120V Control Power Transformers INTERIM REPORT 2 DATE:

January 21, 1983 PROJECT:

Consumers Power Company Midland Plant Units 1 and 2, Bechtel Job 7220 INTRODUCTION:

This report provide final status and the course of Corrective Action Required Pursuant to MCAR 61.

DESCRIPTION OF DEFICIENCY:

Sixty-five Size 1 starters have been identified as having 50 VA control power transformers (CPT's). Specification 7220-E-7(Q), Appendix A, Section 2.3 requires all CPT's to be one size larger than standard with a minimum size of 100 VA.

Could Drawings (Bechtel Vendor Print 7220-E7-ll, 12, 13, 19, 20, 25, 26, 27, 28, 29, and 30) also indicate that these CPT's are 100 VA.

SUMMARY

OF INVESTIGATION AND HISTORICAL BACKGROUND:

This deficiency was discovered during field modifications of the Class 1E motor conrol centers (MCC's) and was documented in Bechtel NCR 4509.

ANALYSIS OF SAFETY IMPLICATIONS:

An investigation was conducted to determine the effect of using 50 VA i

l CPT's in Size 1 starters assuming minimum utilization voltage on the MCC bus. The results indicate that a voltage potentially below the limits for proper operation of the MCC starter coils could result. If this mimimum design voltage (414 volts) condition were to occur, Class lE l

l equipment necessary to safely operate the plant may fail to operate.

i i

PROBABLE CAUSE:

Could has stated that the 50VA transformers were inadvertently supplied (reference letter from Brown-Boveri Electric, Inc. dated 12/22/82, Com 99297). The root cause will be further addressed by Bechtel Supplir.'

Quality in a future report.

CORRECTIVE ACTION:

The recommended corrective actions to resolve this MCAR are as follows:

i

Bechtel Associates Professional Corporation 102308 102204 MCAR 61 Interim Report 2 Page 2 1.

All 50 VA CPT's are to be replaced with 100 VA CPT's.

The vendor has been contacted and has agreed to supply replacement 50 VA CPT's.

The completion date for this item will be addressed in a future report.

2.

All the starters listed on Attachments 1 and 2 have been inspected. lists all locations where incorrectly sized transformers were found.

3.

Gould has stated that they will make all affected personnel aware that they should check all documentation before supplying spare parts on existing projects. Bechtel has revised the hold points for Purchase Order 7220-E-7(Q) to include veri.#tcation of the control power transformer rating.

4.

Fechtel Supplier Quality corrective action will be addressed in a future report.

REPORTABILITY:

Based on the safety implications this deficiency is considered reportable in accordance with Title 10 of the code of Federal Regulation Part 50.55(e).

b~

Submitted by:

l

, ef J.G. Kovach U

Electrical Group Supervisor Approved by:

p

/ _

E.M. Hughes Project Engineer l

Concurrence by.

R.L. Castleberry Electric 1 Ch ef Concurrence by:

dit t A

E.H. Sm'ith Engineering Manager Concurrence by.

M.A. Dietrich l

Project Quality 618 Assurance Engineer g

/SB/se(E)

JGK l

1/10/5-4

Attachment:

1.

Location of All Class lE Size 1 Starters Supplied by Gould 2.

Location.of All Class lE Size 2 and Larger Starters Supplied by Gould 3.

Location of Starters with Incorrectly Sized Transformers l

Bechtel Associates Professional Corporation I02204 102308 Page 1 of 2 LOCATION OF ALL CLASS 1E SIZE 1 STARTERS SUPPLIED BY GOULL (CPTs SIZE 100VA)

MOTOR CONTROL CENTERS:

MCC CUBICLE LOCA110N 1B23 2C, 2D, 2E, 3B, 3D, 4A, 4B, 4D, 4E, 6B, 6C, 6D, 7B, 7C, 7D, 8A, 8B, 8D, 8E, 9A, 9B, 9D, 9E, 10A, 108, 10C, 10E 1B24 2C, 2D, 2E, 3B, 3D, 4A, 4B, 6B, 6C, 6D, 7B, 7C, 7D, 8A, 8B, 8C, 8D, 8E, 9A, 9B, 9C, 9D, 10A, 10B, 10C, 10D, 10E, llc, llD l

1B53 1B, 2A, 3B, 3C 1B54 1B*, ID, IE, 3B 1B55 1D, IE, 2C, 3A, 3B, 3C, 3D, 4A, 4B, 4C, 4D, 5A, 5B, SC, SD, 6A, 6B, 6C, 6D, 7B, 7C, 7D, 8A, 8B, 8C, 10A, 10B, 10C, 10D 1B56 1D, 1E, 2A, 2B, 2C, 2D, 3A, 3B, 3C, 3D, 4A, 4B, 4C, 4D, SB, SC, SD, 6A, 6C, 6D, 7A, 7B, 7C, 7D, 8A, 8B, 8D, 8E, 9A, 9B, llB, llc 1B43 1D, 3C, 3D 1B44 1C, ID lE, 2A, 2B, 3A, 3B, 3C i

1B63 2C*

IB64 2C*

l, 1B89 lE, 2C, 2D, 2E 1B90 lE, 2C, 2D, 2E f

2B23 2C, 2D, 2E, 3B, 3D, 4B, 4D, 4E, 4A, 6B, 6C, 6D, 7B*,

7C, 7D, 8A, 8B, 8C, 8D, 8E, 9A, 9B, 9D, 9E, 10A, 10B, 10C*

2B24 2C, 2D, 2E, 3B, 3D, 4A, 4B, 4E*, 6B, 6C, 6D, 7B*, 7C, 7D*, 8A, 8B, 8C, 8D, 8E, 9A, 9B, 9C, 9D, 10A, 10B, 10C*, 10D, 10E, llB*, llc, 11D 1B53 1B*, 1D, IE, 2C 2B54 IB*, IC, 2A, 2C, 2D, 3B, 3C 2B55 1D, 1E, 2B*, 2C, 2D, 3A, 3B, 3C, 3D, 4A, 4B*, 4C, 4D*,

5A, 5B, SC, 5D, 6A, 6C*, 6D*, 7B, 7C, 8A, 8B, 8D*, 9D, 10B, 10E

Bechtel Associates Professional Corporation l02308 ice.chment 1 102204 Page 2 of 2 MCC CUBICLE LOCATION 2B56 ID, IE, 2A, 2B*, 2C, 2D*, 3A, 3B, 3C*, 3D, 4A, 4B*,

4C, 4D, 5B, 5C*, SD, 6A, 6C*, 6D*, 7A*, 7B, 7C, 7D, 8A, 8D, 8E, 9A, 9C, 100, 10D, 10E, llD, 2B43 1C, ID,1E, 2A, 2B, 3B, 3C 2B44 1C, 1D, IE, 2A, 2B, 3A, 3B, 3C OB45 1D*, 2B, 2C, 3A, 3B, 3E, 4A, 4B, 4C*, 4D, 5B, SC, 5D, 6A, 6B, 6C, 7C OB46 1D*, 2B, 2C, 3A, 3B, 3E, 4A, 4B, 4C*, 4D, 5B, SC, SD, 6A, 6B 2B63 2C*

2B64 2C*

OB65 1D*

OB66 1D*

OB68 1B*, ID*, lE*, 2B*, 2C*

OB69 1B*, ID*, lE*, 2B*, 2C*

2B89 lE, 2C, 2D, 2E 2B90 lE, 2C, 2D, 2E Note:

This listing is based on Drawings 7220-E-17(Q), Rev 18 and 7220-E-18 (Q) Rev 17 LOCAL CONTROL STATIONS INM03856 2NM03956 INM03893Al INM03893A2 INM03893B1 INM03893B2 INM03868A INM03868B 2NM03968A 2NM03968B 2NM03993Al 2NM03993A2 2NM03993B1 2NM03993B2

  • Indicates this equipment is turned over to Consumers Power Company JGK/SB/se(E) 1/10/5-4

Bechtel Associates Professional Corporation 1O2204 l02308 Page 1 of 2 LOCATION OF ALL CLASS lE STARTERS SIZE 2 AND LARGER SUPPLIED BY COULD MOTOR C)NTROL CENTERS:

MCC CUBICLE LOCATION Size 2 Starter (100VA) 2 IB23 2B, 3C, 6A, 7A 1B24 2B, 3C, 6A, 7A i

1B55 2A, 9E, 10E IB56 5A, 10D, llD 1B63 1C, 2B 1B64 lc, 2B Size 3 Starters (150VA)

IB53 2B, 3A, 1B54 2D, 3D, 2B53 2A, 3A 2B54 2E, 3D OB45 7D 1

Bechtel Associates Professional Corporation 102204 102308 Page 2 of 2 Size 4 Starters (250VA) 1B23 1C, 5B 1B24 1C, 5B 4

1B53 2D, 3D 1B54 2A, 3C 1B56 9D 1B43 2D 1B44 2D 2B23 1C, 5B 2B24 1C, 5B 2B53 2D 2B54 3A 2B56 9D 2B43 2D OB45 6D 2B44 2D OB46 6D Note:

1. This listing is based on Drawings 7220-E17(Q), Rev 18 and 7220-E18(Q), Rev 17
2. There are no Class 1E local control stations with Size 2 of larger starters JGK/SB/se(E) 1/10/5-4 e

Bechtel Associates Professional Corporation

-l02204 102308 Attach. ot 3 Page 1 of 2 LOCATION OF STARTERS WITH INCORRECTLY SIZED TRANSFORMERS MCC CUBICLE LOCATION OB45 6B, 6C OB46 6B IBS5 7D, 10E IB56 4C, 11B 2B23 9B 2B55 10E 2B56 11D 1B43 1D, 3C IB44 1D, 3C 2B43 ID OB65 1D OB68 1D, lE OB69 lt, IE In addition to those listed above there are 45 spare starters with incorrectly sized transformers located in the warehouse.

JCK/SB/se(E) 1/10/5-4 l

l I

l I

l l

l L