Washington Public Power Supply System P.O. Box 968 3000GeorgeWashingtonWay Richland, Washington 99352 (509)372-5000 February 3,1983 G02-83-93 Elinor G. Adensam, Chief Licensing Branch #4 Division of Licensirig U. S. Nuclear Regulatory Commission Washington D.C.
20555
Dear Ms. Adensam:
Reference:
Letter, E. G. Adensam to R. L. Ferguson, dated December 29, 1982 In reference to the above letter, the Supply System appreciates the request However, due to for our cooperation in the Control Room Crew Task Analysis.
the efforts of General Physics Corporation, we have already had that oppor-tuaity.
3-7, 1983, employees of General Physics and their During the week of January subcontractor, Biotechnology, Inc., performed the data collection phase and Several Supply preliminary analyses of four scenarios on the WNP-1 simulator.
System employees also participated. During one of the data collection processes, consisting of the videotaping of the control room crew responding to a simu-lated incident, Jim Jenkins, Research Project Manager, USNRC, observed for several hours.
The entire process in which our employees participated or observed was very beneficial and will doubtless have future applications in the areas of procedure verification and training needs analysis.
We would be pleased to be considered for future cooperation in research into improvements in nuclear power plant operations.
Very truly yours, Me G. D. BOUCHEY,I nager Nuclear Safety & Licensing JPI:lg
'n 9
\\
\\
8302080211 830203 PDR ADOCK 05000460R P D___