TOLEDO

%mm EDISON ACHARO P. C AOUSE Docket No. 50-346 vc. emomnt Nucles License No. NPF-3

"' 5 2"28' Serial No. 907 January 31, 1983 Director of Nuclear Reactor Regulation Attention:

Mr. John F. Stolz Operating Reactor Branch No. 4 Division of Operating Reactors United States Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Stolz:

On December 23, 1982 (Serial No. 887), Toledo Edison submitted the Radiological Effluent Technical Specifications for the Davis-Besse Nuclear Power Station Unit No. 1.

In the letter we committed to provide a response for the date of installation of the turbine building sump effluent line monitor. At the present time, the installation should be completed by December 31, 1983.

Should there be any revision to the schedule, we will inform you of the revised date.

Very truly yours, ffk=== '

RPC: GAB:lah cc:

DB-1 SRC Resident Inspector i

THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO, OHIO 43652 I