La F
Log # TXX-91112 File # 10010.2 Ref.
- 10CFR50.36 TUELECTRIC March 15, 1991 William J. Cahill, Jr.
Enocuttve Vke Presulent Docum M Ce&r,\\ D n W.
- 1! r Cc age-4r-Beno4h-Ais%t4r SH+ee-of-Re5 0u r;; %4eenerit-V. S. Nuclear Regulatory Commission Washington, DC 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET N0. 50 445 HONTHLY OPERATING REPORT FOR FEDRUARY 1991
Dear Hr. Benoit:
Attached is the Monthly Operating Report for February 1991 prepared and Jubmitted pursuant to Specification 6.9.1.5 of Appendix A (Technical Specifications) to the Comanche Peak Unit 1 Steam Electric Station Operating License, NPF-87.
Sincerely.
William J. Cahill, Jr.
By:
D. R. Woodlan Docket Licensing Manager JLR/grp Attachment c - Mr. R. D. Hartin, Region IV Resident Inspectors, CPSES (3)
Mr. J. W. Cli f ford, NRR 9104010405 910228 PDR ADOCK 05000445 R
PDR l
400 North Olive Street LB,81 -Dallas, Texas 75201 i
Attachment to TXX 91112 Page 1 of 4
~
COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 NRC MONTHLY OPERATING REPORT DOCKETNO:
50 445 UNIT:
CPSES1 DATE:
March 12.1991 COMPLETED BY:
D. E. Buschbaum TELEPHONE:
817 897 5851 OPERATING STATUS 1.
Pacorting Period: FEBRUARY 1991 Gross hours in reporting period: 622 2,
Currently authorized power level (MWt): 1411. Max. depend. capacity (MWe Net): 115D.* Design Electrical Rating (MWe Net): 115.0 3.
Power level to which restricted (if any) (MWe Net): None 4.
Reasons for restriction (if any):
THIS MONTH YRTO DATE CUMULATIVE C.
Number of hours reactor was critical 652.4 1362.9 4289.3 6.
Reactor reserve shutdown hours 19.6 53.1 326 7.
HvJrs generator on line 648-1350.5 4216.2 8.
Unit reserve shutdown hours 0
0 0
9.
Gross thermal energy generated (MWH) 2,05.4,786 4,314,232 12,47.1.160
- 10. Gross electrical energy generated (MWH) 685,222-1,447,540 L 4,112,540
- 11. Net electrical energy generated (MWH) 660,356 1,388,607
.3,902,121
- 12. Reactor Service factor 97.1 96.3 89.5
- 13. Reactor availability factor 100' 100 96.3
- 14. Unit service factor-96.4 95.4 88.0-I
- 15. Unit availability factor 96.4
. 95.4 -
88.0
- 16. Unit capacity factor (Using MDC) 85.4.
85.3 70.8
- 17. Unit capacity factor (Using-Design MWe) 85A -
85.3 17 0.8.
- 18. Unit forced outage rate 3.6 _
4.6 6.8
- 19. Shutdowns scheduled over next 6 months (Type, Date, and Duration of each): a) Maintenance /
Surveillance, 910413, 6 weeks.
- 20. If shutdown at end of report period, estimated date of startup:
21 Unite in test status (prior to commercial operation):
FORECAST ACHIEVED Initlai Criticality 900403-900403 f
Inlllal Electricity 900501 900424 Commercial Operation 900721 900813 l
Estimated
.. ~.
Attachment to TXX 91112 Page2ol4 AVERAGE DAILY UNIT POWER LEVEL DOCKETNO:
S0-445 UNIT:-
CPSES 1 DATE:
March 12.1991 COMPLETED BY:
D. E. Buschbaum TELEPHONE:
817-897 5851 MONTH: FEBRUARY 1991
[AY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
. (MWe Net) 1 1048 17 1047 2
1050 18 1047 3
1042 19 1046-4 1043 20 1046 5
1043 21 1045-i 6
1043 22 1049 7
1044 23 1010 I
8 950 24 1051 9
853
-25 1045 10 167 26 1036 l
11 292 27 1042
-12 1018 28 1045 13 1044
-29 i
-14 1045 30 15 1041 31 16 1042 n
~
Attachment to TXX 91112
'Page 3 of 4 i
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKETNO:
50-445 UNIT:
CPSES 1 DATE:
March 12.1991 COMPLETED BY:
D. E. Buschbaum TELEPHONE:
817 897 5851 MONTH: FEBRUARY 1991 2/1 0000 Unit started month in MODE 1.
2/10 0531 Reactor Trip, Unit entered MODE 3.
Reactor tripped on Undervoltage Trip of #3 Reactor Coolant Pump. Trip caused by operator error when switchboard cabinet was opened disconnecting UV relays. LER 91004 to follow.
2/11 0105 Unit entered MODE 2.
0250 Unit entered MODE 1.
2/15 1647 Experienced inadvertent actuation of an. auxiliary feedwater slave relay during response time testing which actuated the turbine driven auxiliary
-feedwater pump and other equipment. LER 91_005 to follow.
2/28 1345
' Inadvertent actuation of the ECCS containment sump suction valve 18811 A-during surveillance testing allowing approximately 15,000 gallons of RWST water to drain to the containment sump before being secured.
LER 91006 to follow.-
2/28 2400 Unit ended month in MODE 1'.
l lo V
y w
wr e
-ng--
w-g y
.,&di.
s Attachment to'TXX-91112 Page 4 of 4 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETNO:
50-445 UNIT:
CPSES 1 DATE:
March 12.1991 COMPLETED BY:
D. E. Buschbaum TELEPHOtE 817-897-5851 I
REPORT MONTH FEBURARY 1991 IETHODOF TYPE SHU1 TING DOWN Ff0RCED DURATION TEREACTOROR M
DATE S:SCHEDLg Fn (HOURS)
IEBSCH REDUCNGPOWER CORRL-cuVEACTIONSCOlWENTS 002 910210 F
24 G
3 Reactor Trip on UV #3 RCP. See previous page. LER 91004 to follow.
t 1
1 ).
REASON.
2 ) hETHOD A-EQUIPMENT FAILURE (EXPLAIN)
E OPERATORTRANNG AND UCENSEEXAMINATION
.1: MANUAL B: MAINTORTEST F: ADMINISTRATIVE 2: MANUALSCRAM C REFUEUNG G OPERATIONALERRCR(EPLAIN) 3: AUTOMATICSCRAM D: ' REGt1ATORYRESTRICTION H: OTHER (EXPLAIN) 4: OTHER(EXPLAIN) 1
_