o-
. OPERATING DATA REPORT.
DOCKET NO.
50-244 DATE Decembe r 6.1982 COMPLETED BY
- f. N-
^ ^ ^ '
Andrew E. McNAMAiiA TELEP110NE 1 (315) 524-4446 OPERATING STAT,U,5 Ext. 301
- 1. Unit Name:
GINNA STATION. UNIT #1 Notes The reuctor power leve1
- 2. Reporting Period: Nove mbe r,1982 was maintained at 100%
1520 for the majority of the
- 3. Licensed Thermal Power (MWr):
490 report month, with one
- 4. Nameplate Rating (Gross MTe):
- 5. Design Electrical Rating (Net MWe): 470 except ?on detailed on 490 page #3.
- 6. Maximum Dependable Capacity (Gross MTe):
470
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level to Which Restricted, If Any (Net MWe):
- 10. Reasons For Restrictions, If Any:
This Month Yr. to-Date Cumulative
- 11. Ilours In Reporting Period 720.00 8.016.00 11tu n n _ nn
- 12. Number of flours Reactor Tas Critical
_ 4,499.53 86,i42.15 720.00 0.00 0.00 1.631.32*
- 13. Reactor Reserve Shutdown llours I4. Ifours Generator On-Line
_ 4,408.50 84,236.13 720.00 0.00 0.00 8.50
- 15. Unit Reserve Shutdown flours
- 16. Gross Thermal Energy Generated (MWil) 1,082,784 6,555,552 115,461,106 358,207 2,161,422 37,596,387
- 17. Gross Electrical Energy Generated (MWH).
340,952 2,055,464 35,633,537
- 18. Net Electrical Energy Generated (MWil) 100.00%
55.00%
- 19. Unit Service Factor
_ 73.84%
100.00%
55.00%
73.85%
- 20. Unit Availability Factor 100.75%
54.56%
68.38%**
- 21. Unit Capacity Factor (Using MDC I!ct) 100.75%-
"M%
68.38%**
- 22. Unit Capacity Factor (Using DER Net) 0.00%
13.'41%
8.65%
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
Mid-Ma ch - 1983 - Refuelino & Maintenance
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
.o-Cummulative Total Commencing January-1,1975 s
to Th2 Cummulative capacity factor in, the October,1982 report was incorrectly 4...
i se r v.
i/ven given as 75.90%. The correct number should have been 68.17%.
8301270303 821206 PDR ADOCK 05000244 W
PDR m
2-AVERAGE DAILY UNIT POWER LEVEL DOCKET NO, 50 244
- 1. Ginna Station UNIT December 6,1982 DATE && pfttn. ~.
COMPLETED BY
^ ~ ~
Andrew E. McNamara' 1 (315) 524-4446 TELEPHONE Ext. 301 MONTil Novembe r, 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 477 478 17 2
477 478 13 477 477 3
gg 4 76 478 4
20 476 371 5
21 g
477 477 g
477 477 7
23 477 477 3
'478 g
25 477 4 76 477 le 476 478 gg 27 47I 476 12 478 476 13 29 477 g
14 8
i 15 L78 gg INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
...n n a v../..
' D(X'KET NO.
3 0-244
. UNITNAME _ W1,Ginas Station UNIT SHUTDOWN AND POWER REDUCTIONS :
DATE December 6,1982 COMPLETED itY 45-3.f O--_._
liRfrew c amara
~~
REPORT MONTII Novembe r 1 (315) 524-4446 Ext. 301 m
~mE n
c Licensee e,.
Cause & Corrective o e u oO c.
No.
Date'
-1 jj
},} j Event
{4
[j g
Action to.
Repor' #
y u
Prevent Recurrence gz y
.e 2
g u
O PR*
11-21-82 5.
W 9 Hrs B
N/A N/A HA (Turbine) i. ad reduction to ~46% reactor power level to-perform a series of monthly 4
turbine valve and trip tests. At the same. time.a containment entry was made to perform some necessary maintenance inside the secondary shield.
- Power Reduction 1
2 3
4 F: Forced Reason:
Method:
Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data Il-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction ~
4-Other (Explain) 0161)
E-Operator Training & License Examination F-Administrative 5
1 G-Operational Error (Explain) 4..
m av. ins, II-Other (Explain)
Exhibit I - Srme Source i
~
4_
l i
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50-244 UNIT Ginna Station, Unit #1 DATE December 6,1982 r_f 8./ M m _
COMPLETED BY Andrew E. McNamara' ~ ~
TELEPHONE 1 (315) 524-4446 MONTil November, 1982 The reactor power level was maintained at 100% for the majority of the report period, with the following exception: On 11/21 the reactor power. level was reduced to ~46% to perform a series of monthly turbine valve and trip test.
A containment entry was made at the same time to perform some necessary maintenance inside the secondary shield. The reactor power level was restored
~
to 100% after,the tests and remained there for the ' rest of the report period.
2 49 123 (1/78)
(_;
=-
. 3, 7,
- (
' h
'y-p
~
4
,,4' 5'
-GIMMA STATION.
~ Maintenance Report t
November, 1982 y
' During Novembers : routine' maintenance - and..' inspections were completed as' scheduled.
J 4
D D
8 g
Y' 2-f i
e-r.-
[.
r M.,
rI.
I
~
i i
ll
-i,'-
I~
[
r
\\,
1 t-
,,