ML20070R149

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1982
ML20070R149
Person / Time
Site: Ginna Constellation icon.png
Issue date: 12/06/1982
From: Mcnamara A
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML20070R137 List:
References
NUDOCS 8301270303
Download: ML20070R149 (5)


Text

o-OPERATING DATA REPORT.

DOCKET NO. 50-244 DATE Decembe r 6.1982 COMPLETED BY f. N- -

^ ^ ^ '

Andrew E. McNAMAiiA TELEP110NE 1 (315) 524-4446 OPERATING STAT,U,5 Ext. 301

1. Unit Name: GINNA STATION. UNIT #1 Notes The reuctor power leve1
2. Reporting Period: Nove mbe r,1982 was maintained at 100%
3. Licensed Thermal Power (MWr): 1520 for the majority of the
4. Nameplate Rating (Gross MTe): 490 report month, with one
5. Design Electrical Rating (Net MWe): 470 except ?on detailed on 490 page #3.
6. Maximum Dependable Capacity (Gross MTe):
7. Maximum Dependable Capacity (Net MWe): 470
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level to Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Yr. to-Date Cumulative

11. Ilours In Reporting Period 720.00 8.016.00 11tu n n _ nn
12. Number of flours Reactor Tas Critical 720.00 _ 4,499.53 86,i42.15
13. Reactor Reserve Shutdown llours 0.00 0.00 1.631.32*

720.00 _ 4,408.50 84,236.13 I4. Ifours Generator On-Line 0.00 0.00 8.50

15. Unit Reserve Shutdown flours 1,082,784 6,555,552 115,461,106
16. Gross Thermal Energy Generated (MWil) 358,207 2,161,422 37,596,387
17. Gross Electrical Energy Generated (MWH).

340,952 2,055,464 35,633,537

18. Net Electrical Energy Generated (MWil) 100.00% 55.00% _ 73.84%
19. Unit Service Factor
20. Unit Availability Factor 100.00% 55.00% 73.85% _
21. Unit Capacity Factor (Using MDC I!ct) 100.75% 54.56% 68.38%**
22. Unit Capacity Factor (Using DER Net) 100.75%- "M% 68.38%**

- 23. Unit Forced Outage Rate 0.00% _

13.'41% 8.65%

24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Mid-Ma ch - 1983 - Refuelino & Maintenance

25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION s

.o- Cummulative Total Commencing January-1,1975 to Th2 Cummulative capacity factor in, the October,1982 report was incorrectly 4... i se r v. i/ven given as 75.90%. The correct number should have been 68.17%.

8301270303 821206 PDR ADOCK 05000244 m W PDR __

- -. 2-AVERAGE DAILY UNIT POWER LEVEL DOCKET NO, 50 244 UNIT #1. Ginna Station DATE December 6,1982

&& pfttn . ~ .- -

COMPLETED BY

^ ~ ~

Andrew E. McNamara' TELEPHONE 1 (315) 524-4446 Ext. 301 MONTil Novembe r, 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 477 478 17 2

477 13 478 477 477 3 gg 4 76 478 4 20 '

476 371 5 21 477 477 g g 477 477 7 23 477 477 3

g

'478 477 25 4 76 477 le gg 476 478 27 12 47I 476 478 476 13 29 477 g 14 "

8 i 15 gg L78 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

. ..n n a v. ./ .. .

' D(X'KET NO.

3 0-244 "

. UNITNAME _ W1,Ginas Station ,

UNIT SHUTDOWN AND POWER REDUCTIONS : DATE December 6,1982 COMPLETED itY 45-3 .f O--_._

liRfrew

~~

. c amara .

REPORT MONTII Novembe r .

1 (315) 524-4446 Ext. 301 m

, n ~mE o e u Licensee c

    • Cause & Corrective oO c. e ,.

No.

Date' -1 jj *

} ,} j Event {4 g

[j Action to .

>- gz y 2

.e Repor' # y u u Prevent Recurrence g

O PR* 11-21-82 5. W 9 Hrs B N/A N/A HA (Turbine) i. ad reduction to ~46% reactor power level to-perform a series of monthly 4 '

turbine valve and trip tests. At the

, same. time.a containment entry was made to perform some necessary maintenance inside the secondary shield.

1 2

  • Power Reduction 3 4 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data Il-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction ~ 4-Other (Explain) 0161)

E-Operator Training & License Examination F-Administrative G-Operational Error (Explain) 5 1 4.. m av. ins, II-Other (Explain) Exhibit I - Srme Source

  • i

~

  • _ 4_

l i

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-244 UNIT Ginna Station, Unit #1 DATE December 6,1982 COMPLETED BY  : r_f 8./ M m _

Andrew E. McNamara' ~ ~

TELEPHONE 1 (315) 524-4446 MONTil November, 1982 The reactor power level was maintained at 100% for the majority of the report period, with the following exception: On 11/21 the reactor power . level was reduced to ~46% to perform a series of monthly turbine valve and trip test.

A containment entry was made at the same time to perform some necessary maintenance inside the secondary shield. The reactor power level was restored

~

to 100% after,the tests and remained there for the ' rest of the report period.

2 49 123 (1/78)

=- -

(_; ,

.- -( -

. 3 , 7,

'h

'y- p ,

- ~

4 ,,4' .

. - 5' ,

-GIMMA STATION.

~ Maintenance Report t

November, 1982 y

' During Novembers : routine' maintenance - and..' inspections were completed as' scheduled.

J 4

D D

' . 8 g

% Y' 2- .

f i

e-r .-

r

[.

M.,

r I.

~

I i ,

i ll -i,'-

I~

[

r

\,

1 -

t-

, ,