ML20070R003

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1982
ML20070R003
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 12/06/1982
From: Kelly W
PACIFIC GAS & ELECTRIC CO.
To:
Shared Package
ML20070Q990 List:
References
NUDOCS 8301270229
Download: ML20070R003 (4)


Text

W..

MONTHLY NARRATIVE REPORT OF OPERATION AND MAJOR MAINTENANCE EXPERIENCE This report describes the operating and major maintenance experience for the month,of November,1982. This narrative report.was prepared by the plant staff snd is submitted in accordance with Section 6.9.1.10 of the plant Technical Specifications.

There is no significant operating experience or major safety related maintenance to report..

No challenges to the PORV's e safety valves have been made.

Furthermore, no changes have been made in the Offsite Dose Calculation-Procedure, the Environmental Radiological Monitoring Procedure, or any radioactive waste treatment systems.

I l5

!t 8301270229 921206 PDR ADOCK 05000275 R

PDR

~

OPERATING DATA REPORT DOCKET NO 50-275 DATE 3 2/6/82 W.J. Kelly COMPLETED BY (805)595-735 TELEPHONE OPER ATING STATUS Diablo Canyon Unit 1 Notes

1. Unit Name:

November 1982

2. Reporting Period:

166.9

3. Licensed Thermal Power (MWt):

1170

4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):

1084

6. Maximum Dependable Ca'pacity (Gross MWe):

1134 1084

. 7. Maximum Dependable Capacity (Net MWe):

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

~NONE 9. Power Lesel To which Restricted,if Any (Net MWe):

Suspended Low Power Test License

10. Reasons For Restrictions,1f Any:

This Month Yr to-Date Cumulative 0

0 0

11. Hours in Reporting Period 0

0 0

12. Number Of Hours Reactor Was Critical 0

0 0

13. Reactor Reserve Shutdown Hours
14. Hours Generator On Line 0

0 0

0 0

0

15. Unit Resene Shutdo.wn Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 0' 0

0

[

17. Gross Electrical Energy Generated (MWH) -

0 o

l

18. Net Electrical Energy Generated (MWH) 0
19. Unit Senice Factor N/A N/A
20. Unit Asailability Factor

' 21. Unit Capacity Factor (Using MDC Net)

N/A

22. Unit Capacity Factor (Using DER Net)

N/A N/A

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Oser Next 6 Months (Tue.Date.and Duration of Eschl:

NONE e

March, 1983 (fuel load)

25. If Shut Down At End df Report Period, Estimated Date of Startup:
26. Units In Test S.atus (Prior to Commercial Operation):

Forecast Achieved MAY l983 INITIAL CRITICALITY INITIAL ELECTRICITY MAY 1983 COMMERCIAL OPER ATION AUGUST 1983 (9/77)

- ~ -

UNIT SHUTDOWNS AND POWER REDUCTIONS

' DOCKETNO.

50-275 UNITNAME Diablo Canyon Unit 1 DATE 12/6/82 REPORT MONTH November 1932 COMPLETED BY W.J. Keily TELEPitONE (805)595-7351 E

e

!E 3

)Y3 Lkensee E,

  • n, Cause & Corrective No.

Date h

5g

(

y5 Event p

Action to H

$E 5

jgg Report se u, o u

g Prevent Recurrence 6

810928 F

0 H

4 81-002/0lT IZ ZZZZZZ Halted fuel loading gireparations upon discovery of seismic calculation errors.

Reanalysis and reviews are being conducted in accordance with Conmiission's instructions 4

I l

l 1. Forced Reason:

Method:

Exhibit G. Instructions 2

3 4

F:

S: Scheduled A Equipment Failure (Explain) 1-Manual for Prepasallon of Data B Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C Refueling 3 Automatic Scram.

Event ReporI(LER) File (NilREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E Operator Training & Ucense Examinathm F-Adndnistrative 5

~

G Operational Earns tExplain)

Exhit it I. Same Source 19/17) 11 ()ther (1%:ilain r G

)

  • ',, 69-10S10 (25).

9/77 AVERAGE DAILY UNIT POWER LEVEL i

7 50-275 DOCKET NO.

Diablo Canyon Unit 1 1; NIT 12/6/82 DATE COMPLETED BY W.J. XELLY -

TELEPHONE (805)S95-7351 MONTH

November, 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe NetI t MWe-Net i O

i i7 0

0 2

0 is 0

0 i,

3 0

0 4

,o 0

5 21 0

0 6

. (.

0 7

,0

,3 0

0 g

24 0

9 0

u 0

0 26 10 0

0 11 27 0

0 12 33 0

0 13 3,

0 0

14 30

-15 31

(

l 16 0

l l

t INSTRUCTIONS On this format. list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nestest whole megawatt.

e got77) l l

, _ _ _ _ _