Application for Amends to Licenses DPR-77 & DPR-79, Consisting of TS Change 94-03,relocating TS Tables 3.3-2 & 3.3-5 for Reactor Trip Sys & ESFAS Response Time Limits, Respectively to Ufsar,Per GL 93-08
ML20070Q992
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 05/16/1994
From: Powers K
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20070Q995 List:
References
GL-93-08, GL-93-8, NUDOCS 9405190339
Download: ML20070Q992 (2)


Text

. _ _ . _ _ _ _ _ - _ .

.i4 g 4 . ,

En Tennessee Vauey Authority Post Offce Box 2000 Soddy-Daisy. Tennessee 37379 2000 Ken Powers Vce President, SW1uoyah Nucioar Hant May 16, 1994 TVA-SQN-TS-94-03 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of ) Docket Nos. 50-327 Tennessee Valley Authority ) 50-328 SEQUOYAH NUCLEAR PLANT (SQN) - TECHNICAL SPECIFICATION (TS) CHANGE 94-03,

" RELOCATION OF RESPONSE TIME LIMIT TABLES TO THE UPDATED FINAL SAFETY ANALYSIS REPORT (UFSAR) IN ACCORDANCE WITH GENERIC LETTER (GL) 93-08" In accordance with 10 CFR 50.90, we are enclosing a requested amendment to Licenses DPR-77 and DPR-79 to change the TSs of SQN Units 1 and 2.

The proposed change will relocate TS Tables 3.3-2 and 3.3-5 for reactor trip system and engineered safety feature actuation system response time limits, respectively, to the UFSAR. This change is in accordance with the guidance provided by NRC in GL 93-08, dated December 29, 1993.

The proposed TS change is identified in Enclosure 1.. The justification for the proposed TS change is provided in Enclosure 2. A proposed determination of no significant hazards consideration performed pursuant to 10 CFR 50.92 is provided in Enclosure 3. The commitment contained in this submittal is summarized in Enclosure 4.

TVA requests a 45-day implementation period for this TS change following issuance.

9405190339 940516 PDR sADOCK 05000327 l

__ .P PDR .

hs

s 5 ' '

U.S. Nuclear Regulatory Comission Page 2 May 16, 1994 Please direct questions concerning this issue to K. C. Weller at (615) 843-7527.

Sincerely i

Ken Powers Sworn to and subscribed-before me this //a,til day of /~7FE -- 1994

- O Notary Public My Comission Expires - '17 Enclosures cc (Enclosures):

Mr. D. E. LaBarge, Project Manager  ;

U.S. Nuclear Regulatory Comission 1

, One White Flint, North j 11555 Rockville Pike l Rockville, Maryland 20852-2739 l l

Mr. Michael H. Mobley, Director (w/o Enclosures) l Division of Radiological Health 3rd Floor L & C Annex i 401 Church Street l Nashville, Tennessee 37243-1532 )

NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Comission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711