ML20070Q936
| ML20070Q936 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 01/14/1983 |
| From: | Edelman M CLEVELAND ELECTRIC ILLUMINATING CO. |
| To: | Youngblood B Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20070Q941 | List: |
| References | |
| REF-GTECI-A-36, REF-GTECI-SF, RTR-NUREG-0612, RTR-NUREG-612, TASK-A-36, TASK-OR PY-CEI-NRC-0002, PY-CEI-NRC-2, NUDOCS 8301270210 | |
| Download: ML20070Q936 (1) | |
Text
i t TH E C LEV E L A N D E L E CO M P A N Y P.o. BOX 5000 - CLEVELAND oHlo 44101 - TELEPHONE (216) 622-9800 - ILLUMINATING BLDG.
- 55 PUBLICSQUARE Serving The Best Locat,an in the Nation MURRAY R. EDELMAN VICE P9ESIDENT NUCt'4R January 14,1983 PY-CEI/NRC-0002 L Mr. B. J. Youngblood, Chief Licensing Branch No.1 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Perry.,
2ar Power Plant Dockei Nos. 50-44'; 50-441 Control of Heavy Loads Study
Dear Mr. Youngblood:
Enclosed are seven (7) copies of Revision 2 to the Perry Nuclear Power Plant Control of Heavy Loads Study (gal Report No. 2329). This revision is to completely replace the previous revision.
If you have any questions, clease let me know.
Very truly yours, Murray R. Edelman Vice President Nuclear Group MRE:kh cc:
Jay Silberg, Esq.
John Stefano Max Gildner Nick Fioravante Fred Clemenson L
O 8301270210 930114 PDRADOCKOSJ00g
-