p OPERATING DATA REPORT DOCKET-NO. 50-336 DATE 12/15/82 COMPLETED BY J.>GIBSON TELEPHONE (203) 447-1792 Ext. 4431 OPERATING STATUS-
'1.
Unit Name: MILLSTONE 2 Notes:
Items 21 and 22 2.
Reporting Period: NOVEMBER 1982
. cumulative are weighted ave.
3.'
Licensed Thermal Power (MWL): t700 unit operated at 2560 mw 4.
Nameplate Rating (Gross MWe): '909 thermal prior to its up rating 5.
Design Electrical Rating (Net MWe): 870 to its current 2700 mw thermal 6.
- Maximum Dependable Capacity (Gross MWe)
- 895 power level.
'7.
Maximum Dependable Capacity (Net MWe): 864 8;
. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
N/A 9.
Power Level To Which Restricted, If Any (Net MWe): N/A
- 10.
Reasons For Restrictions,.If Any: N/.*
This Month Yr.-to-Date Cumulative 11.
Hours In Reporting Period 720 8016*
60768*
12.
Number Of Hours Reactor Was Critical 701.7 5903.5 44490.8 13.
Reactor Reserve Shutdown Hours 0
128.6 2205.5 14.
Haure Generator On-Line 652.9 5460.6 42462.1 15.
Unit Reserve Shutdown Hours 0
0 468.2 1G.
Gross Thermal Energy Generated (MWH) 1644259 14084412 106495652 17.
Gross Elec. Energy-Generated (MWH) 535260 4598840 34600338 18.
Net Electrical Energy Generated (MWH) 513123 4400500 33154261 19.
Unit Service Factor 90.1 68.1 69.9 20.
Unit Availability Factor 90.1 68.1 70.1 21.
Unit Capacity Factor (Using MDC Net) 82.5 63.5 65.5 22.
Unit Capacity Factor (Using DER Net) 81.9 63.1 64.6 23.
Unit Forced Outage Rate 9.3 12.7-19.7 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Pefueling Outage, April 16 1983, 14 Weeks.
25.
If Shut.Down At End Of Report Period, Estimated Date of Startup:
26.
Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A Corrects Minor Math Error On October 1982 Report.
8301270031 821215 DR ADOCK 05000336 PDR
I,,.
' AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-336
~ UNIT MILLSTONE 2 DATE 12/15/82 COMPLETED BY J. GIBSON TELEPHONE (203) 447-1791' Ext. 4431 MONTH NOVEMBER-
' DAY
. AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
-(MWe-Net)
'l 116 17 854 2
619 18-854 3
851 19 854 4
853 20 638
'S 593 21 0 (-28) 6 17 22 296 7
505 23 763 8-834 24 847
'9 849 25
~848 10 854 26 849 11 854 27 848 12 852 28 847 13 854 29 848 14 852 30 849 15 852 31 16 855 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
4 m-
.,9 6
DOCKET NO. 50-336 UNIT SHUTDOWNS.AND POWER REDUCTIONS UNIT NAME MILLSTONE 2 DATE 12/15/82 COMPLETED BY'J. Gibson-REPORT MONTH NOVEMBER TELEPHONE (203) 447-1791-Ext. 4431 l
2 No.
Date Type Duration Reason Method of.
Licensee Systeg Compogent-
'Cause & Corrective (Hours)
' Shutting Event Code Code Action to 3
Down Reactor Report #
Prevent Recurrence 23 821027 F
9.8 A
3 N/A IB Instru.
Continuation'of end of October 1982 shutdown.- Resumed normal start-up' procedures on 110182.
24 821105 F
24.9 A
3 N/A IA Instru.
Tripped from 100% power on a thermal margin low pressure trip.
signal as a result of an instrument ncise spike.
Resumed normal start-up procedures on 110682.
25 821120 F
32.4 A
3 N/A CH VALVE X Tripped from 100%
power due to feed reg valve closure resulting from an instruments noise
.a spike.
Resumed normal start-up procedures on 112182.
1 w
J A.
s k
2 c
9 a
7 r
2 1
e c
v m
E N
7 1
l r
r 2
N O 4 3
a o
o 8
O S 4
4 v
f f
/
6 5
T B
4 r
e 3
S I
)
o e
k y 1
3 L
G 3 t
p cd
/
L 0
t n
e 2
0 I
. 2 x
N i
d h g 1
5 M J (E
O n
cn I
e a
i eeye T
t t
ds ot mB n C
i rs nu Naa o
A n
ee a
DNdh a
bt s
t ep E
m b
pr e
tt e C
r ul me k
iel N
u na ud c
nl e A
f sn pn o
U pT N
o i
D m
E t
ri kl o
T c
it cy C
T N
e ac ac N
I j
pn p
E A
n eu en M
M I
Rf Ri P
I U
Q E
D E
TA L
E R
YT R
E E
F B
A M
p S
E m
V u
R O
P O
N F
g H
n Y
T i
R N
T g
A O
N 7
r M
M E
4 1
a M
N 2
0 h
U T
O 0
C S
R P
I 0
O M
S 9
'C E
P O
C E
C 2
H N
R AN E
TN I
AM m
E a
V e
I t
T S
C M
E E
I n
S R
T S
i C
R S
P a
V O
Y H
M C
C S
E TA 9
2 8
D 2
0 1
0 1
1 1
1 1
2 2
2 8
8 8
,l ll l
l
.xp i 4
h w=
' Docket No. 50-336' gl' Date:
12/15/82 Completed By: J. Gibson Telephone: (203) 447-1791 Ext. 4431 REFUELIQ1NFORMATIONREQUEST
-1.
Name of facility: -Millstone 2
- 2.
Scheduled date for next. refueling shutdown:
April 16, 1983 3.
Schedule date for restart following refueling: June 22, 1983 (14 wk outage) 4.
' Will refueling or resumption of operation thereafter require a technical
, specification change or other license amendment?
It is anticipated that Cycle 6 operations will require Technical Specification changes or other License amendments.
~
5.
Scheduled date(s)'for submitting licensing action and.
1 supporting information:
Safety Analyses: January 1,- 1983
~ Steam Generator Licensing Action:
February.1, 1983-6.
Important licensing considerations ~ associated with refueling, e.g.,
-new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating' procedures:
Additional plugged steam generator tubes will
-result in potential ~ reactor coolant-flow reduction.
Currently planning
.to install sleeves in steam generator-tubes.
7.~
The number of fuel assemblies (a) in the core and (b) in the spent fuel' storage pool:
(a)' In Core:
217 (b) 288 8.
.-The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that :.as been requested or is planned, in number of fuel assemblies:
667
' 9.
..The projected date of.the last refueling that can be discharged to the spent' fuel pool assuming the present licensed capacity:
-1985, Spent Fuel Pool, full core off load capability is reached.
1987, Core Full, Spent Fuel Pool contains 648 bundles.
_ _ _ _ _