Responds to NRC Re Concerns Noted in Insp Repts 50-254/90-25 & 50-265/90-25 Re out-of-svc Times for Unit 1 Drywell Floor Drain Sump Containment Isolation Valves.Event Will Be Included in Response to Insp Rept 50-254/91-06
ML20070Q181
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 03/22/1991
From: Kovach T
COMMONWEALTH EDISON CO.
To: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 9103280231
Download: ML20070Q181 (2)


Text

-

?

/

Ccmmenwealth Ediscn 4

1400 Opus Place Downers Grove, Ilknois 60515 i

March 22, 1991 Mr. A. Bert Davis Regional Administrator, Region III i

U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Subject:

Quad Cities Nuclear Power Station Units 1 and 2 Response to Inspection Report 50-254/90025; 50-265/90025 NBC 30ch.L Nosu50-25 Land _.50-265

Reference:

(a) Letter from H.J. Miller to Cordell Reed dated February 25, 1991.

(b) Telephone Conversation between B. Burgess (NRC) and R. Rcdtke (CECO) on March 4, 1991.

Mr. Davis:

The referenced letter transmitted the subject inspection report which identified a concern regarding the preparation of an out-of-service for certain Unit i drywell floor drain sump containment isolation valves.

It was requested that an investigation-into the casual factors of the errors be conducted and a written response provided.

It was further stated that the out-of-service errors were similar to the errors that took place during the January 24, 1991 loss of vessel inventory event at Quad Cities Station (see Inspection Report 50-254/91006), and as such, the response could be included with the response to the issues described in Inspection Report 50-254/91006.

The telephone conversation W1th Bruce Surgess clarified that the response concerning the preparation of the out-of-service could be addressed with the out-of-service issues identified in Inspection Report-50-254/91006.

Commonwealth Edison has reviewed this event separately and in conjunction with the January 24, 1991 event to determine the root cause and identify effective corrective actions.

Regarding out-of-service personnel errors, these events are similar and, as such, will be addressed in the response to.the out-of-service issues described in Inspection Report 50-254/91006.

'b\\

gk g.,,,

1 9103280231 910322 e

Il PDR ADOCK 05000254

[!

Cl PDR

o je Mr. A.B. Davis-March 22, 1991 If'your. staff has any questions or comments concerning this letter, please refer them to Rita Radtle, Compliance Engineer at 708/515-7284.

Very truly yours, f..

T.J. Kovach Nuclear Licensing Manager cc:

L.N, 01shan T. Taylor Senior Resident Inspector NRR Document Control Dest RR/TK/1mw e