ML20070M891
| ML20070M891 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 04/22/1994 |
| From: | Geoffrey Edwards PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9405030403 | |
| Download: ML20070M891 (2) | |
Text
_.
W-Pasch Rettom Atamic Powtr Station
.4 j
s, s-l PECO ENERGY-
- ,9 ac ***
Delta, PA 17314-9739 l
717 456 7014 i-1 April 22,1994
- Document Control Desk -
' U. S. Nuclear Regulatory Commission Washington, DC ' 20555 Docket Nos.
50-277 & 278 Ucense Nos.
DPR-44 & 56
SUBJECT:
Peach Bottom Atomic Power Station-Units 2 and 3 Technical Specification Amendment implementation Status
Dear Sir:
As requested in your letters issuing the following Technical Specification.
i Amendments, PECO Energy Company is hereby notifying you in writing that we -
have implemented these amendments.
Amendment Numbers
-Descriotion of Amendments l
185/190 Changed SRO requirements for Station Management (dated l
3/22/94) 186/191 Extension of Operating Ucense expiration date to reflect actual operating years verses the construction years (dated 3/28/94) 187/192 Changed Emergency Diesel Generator Surveillance Requirements (dated 4/5/94) 188/193 Jib Crane, Emergency Transformer Relay Tolerances, and Turbine Valve Scram Bypass bases clarifications (dated 4/7/94) 189/194 Main Stack and Roof Vent Radiation Monitor clarifications (dated 4/7/94) j If you have any questions regarding these implementations, feel free to contact me.
Sincerely,-
f 3/
d G. D. Edwards Plant Manager GDE/GAJ:gaj g
'CCN 94-14057 94c5o3o4o3'94o422' l4 PDR-ADOCK.o5ooo277 020QQ P
- pop
0.S. Nuclear Regulatory Commission Document Control Desk Page 2 cc:
R. A. Burricelli, Public Service Electric & Gas W. P. Dornsife, Commonwealth of Pennsylvania T. T. Martin, US NRC, Administrator, Region I R. l. McLean, State of Maryland W. L. Schmidt,- US NRC, Resident inspector C. D. Schaefer,- DelMarVa Power H. C. Schwemm, VP - Atlantic Electric CCN 94-14057
.