Forwards Revised List of Licensing Items Requiring NRC Approval in 1983.Dates in Util for Item 10 Incorrect & Should Be Revised as Indicated
ML20070M431
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 01/13/1983
From: Clayton F
ALABAMA POWER CO.
To: Varga S
Office of Nuclear Reactor Regulation
References
NUDOCS 8301250201
Download: ML20070M431 (9)


Text

Malling Address Alittm2 Power Company 600 North 18th street Post Offics Box 264:

Birmingham. Alabama 35291 A

Telephone 205 783-6081 F. L Clayton, Jr.

Senior Vice President Maballla NWCf Fhntridge Building the southem electrc system January 13, 1983 Docket Nos. 50-348 50-364 Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Attention:

Mr. S. A. Varga Jcseph M. Farley Nuclear Plant - Units 1 & 2 Licensing Items Requiring NRC Approval in 1983 Gentlemen:

Attached is a revision of the list of identified licensing items for NRC review and approval in 1983.

The dates in our January 4,1983 letter for Item 10 were incorrect and should be revised as indicated in the attached listing.

Receipt of NRC action by this corrected schedule is needed in order to avoid potentially adverse af fects on plant operation.

If there are any questions, please contact us.

Yours very truly, F. L. Clayton J r.

F LCJ r/ RLG :1 s h-D34 Attachment cc:

Mr. R. A. Thomas Mr. G. F. Trowbridge Mr. G. P. O'Reilly Mr. E. A. Reeves Mr. W. H. Bradford

' r301250201 830113 DR ADOCK 05000 g

l ATTA09ENT LIC8tSIE IT9tS IEINIRIE NC # PION. DI 123 Actial*/ Prnpnemi Rupested M C Itan AFCo Sahuittal Date Aprwal Date r%

1. Movable Control Rod Asserblies for FW 1 and 2 02-22-83 09-01-83 Removes the six hour requirenent to obtain Hot Standby for (T.S.3/4.1.3) non-trip conditions.
2. Charcoal Filters for FW 1 and 2 (T.S. 4.7.7, (B-01-83 09-01-83 Clarifies the testing procedums used for charroal filters by 4.7.8 and 4.9.14) specifying efficiencies to be used een testing and corrects adninistrative errors.
3. River Water Systen for FW 1 and 2 (T.S. 3/4.7.5) 12-30-92*

07-01-83 Deletes the river eter systen fran the technical specifica-tians. Same letter as Itsn 4.

4. Diesel Geneator Overload Test for FW 1 and 2 (B-03-82*

07-01-83 Reduces the surveillance load test requirments to prevent (T.S.4.8.1.1.2.c.5)

(original subnittal) potential diesel danage fran current testing requirunmts.

12-30-82* (stb-Same letter as Iten 3.

sequent subnittal)

5. BIT Reduction for FW 1 and 2 (T.S. 3/4.3.4)

.12-30-82*

03-31-83 Reduces bormn concentration in the borun irdection tank to zero ppn. Required due date to pmvent tnnecessary batching of the tank sich could delay scheduled restart of the unit.

6. Turtine Valve Surveillance for FW 2 (T.S.

10-08-82*

12-01-82 Deleted requirment of turbine cwerspeed pmtection testing.

3/4.3.4)

Required due date to preclude power reduction to conduct tests.

ATTA09 M LIQNSI!G ITB6 ilEI)JIRIlG 164C #PIGAL IN 1983 Actal*/Ponpneri Ib a W 164C Item AFCo Sdmittal Ikte Approval Date r%

7. RCS Pmssure Isolation Valves for FtP 1 and 2 08-10-82*(Original 09-21-82 Incorporates Unit I criteria for leak testing of mactor (T.S. 3/4.4.7.2 and 3/4.4.7.3) submittal)-

(Original coolant systen isolation valves into thit 2 specifications.

12-23-82*(Additional request)

Deletes paragraph 4.4.7.3.2 for Units 1 and 2.

sthmittal) 07-01-83

8. Mechanical Snubber Functional Test Exemtim 11-05-82*

12-01-82 Requests mechanical snubber quantitative functional testing forF?P1(T.S.4.7.9.e) mquirment be changed frun fourth mfueling outage mtil the fifth mfueling outage due to mavailability of mquimd testing equipment. Lack of change muld delay scheduled mstart of the mit. The fourth refueling outage is sche & led to begin January 14,1983.

9. Waste Gas Hyfrogen/0ggen Analyzers for FfP 1 and 06-01-83 12-01-83 Requests the requirunent of quarterly chamel calibrations and 2 (T.S. Table 4.3-9) mmthly functional tests for the este gas system be changed to annually.
10. ISI/IST Licensing Program
a. Unit 1 Inservice Inspectim (ISI) Prugran for A9E Code Class 1, 2 and 3 Conpanents 01-17-81*

Cmpliance with this regJirement precipitates violation of

1. Relief Requests m essel cladding exam-Supplanented 09-01-83 ALAA camitments.

inations.

01-10-83*

2. Relief Requests m hyfrostatic test 01-1EM3 09-01-83 It is rot possible to conduct these tests at Code mquired requirements.

tenperatures.

O

ATTJO90E LIGNSIIG ITB6 IEQJIRIE ISE #PIDR. Ill 190 Actual */Penpn=t Ilypctaf ISE Item

  1. Co Sd mittal Ikte Approval Date Cements l
b. thit 2 Inservice Inspection (ISI) Program for A9E Code Class 1, 2 and 3 Capanents
1. Revision 0 Relief Requests 07-25-80*

09-01-83 Grtain Code mquirements are inpractical.

2. Relief Raquests m vessel cladding 01-10-83*

09-01-83 Canpliance with this requirsent precipitates violation of exminaticris.

/URA conmitments.

l

3. Relief Requests m hydrustatic test 01-1 M 3 09-01-83 It is not possible to conduct these tests at Code required reqmrments.

tsperatures.

c. thit 1 Inservice Testing (IST) Program for A9E Code Class 1, 2 and 3 Capanents
1. Revision 2 Relief Requests 04-21-80*

03-15 83 TDAFW Valve operability cannot be directly cbserved.

i

2. Revision 3 Relief Requests 07-16-81*

03-15-83 This Code requirsent is a Technical Specification violation.

3. Revisian 4 Relief Requests 10-25-82*

m-15-83 Maerous wives re@ iring warterly stroke tests potentially wipunise plant safety. MITE: These valves require testing d.

thit 2 Inservice Testing (IST) Prugram for by appruxinately 03-30-83.

A9E Code Class 1,2 and 3 capanents.

1. Revisian 0 Relief Requests 03-12-80*

02-15-83 See of these peps and valves cannot be tested per Code requiremerta che to:

1. Potential wvunise of plant safety
2. Design Restriction
2. Revision 1 Relief Requests 03-17-82*

02-15-83 Certain valves cannot be tested per Code re@irments due to:

1. Potential wivunise of plant safety
2. Design Restriction 6

ATTADMNT LIENSIE IlB6 IEI)JIRIE IRC #PlafAL IN 19EG Actua1*/Pminwrf Rupested IRC Iten

  1. Co S & sittal Ikte Approval Date Omuents
3. Revision 2 Relief Requests 08-06-82*

02-15-83 Mrerous valves regjiring quarterly struke tests could potentially wvuaise plant safety. Note: Tlese valves require testing by approximately 03-01-83.

11. Spent Fuel Pool Storage Additions for FtP 1 03-19-82*

11-01-82 Incmases storage capacity of spent fuel fran 675 to 1407 locations.

12. Change 18 Nnth Interval to Refueling 04-01-83 10-01-83 Change is necessary to make surveillance intervals consistent with new 18 month fuel cycle outage schedule as opposed to arbitrary tine inkval.
13. Meteorulogical Toer Surveillance for FtP 1 and 2 02-01-83 08-01-83 Mds backup tower in respmse to RJREG-0737 III A.2.2. to pmclude report issuance m failure of primary tower instru-(T.S.3.38and4.35) rnents.

14 In-Core Thinbles for FtP 1 and 2 (T.S. 3.3.3.2)

See Conments See Conments APCo will advise the PRC by 03-01-83 of action to be takes.

15. Safety Evaluations for Next Fuel Reloads :
a. Unit 115 flow %dification 08-16-82*

WA Mvise NRC of Unit 1 mactor vessel intdmal modifications.

I 03-14-83 WA

%ise NRC of Unit 1 Cycle 5 core desi@ status.

b. Unit 1 Cycle 5
c. Unit 2 Cycle 318 ftrth D.el Cycle 09-01-83 WA Mvise NRC of Unit 2 Cycle 3 core desim status.

I O

a-

ATTAD90fr LI&MSIE IID6 EIKIIRIE 100 MPRDWAL IN 1983 Actial*/ Proposed Ibu=dai 100 Itan AFCo Sdmittal Date Apprwal Date ra===ts

16. F411 and Positive Moderator Temeratum See Comnents See Coments APCo will advise the PRC by 03-01-83 of a-tion to be taken.

Coefficient

17. Contairment Spray 04 8 10-01-83 Incorporates 5% ptmp head nargin to allow for potential purp degradation.

18 Technical Specification Optimization Generic myiew to begin in 1983.

Westinghouse 0mers Group

19. Safety Related Battery Changes 04-15-83 10-15-EG Reflects accepted industry and wndor practices.
20. Rod Swap Test During tot Power Physics Testing See Coments See Connents Appmval of this generic issue (WAP 9863/9864) by the PRC is anticipated by Feburary 25,1983. Provided generic appmval is granted, APCo will utilize the rod swap technique for the thit 1, Cy:le 5 mload and infonn the PRC as pad of the pmviously scheduled 50.59 submittal. If gmeric approval is delayed beyond February 25,1983, APCo will, by ?brch 1,1983, rupest interim appmval by April 1,1983 for Unit 1 Cy:le 5 only.
21. Rod Drop Timing Test During Low Power Physics See Carments See Canments APCo will advise the PRC by 03-01-83 of action to be taken.

Testing O

ATTA090ff LICD61E IN EINIRIE NIC #PIOfAL IN 1983 Actaal/Ponpmsd APCo llegsired NC Its Sd mittal Date Appraal Date Queents

22. Alto Rod Control Above 90 % Power for Unit 2, (B-01-83 VA Advise NRC of application for new proposed rod drop methodology Cycle 2 and thit 1, Cycle 5 to Farley. New methodology will be included in thit 1, Cycle 5 reload analysis and has been included in thit 2 Cycle 2 mload analysis. This date is dependent upon MC approval of the Westinghouse report in January 1983.
23. thit 2 Licensing Deletion Amend:ent 01-12-83 WA Close out license conditions discussed in APCo's 10-19-82 Clarification Letter letter.
24. FSAR Update 07-01-83 N/A Provide NRC with required annual update of the Farley FE'J.

ATTACH elT LICDtSIE ITD6 IEI)JIRIE IRC #P!10WAL IN 190 ActLal*/Prnpnavi Wated imC Itan APCo Sdunittal Date A pra al Date D-=vts

25. Akinistrative Changes
a. Acctrolator and ECCS Subsystem for FW 1 and 2 02-01-83 09-01-83 Changes " breaker" to disconnect device for clarification (T.S.4.5.1.1.(c)and4.5.2.(a))

purposes.

b. Generic Letter 8217 on Audit of Ehergency Plan 10-25-82*

09-01-83 Requires FW technical specification change to incorporate for F W 1 and 2 (T.S. 6.5.2.8.e) an audit of emergency preparedness program eery 12 months vice every 24 months,

c. Fechanical and Hydraulic Snubber Lists for FW 1 06-01-83 09-01-83 Modify the present list of safety related sntbbers to reflect and Hydraulic Snubber List for FW 2 (T.S. Table actual asstoptions made in seismic safety-related analyses.

3.7-4b)

d. Aininistrative Changes for FW 1 and 2:

m-01-83 09-01-83 Reflects actual plant desity and other adninistrative danges.

1) Fire Detectors Table 3.3-12 Itsn 5 clunge will preclude sinultaneous shutdmn of both 2

Rm Isolation 4.5.2.d.1 units to perform service witer battery test.

3 River Water Sury 3/4.7.5 4

Yard Fire Hydrant Table 3.7-7

5) ServiceWaterBattery4.8.2.5.2(d)
6) Orgwaization Chart Figure 6.2-2 O

G

LICD61E ITB6 IEI)JIRilG IEC MPinfAL IN 190 Actua1*/Ponpnad Iba=ctM MC Itan

  1. Co SJmittal Date Appra el Date Dummts
25. Adninistrative Changes (ccritinud)
e. Unit 2 Pmssum Sensor Table (T.S. 3.3.3.7) 03-01-83 09-01-83 Reflects actual plant design.
f. Unit 1 Refueling 0;tage Change: Containmnt (B-01-83 09-01-83 Reflects new plant design.

Vent

g. Turbine Building Hydraulic Smbbers for FW 2 12-10 82*

09-01-83 Reflects actual plant design by deleting non safety-related Snubbers.

h.

Incorporation of Licensing Requirsaents 11-24-82*

09-01-83 for FW 2

1) FW 2 License Condition 2.C.(17) -

Replaces the 18 inch mini-purtje valves with the new 8 inch Contairinent Vent Line vents.

2) Mechanical Smbber List for FW 2 (T.S.

Adds the list of safety related nechanical snubters.

Table 3.7-4b)

3) FW 2 License Condition 2.C.(19)(b) -

Contairment Overturmnt Protection Adds the list of Contairment Overcurrent Protection devices,

i. Ortjanization Change to Offsite Managenent for 11-16-82*

09-01-83 Changes the corporate organization for the ?bclear Generation F W 1 and 2 Department.

.