Responds to NRC Re Violation Noted in IE Insp Rept 50-370/82-32.Corrective actions:safety-related Cable 2KC520 Terminated & Const Procedures Revised to Include Insp of Nonsafety Cables in Auxiliary & Reactor Bldgs
ML20070M326
Person / Time
Site: Mcguire
Issue date: 12/22/1982
From: Tucker H
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20070M318 List:
References
NUDOCS 8301250155
Download: ML20070M326 (2)


Text

e e'

e N 90 Di3NE POWER GOMPANY

?

/ t'

i. '

P'.O. ItoX 33180 r

3 CHAltLOTTE, N.C. 28242 II AL 11. TUCKEH TER.EPHONE

_9 nre a

? l. 0 gber 22, 1982 Deca (ro4) ora-4sai m,....,,,

/Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

Subject:

McGuire Nuclear Station Docket No. 50-370

Reference:

RII:PRB 50-370/82-32

Dear Mr. O'Reilly:

Please find attached a response to violation 50-370/82-32-01 which was identi-fled in IE Inspection Report 50-370/82-32.

Duke Power Company does not consider any information contained in this report to be proprietary.

Very truly yours,

/p llal B. Tucker j

WilM:scs i

i Attachment cc: Senior Resident Inspector McGuire Nuclear Station

(' 8301250155 830112

~~

J PDR ADOCK 05000370 O

PDR l

l l

o 1

'J DUKE POWER COMPANY MCGUIRE NUCLEAR STATION Response to IE. Inspection Report 50-370/82-32 Violation 50-370/82-32-01, Severity Level IV:

10CFR 50, Appendix B, Criterion V, as implemented by Duke Power Company QA Topical Report Section 17.1.5, requires that activities affecting quality be accomplished in accordance with documented instructions, procedures, or drawings. McGuire Electrical Separation Criteria DC-1.01 states in paragraph C.2 that "non-safety related cables may be run with Class 1E cables except that no non-safety related cable is mutually common (i.e., run with different safety channels) to redundant safety related cables."

Contrary to the above, non-safety cables 2 KC 534 and 2 KC 538 were routed in safety-related train A tray after being routed through the redundant safety-related train B tray at junction point 8757.

Response

1.

The station agrees the violation occurred as stated.

2.

Safety-related Cable 2* KC 520 was' terminated and inspected but the separation problem was not detected by the electrician or the inspector.

3.

Routine sampling inspections have been made in the Auxiliary and Reactor buildings on non-safety cables-(black) to insure.that the separation criteria is not being violated. Inspections were made on approximately 300 cables of the 3048 total cables identified. The resulting conclusion is that this was an isolated case and definitely not generic.

4.

Construction procedures have been revised to include the inspection of non-safety (black) cables which are pulled into the Auxiliary and Reactor buildings.

5.

The station is presently in full compliance with regulations in this area.