_.

w i

CENTER 00R ENERGY Donald C. Shelton 300 Madson Avenue Vce Preskient.Nuclev Toledo. OH 436520)01 Dads Besse (419)249 2300 l

Docket Number 50-346 License Number NPF-3 Serial Number 1905 March 8, 1991 United States Nuclear Regulatory Commission Document Con (N' Desk Vashington, D. C z 20555 Subj ec t :

Fire Protection - Response to Request for Additional Information l

Gentlemen:

On February 6, 1991, Toledo Edison (TE) representatives met with the Nuclear Pegulatory Commission (NRC) Staff at the NRC Headquarters in Rockville,

^

Maryland to review the draft Davis-Besse Nuclear Power Station (DBNPS)

Appendix R Fire Protection Safety Evaluation Report. -During that meeting, the NRC Staff requested that TE submit a letter cross-referencing information contained in Attachment 2 to TE letter Serial Number 1757, dated February 16, 1990 to the Fire Hazerds Analysis-Report Revision 12. to the February 16, 1990 TE letter referred to the Appendix R Compliance Assessment-Report (CAR), Revision 5.

The CAR was superseded by-the Fire Area Optimization Report (FAOR), Revision 0 on April 18, 1990, which was submitted to the NRC under TE letter Serial-Number 1801, dated April 25, 1990.

FAOR, Revision 0 was superseded by FAOR, Revision 1 on May 1, 1990, which was submitted to the NRC under TE letter Serial. Number-1805, dat9d May 10, 1990. The information provided in TE's February 16, 1990, letter was reflected in.the FAOR. FAOR, Revision 1 was superseded by the Fire Hazards Analysis Report (FHAR), Revision 12 on June 30, 1990, which was submitted to the NRC under TE letter Serial Number 1854, dated November 8, 1990.

As requested by the NRC Staff, the attachment to this letter provides a cross-reference between the CAR, Revision 5, references listed in Attachment 2 of TE's February 16, 1990, letter-and the location of the related' 6

information in-FHAR, Revision 12.

It is TE's understanding that the submittal of this_information vill assist in expediting.the NRC Staff's completion of the DBNPS Fire Protection' Safety Evaluation Report.-

9103140313 910308 ADOCK05000g"6 g

PDR Operonng Companies l

C:eveland Electne Illuminanng f

1 @ 0 3 0-i!

Toledo Edison

Docket Number 50-346-License Numbar NPF-3' Serial Number'1905 Page 2

?

t i

l If you have any questions, please contact Mr. R. V. 'Schrauder, Manager -

i Nuclear Licensing, at-(419)-249-2366.

Very ly yours, i

f

/\\/h r

I Attachment r

l KBR/mmb cc P. M. Byron, DB-1 NRC Resident Inspector A. B.: Davis, Regional Administrator, NRC Region III D. C. Di Ianni, DB-1 NRC Senior Project Manager M. D. Lynch, DB-1 NRC Backup Project Manager Utility Radiological Safety Board I

l -

l l

(

l 1

l i

'I w,.-

-y-e-,-v-w-

gr w

q, m y y-g

- w -v vy w--g-g,~yg-w-vg pr y pp g.(gt7'g

=?Og "

y e t

  • hw p-g 31 a-mp-e r-p w

s-gy.e<r wtw-,sw tq t-e

t

.Dockot NumberL50-346 License Number aPF-3 Serial Number 1905 Attachment Page 1 4

Selected CAR,-Revision 5 and-THAR, Revision 12 Cross-References

~

(

l This-is a CAR, Revision 5 and FHAR,-Revision 12 cross-reference list for each' item, as appropriate, in Toledo Edison's letter Serial Number 1757, dated February 16, 199D, Attachment 2.,

J tems for which there were no~ CARL references are not listed.

Fire areas are-referenced in both the-CAR, Section 4 and FHAR, Section 4 as " Fire Area 4.**", where "**" represents the Fire Area designation (such as Fire-Area DD).

Vhenever appropriate, specific FHAR Sections and page numbers are listed.

Serjul No. 1757 CAR, Revision 5 FHAR, Revision 12' Item No.

References

. References

-Comments 4

Table 2-1 and 2 These various fire See Note 1.

list various fire:

areas are listed in areas that are in the_ corresponding Section 4 Section 4 7

Various fire

'Various fire-FHAR still reflects areas in Section 4 areas in Section 4 revised commitment.

See Note 1.

8 4.II Page 4.BG-14 FHAR stil)Lreflects

- revised: commitment.

9 Table 6-3 Section 6

. See-Note 2.

Table 6-6 Section 6 See Note 2.

10 Table 6-2 Section-6

~See Note 2.

11 Various fire Various fire See Note 2.

areas in Section 4 areas in Section 4 l

12 4.T Pages 4.T-7,-8 FHAR still reflects

-revised commitment.

13 4.DD/FF, Note 73

-Page 4.00-27 FHAR still reflects see Notes 45 & 48:

revised' commitment.

Page 4.FF-371 see Notes 45 & 48 14 4.DD/FF, Note.38 Page 4.DD See Note 2.;

Page 4.FF-15 See Note 2.

o L

15 4.D Pages 4.D-7,-8 FHAR still-reflects 4.DA-Pagy 4.A-8 tevised commitment.

l 4.DF Page 4.DP-3 i

16 4.DJ, Note 33 Page 4.A-33

'FHAR still reflects

- revised commitment.

4 5

~ ~ ~

........,,,,ry,,

,.U...,,....,y.

,.,_.,,,y...y m

,g

Docket Numbar 50-346 License Number NPF-3 Serial Number 1905 Attachment Page 2 Serial No. 1757 CAR, Revision 5 FHAR, Revision 12 Item No.

References References Comments 17 4.X, Note 6 Page 4.X-11 For 4.X, see Note 2.

4.DD, Note 46 Page 4.DD-10, 11 For 4.DD and 4.0, 4.0, Notes 7,8 Page 4.0-9 FHAR still reflects revised commitment.

Note 1:

FAOR Rev. 1, submitted in Serial 1805, dated May 10, 1990, provides a cross-reference for pre-optimiza' in to post-optimization fire areas.

Note 2:

For these items, the ort commitment was not completed and the basis is provided in Serial 1757.

.erefore, the listed FHAR section does not discuss the original commitment.

4 I

.