Text
sus
- - - =
&,,_pn.tizens Urging Responsu.,,e e,nergy
= _
g al L_u_._ __ _ _ _ ________ _ __ _ __ _ ___ _ _ _ a February 27, 1991 Mr.
R.
Erickson, Chairman Emergency Planning Task Force US Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Erickson:
It was good to meet you on Monday.
We appreciate the opportunity to voice our contorns and to provide document 6 tion to the Task Force.
However, we do feel t.h e Inspector General's report has established that the Boston Edison Company is not the best source of information on the status of offsite planning.
We understand, of course, t.he need for a quest. ion line as to thnir support or interface with the offsite program.
I have enclosed a revision to page 1 of the statement that I made at the meeting.
I t. contains one corrections the number of hospitals which have agreed to act, a s h o s t only" shcuid be 3.
Some othar minor changes.iuve been made for cl a r.i f i ca ti on.
I have underlined them for your convenience.
Please provide us with a copy of the meeting transcript when it becomes available, finally, we would like to know if your committee was provided with the copies of the documents we submitted for inclusion into the record of the October 30, 1990 meeting of the Interior subcommittee on General Oversight and Investigations chaired by Representative Peter Kostmayer in Plymout.h. (Appendix enclosed)
We look forward to your reply.
Sincerely yours, hvC<,,
b
~
Mary C. Ots, Co-Chairman ec:
Duxbury Board of Selectmen
[
9103140112 910307 PDR ADOCK 05000293 F
PDR f
9
.4
(, ma u.. mum.n:,mmumemame.nnenm wwmemmem_mn w mu uwmmm.-
n s
em ms C4.h.ZenS UEgEng h0830HSRO bHOEgy 1
u__ _._ ______ ___ ___ _ ____ ____w Statement for record of Nuclear Regulatory Commission Task Force Meeting in Plymouth, MA-February 25, 1991, by Mary C.
Ott, Co-Chairman revised - 2/27/91 I thank you for the opportunity t o tr a k e a brief statement this afternoon.
Since many orovious speakers Fave articulated a host of concerns, I would like to focus on one ve feel is of primary importance to the successful implement.ation of emergency planning; that of offsite medical services.
According to 10 CFR 50.47 (b)(12) there is a requirement that pre-accident arrangements for medical services (beyond the malr.t enance of a list of treatment facilities) exist for individuals who might be severely exposed to dangerous levels of offsite radiation folicving an accident at a nuclear power plant.
We have reviewed a collection of letters of understanding which exist, between medical facilities and the Commonwealth.
The copies were received on February 8, 1991 from Julia Gabaldon of MCDA.
The letters reveal that 13 facilit.ies have "agrecments" with the Commonwealth.
There are a total of 15 letters, as two facilities serve the dual purpose of host.
Close scrutiny reveals:
1.
Three facilities will act a s hos t* only.
66 2.
One facility will accept contaminated patients 3
3.
Ten letters do not specify in case of a " radiological" emergency at FNPS 4.
Jordan hospital's agreement is with BECo and for workers.
This facility is within the EPZ 5.
Two hospitals are on Cape Cod, therefore will be inaccessible, as evacuation procedures call for the closing of the Sagamore Bridge The remaining facilities can only treat a maximum of 2-3 radiation contaminated injured individuals within a'12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> period.
Therefore it would be imoossible to respond to the needs of over 100,000 residents of the LPZ should assist.ance be required.
%It9.f.e f ARllI11R11_ aBLCR1DSLl9_.p r ov i d e a S s iElitncfL_fRr_nitfling_ lt0JILQ2.
or home UltlRDiugn i r i n n Engm _ag_.nniaca.tica (617) 934-5574 Duxbury, Masrachusetts OE1 Post Off:ce Box 2621
= - - - -. - - - - - - -,
,___=
Citizens Urging Responsible Energy u ---
ATTACHMENT I Appended list of documents for inclusion into the record of the October 30, 1990 meeting of the Interior Subcommittee on General Oversight and Investigations in Plymouth, Massachusetts:
1.
Oc ober 5, 1989 letter from Edward F.
Lawson, on behalf of Duxbury CURE regarding scheduled October 12, 1989 drill 2.
October 15, 1989 letter from Mary C.
Ott with complete allegations to Inspector George Mulley 3.
January 10, 1990 letter to Mr. Abduhl Hamadeh regarding continuing misrepresentation of facts by the NRC 4.
March 19, 1990 letter to Jon R.
Johnso;i from Duxbury CURE and David L.
Quaid citing Pilgrim's history since return to operation 5.
July 30, 199 0 l')t t e r to Senator Edward M.
Kennedy j
from Duxbury CURE calling for support for Pilgrim's shutdown until balance of allegations are investigated, and emergency planning is approved 6,
September 6, 1990 letter to NRC Chairman, Kenneth Carr from Duxbury and Plymouth CURE in response to NRC actions taken as a result of the Inspector General's report 7.
Statement of Duxbury and Plymouth CURE at September 6, 1990 NRC meeting in Plymouth, Massachusetts S.
NRC Inspection Report 50-293/90-21 regarding a September 2-3 operating event at Pilgrim which demonstrates that public health and safety are being j eopardized while we have no approved emergency planning in place.
We vill furnish the committee with an analysis of this event within one week.
Post Office Rox 2621 (617) 934-5574 Duxbury, Massachu. 02331
+
. _ _ _ _ _ _ - _ - _ _ -