Emergency Amend 63 to License NPF-58 Changing TS in Response to Application
ML20070H373
Person / Time
Site: Perry 
Issue date: 07/15/1994
From: Zwolinski J
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20070H381 List:
References
NUDOCS 9407210242
Download: ML20070H373 (4)


Text

-

l tearauy 8

g(

S UNITED STATES NUCLEAR REGULATORY COMMISSION

.....f WASHINGTON, D.C. 2055!HM01 THE CLEVELAND ELECTRIC ILLUMINATING COMPANY. ET AL.

DOCKET NO. 50-440 PERRY NUCLEAR POWER PLANT. UNIT NO.-1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No'.

63

-License No. NPF-58 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by The Cleveland Electric Illuminating Company, Centerior Service Company, Duquesne Light Company, Ohio Edison Company, Pennsylvania Power Company, and Toledo Edison Company (the licensees) dated July 14, 1994, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),

and the Commission's rules and regulations set forth in 10 CFR Chapter 1-1 B.

The facility will opercte in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that-such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifi-cations as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-58 is hereby amended to read as follows:

9407210242 940715 PDR ADOCK 05000440 P

PDR

-(2) Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 63 are hereby incorporated into this license.

The Cleveland Electric Illuminating Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective immediately.

FOR THE NUCLEAR REGULATO COMISSION ik

\\

John A. Zwolinski, Assistant Director for Region III Reactors j

Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Attachment-Changes to the Technical Specifications Date of issuance: July 15, 1994 j

-9

ATTACHMENT TO LICENSE AMENDMENT NO. 63 FACILITY OPERATING LICENSE NO. NPF-58 DOCKET NO. 50-440 i

i Replace the following page of the Appendix "A" Technical Specifications with the attached page. The revised page is identified by Amendment number and contains vertical lines indicating the area of change.

j Remove Insert j

3/4 6-8 3/4'6-8 t

i i

i

~

.~,

-,,-g,,,

-a,n,

,-g

CONTAINMENT SYSTEMS MSIV LEAKAGE CONTROL SYSTEM LIMITING CONDITION FOR OPERATION l'

l 3.6.1.4 Two independent MSIV leakage control system (LCS) subsystems shall be i

GPERABLE.

APPLICABILITY: OPERATIONAL CONDITIONS 1*, 2*, and 3*.

i l

ACTION:

l With one MSIV leakage control system subsystem inoperable, restore the L

inoperable subsystem to OPERABLE status within 30 days or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />..

j SURVEILLANCE REQUIREMENTS i

4.6.1.4 Each MSIV leakage control system subsystem shall be demonstrated-l OPERABLE:

i j

.a.

At least once per 31 days by verifying:

1.

Blower OPERABILITY by starting the blower (s) from the control 1

room.and operating the blower (s) for at least 15 minutes..

2.

Inboard heater OPERABILITY by demonstrating electrical continuity of Lthe heating. element circuitry by verifying.

the inboard heater draws 8.28 10% amperes per. phase.

b.

During each COLD SHUTDOWN,_if not performed within the previous 92-days, by cycling each motor operated valve, including the main steam stop valves, through at least one complete cycle of full travel.

c.

At least once per 18 months by:

1.

Performance of a functional test which includes simulated '

I actuation _of the subsystem throughout its operating sequence, and verifying that each automatic valve actuates'to its correct position, and the blower (s) start (s).

2.

Verifying that the blower (s) develop (s)~'at least the below.

required vacuum at the rated capacity:

a)

Inboard system,15" H,0 at 1100 scfm.

b)

Outboard system,15" H,0 at 2 200 scfm.

'd.

By verifying the inboard flow and inboard:and outboard pressure instrumentation to be OPERABLE.by performance of a:

)

1.

CHANNEL FUNCTIONAL TEST at least once per 31 days, and 2.

CHANNEL CALIBRATION at least once per 18 months.

  • The provisions of Specification 3.0.4 are not applicable from the effective -

date of this amendment until the completion of Operating Cycle 5.

PERRY - UNIT 1 3/4 6-8 Amendment No.63

.