[joQRfc,I u
t 3
2, UNITED STATES 5t i
NUCLEAR REGULATORY COMMISSION
(.....,/
WASHINGTON, D.C. 2055 % 001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO.187 TO FACILITY OPERATING LICENSE NO. DPR-50 l
METROPOLITAN EDISON COMPANY JERSEY CENTRAL POWER & LIGHT COMPANY PENNSYLVANIA ELECTRIC COMPANY GPU NUCLEAR CORPORATION THREE MILE ISLAND NUCLEAR STATION. UNIT NO. 1 DOCKET NO. 50-289
1.0 INTRODUCTION
By letter dated April 11, 1994, the GPU Nuclear Corporation (the licensee) submitted a request for changes to the Three Mile Island Nuclear Station, Unit No.1 (TMI-1) Technical Specifications (TS). The requested changes would-relocate the detailed requirements and criteria of the tendon surveillance program to the TMI-1 Updated Final Safety Analysis Report (UFSAR). The NRC issued Revision 3 of Regulatory Guide 1.35, " Inservice Inspection of Ungrouted Tendons in Prestressed Concrete Containments," in July 1990. The licensee plans to incorporate the Regulatory Guide provisions into the THI-l tendon surveillance program. Approval of this change request is needed to facilitate implementation of these revisions to the surveillance program prior to the next scheduled tendon inspection in September 1994.
2.0 EVALUATION Section 50.36 of Title 10 of the C.9.d121 Federal Reculations establishes the regulatory requirements related to the contents of TS.
The rule requires that TS include items in five specific categories, including (1) safety limits, limiting safety system settings, and control settings; (2) limiting conditions for operation; (3) surveillance requirements; (4) design features; and (5) administrative controls. However, the rule does not specify the particular requirements to be included in a plant's TS. The NRC developed guidance criteria, as described in the " Final Policy Statement on Technical Specifications Improvements for Nuclear Power Reactors," (58 FR 39132) (Final Policy Statement) which can be used to determine which of the design conditions and associated surveillances need to be located in the TS. The Final Policy Statement approved the statement of the Atomic Safety and Licensing Appeal Board in Portland General Electric Co. (Trojan Nuclear Plant), ALAB-531, 9 NRC 263,273 (1979), as to the basis for requiring matters to be included in the TS.
The Appeal Board stated:
... there is neither a statutory nor a regulatory requirement that every 9407210192 940714 DR ADOCK 0500 9
l operational detail set forth in an applicant's safety analysis report (or equivalent) be subject to a technical specification, to be included in the license as an absolute condition of operation which is legally binding upon the licensee unless and until changed with specific Commission approval.
Rather, as best we can discern it, the contemplation of both the Act and the regulations is that technical specifications are to be reserved for those matters as to which the imposition of rigid conditions or limitations upon reactor operation is deemed necessary to obviate the possibility of an event giving rise to an immediate threat to the public health and safety."
Briefly stated, the guidance criteria provided by the Final Policy Statement are (1) detection of abnormal degradation of the reactor coolant pressure boundary, (2) bounding conditions for design basis accidents and transients, (3) primary success paths to prevent or mitigate design basis accidents and transients, and (4) functions determined to be important to risk or operating i
experience. The Commission's Final Policy Statement acknowledged that items which are relocated from the TS to licensee-controlled documents such as the UFSAR would in turn be controlled in accordance with the requirements of 10 CFR 50.59, " Changes, tests and experiments."
10 CFR 50.59 provides criteria to determine when facility or operating changes planned by a licensee require prior Commission approval in the form of a license amendment in order to address any unreviewed safety questions.
Prior to issuing NUREG-1430, " Standard Technical Specifications for Babcock j
and Wilcox Plants" in September 1992, the staff concluded that neither i
10 CFR 50.36 nor the Commission's Final Policy Statement require the detailed containment tendon surveillance program requirements to be retained in TS.
Surveillance Requirement SR 3.6.1.2 in NUREG-1430 contains only the words
" verify containment structural integrity in accordance with the Containment i
Tendon Surveillance Program." Nowhere else in NUREG-1430 is there any reference to containment tendons.
In other words, the staff has already evaluated and approved removing the detailed tendon surveillance requirements from the TS and specifying those requirements in a licensee-controlled document, such as proposed by the licensee in the subject request.
The staff's review of the proposed TMI-1 TS change determined that relocation of the containment tendon surveillance program requirements to the UFSAR does not eliminate the requirements for the licensee to ensure that the containment tendons are capable of performing their safety function. The licensee must continue to evaluate any changes to the surveillance program in accordance with 10 CFR 50.59.
Should the licensee's determination conclude that an unreviewed safety question is involved, due to either (1) an increase in the probability or consequences of accidents or malfunctions of equipment important to safety, (2) the creation of a possibility for an accident or malfunction of a different type than any evaluated previously, or (3) a rtduction in the margin of safety, NRC approval and a license amendment would bt required prior to implementation of the change. NRC inspection and enforconent programs also enable the staff to monitor facility changes and licensee adherence to UFSAR commitments and to take any remedial action that may be appropriate.
F I l The action statement associated with TS Section 3.19.1.1, regarding plant shutdown if containment structural integrity cannot be restored to within limits, is not changed by this request nor are the reporting requirements in TS Section 3.19.1 and 4.4.2.1.6 affected.
The staff has determined that the detailed containment tendon surveillance program requirements are operational details related to the licensee's safety analyses which are adequately controlled by the requirements of 10 CFR 50.59. Therefore, the continued processing of license amendments related to revisions of the affected detailed containment tendon surveillance program requirements, where tha revisions to those requirements do not involve an unreviewed safety question under 10 CFR 50.59, would afford no significant benefit with regard to protecting the public health and safety.
Further the requirements do not constitute a condition or limitation on operation necessary to obviate the possibility of an abnormal situation or event giving rise to an immediate threat to the public health and safety, in that the ability of the containment tendons to perform their safety functions is not adversely impacted by relocation of the surveillance program from the TS to the UFSAR.
The staff also finds that relocation of the detailed surveillance program requirements and criteria to the UFSAR is consistent with NUREG-1430.
The licensee's Inservice Tendon Surveillance Program, conducted in accordance with TMI-1 Surveillance Procedure SP 1301-9.1, will conform to the NRC Regulatory Guide 1.35, Revision 3' prior to the next inspection.
The staff has concluded, therefore, that relocation of the detailed containment tendon surveillance program requirements is acceptable because (1) their inclusion in TS is not specifically required by 10 CFR 50.36 or other regulations, (2) the detailed containment tendon surveillance program requirements, following their relocation to the UFSAR, will be adequately controlled by 10 CFR 50.59, (3) their inclusion in the TS is not required to avert an immediate threat to the public health and safety, (4) changes that are deemed to involve an unreviewed safety question will require prior NRC approval in accordance with 10 CFR 50.59(c), and (5) this request is entirely consistent with NUREG-1430, which has previously been reviewed and approved by the NRC staff.
In addition to the above changes, the licensee proposes that TS Section 4.4.2.1.3, Containment Surfaces and TS Section 3.19.1.2 be deleted.
The staff finds that it is an administrative change since both TS Section 4.4.2.1.3 and TS Section 3.19.1.2 are redundant statements which have been stated elsewhere in the TS.
Therefore, the staff also finds these changes acceptable.
3.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Pennsylvania State official was notified of the proposed issuance of the amendment. The State official had no comments.
4 9
4.0 ENVIRONMENTAL CONSIDERATION
The amendment changes requirements with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendment involves no significant increase in the amounts or types of effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration, and there has been no public comment on such finding (59 FR 29627).
Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9).
Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
5.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that:
(1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor:
C. Chung Date:
July 14, 1994 l