ML20070F535

From kanterella
Jump to navigation Jump to search
Seventh Interim Significant Const Deficiency Rept 40 Re ITE-Gould Starter Coil Failure in Containment Cooling Fans. Lab Testing of Six Coils Returned to Vendor Scheduled to Be Completed by 821210.Final Rept Will Be Submitted by 830110
ML20070F535
Person / Time
Site: Waterford Entergy icon.png
Issue date: 11/15/1982
From: Maurin L
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, W3I82-0095, W3I82-95, NUDOCS 8212210172
Download: ML20070F535 (1)


Text

LOU 1SIANA 142 DRAAONDE STREET P O W E R & L i G H T! P O Box coos . NEW ORLEANS. LOUIStANA 70174

. (504) 366 2345 u':N$ s5sM November 15, 1982 L. V MAURIN Voce President Nuclear Operations W3182-0095 Q-3-A35.07.40 Mr. John T. Collins, Regional Administrator, Region IV _

1 U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000  %["d @ %"{ l\\l/(i lb J

+1 Arlington, Texas 76012 ,

, ki ' NOV i 71982

SUBJECT:

Waterford SES Unit No. 3 l l t h Docket No. 50-382 J ("\l Significant Construction Deficiency Report No. 40 , l "ITE - Gould Starter Coil Failure in Containment Cooling Fans" Seventh Interim Report

REFERENCES:

1) LP&L Letter W3K-81-0412 Dated November 17, 1982
2) LP&L Letter W3I82-0032 Dated September 15, 1982

Dear Mr. Collins:

The ITE-Gould Company received from Ebasco six (6) starter coils for examination and evaluation to determine why the coils failed. Part of the examination will be performed by an outside test lab. The lab testing is scheduled to be completed by December 10, 1982. When the test report is received, it will be evaluated and a final report submitted.

In view of the above, a final report will be submitted by January 10, 1983.

Very truly yours,

$)

L. V. Maurin derd LVM/ MAL:keh cc: 1) Director 3) E. Blake Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission 4) W. Stevenson Washington, D. C. 20555

2) Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission h

Washington. n c. 20555 \(v, O212210172 021115 PDRADOCK05000g S