Request for Amend to License NPF-8,deleting Eight nonsafety- Related Snubbers from Tech Spec Table 3.7-4a.Safety Evaluation Encl
ML20070F376
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 12/10/1982
From: Clayton F
ALABAMA POWER CO.
To: Varga S
Office of Nuclear Reactor Regulation
Shared Package
ML20070F379 List:
References
NUDOCS 8212210130
Download: ML20070F376 (3)


Text

- - - - -

Mailing Address Al%ma Power Comp ny

- **' 600 North 18th Street

  • *; k Post Offica Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6081 F. L Clayton, Jr.

g=g;Tl"' AlabamaPower the southern electrac system December 10, 1982 Docket No. 50-364 Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Mr. S. A. Varga Joseph M. Farley Nuclear Plant - Unit 2 Hydraulic Snubber Technical Specification Gentlemen:

During a recent verification review of hydraulic snubbers installed at Joseph M. Farley Nuclear Plant - Unit 2, eight snubbers were found to be inadvertently included in Technical Specification Table 3.7-4a.

These eight snubbers are installed on the main steam piping inside the turbine building and are not required for any safety-related function.

Since only safety-related hydraulic snubbers are to be included in Technical Specification Table 3.7-4a, it is respectfully requested that these eight snubbers be removed as an administrative change.

Alabama Power Company's Plant Operations Review Committee has reviewed this proposed change to the technical specifications and has determined that no unreviewed safety question is involved as shown in Attachment 1. The corrected technical specification pages are included in Attachment 2. The Nuclear Operations Review Board will review this proposed change at a future meeting.

This proposed change is designated as Class II in accordance with 10 CFR 170.22 requirements since it is administrative in nature and does not involve a safety issue. Enclosed is a check for $1,200.00 to cover the amount of fees required.

8212210130 821210 PDR ADOCK 05000364 P PDR

  • ^ '

Mr. S. A. Varga December 10, 1982 ictor, Nuclear Reactor Regulation Page 2

5. Nuclear Regulatory Commission In accordance with 10 CFR 50.30(c)(1)(i), three signed originals and forty (40) additional copies of the proposed change are enclosed.

Yours very truly, f fjy pk

/ h F. L. Clayton, J r.

FLCJr/GGY:jc-D31 SWORN T ND SUBSCRIBED BEFORE ME Attachments THIS / _ DAY OF, M g h , 1982, cc: Mr. R. A. Thomas Mr. G. F. Trowbridge -)

Mr. J. P. O'Reilly 4 r_.4) d). 4 Mr. E. A. Reeves 0

  • Nota ry' Public l Mr. W. H. Bradford My Commission Expires:

M oL ? -f 5

y 2 u - - 4 a & - _ "- ., & +

~

k

  • ATTACHMENT 1  !

Safety Evaluation for Proposed Change to the FNP-2 Technical Specification During a recent verification review of hydraulic snubbers installed at Joseph M. Farley Nuclear Plant - Unit 2, eight snubbers were found to i be inadvertently included in Technical Specification Table-3.7-4a. The eight snubbers are installed on the main steam piping inside the turbine building and are not required for any safety-related function. Since

, only safety-related hydraulic snubbers are to be included in Technical Specification Table 3.7-4a, these snubbers should be deleted.

Alabama Power Company respectfully requests the proposed technical specification change contained in Attachment 2. This proposed change is

administrative in nature and does not involve an unreviewed safety i question as defined by 10 CFR 50.59.