Monthly Operating Rept for June 1994 for Monticello Nuclear Generating Plant.W/940713 Lr
ML20070F285
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 06/30/1994
From: Richard Anderson, Paustian H
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9407180268
Download: ML20070F285 (5)


Text

'

Northem States Power Company 414 Nicollet Mall Minneapolis Minnesota 55401 1927 Telephone (612) 330-5500 July 13, 1994 Monticello Technical Specifications Section 6.7.A.3 US Nuclear Regulatory Commission Attn Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Monthly Operating Report June. 1994 Attached is the Monthly operating Report for June, 1994 for the Monticello Nuclear Generating Plant.

7"hekk N

Roger O Anderson Director Licensing and Management Issues c

Director, Office of Resource Management Regional Administrator-III, NRC NRR Project Manager, NRC NRC Resident Inspector State Of Minnasota - Kris Sanda Attachment 3 i' '

A v v v v -l 9407180268 940630 i)

PDR ADOCK 05000263 R

FDR

~

OPERATING DATA REPORT DOCKET NO.

50-263 DATE 7-1-94 COMPLETED BY H. H.

Paustian TELEPHONE 612/295-5151 OPERATING STATUS

] Notes

)

1.-Unit Name :

Monticello

]

]

2. Reporting period:

JUNE

]

]

3. Licensed Thermal Power (MWt) :

1670

]

]

4. Nameplate Rating (Gross MWe) :

569

]

]

5. Design Electrical Rating (Net MWe):

545.4

]

]

6. Maximum Dependable Capacity (Gross MWe) :
7. Maximum Dependable Capacity (Net MWe):

--564

]

]

536

]

]

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level To Which Restricted, If Any (Net MWe):

N/A

10. Reasons For Restrictions, If Any: __N/A THIS MONTH YR.-TO-DATE CUMULATIVE
11. Hours In Reporting Period 720 4343 201624

-12. Number Of Hours Reactor Was Critical 600.7 4181.2 163556.9

13. Reactor Reserve Shutdown Hours 0.0 0.0 940.7
14. Hours Generator On-Line 577.9 4148.3 160749.0
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 955397 6897655 248162435
17. Gross Electrical Energy Generated (MWH) 319217 2333914 83888577
18. Net Electrical Energy Generated (MWH) 302891 2244266 80263059
19. Unit Service Factor 80.3%

95.5%

79.7%

20. Unit Availability Factor 80.3%

95.5%

79.7%

21. Unit Capacity Factor (Using MDC Net) 78.5%

96.4%

74.3%

22. Unit Capacity Factor (Using DER Net) 77.1%

94.7%

73.0%

23. Unit Forced Outage Rate 19.7%

4.5%

3.6%

2 4 '. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each)

Refueling Outage - 9/15/94 - 39 days
25. If Shut Down At End Of Report Period, Estimated Date Of Startup:N/A
26. Units In Test Status (Prior to Commercial Operation) : N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

=

9 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-263 UNIT Monticello DATE 7-1-94 COMPLETED BY H. H.

Paustian TELEPHONE 612/295-5151 MONTH OF JUNE DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER' LEVEL (MWe-Net)

(MWe-Net) 1 536.

17 536.

2 537.

18 534.

3 535.

19 530.

i 4

516.

20 532.

5

-13.

21 532.

6

-7.

22 531.

7

-5.

23 532.

8

-5.

24 529.

l 9

-7.

25 530.

10

-1.

26 528.

i 11 437.

27 531.

12 530.

28 531.

13 535.

29 528.

14 532.

30 533.

15 532.

16 533.

4 INSTRUCTIONS

?

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-263 DATE 7-1-94 COMPLETED BY H. H.

Paustian TELEPHONE 612/295-5151 MONTH JUN 06-01-94 to Powcr operation.

06-04-94 06-04-94 Lightning strike damaged offgas recombiner system which to resulted in a reactor scram on low condenser vacuum.

06-06-94 06-06-94 Feedwater drain cooler leaks necessitated entering cold to shutdown.

This required installation of the level system 06-10-94 reference leg backfill modification.

06-10-94 to Power operation.

06-30-94 i

b l

Note: Power operation defined as essentially 100% of

{

rated power except for weekend load drops for i

specified surveillance testing.

l 1

l l

4 UNIT SIRTfDOWNS AND POWER REDUCTIONS DOCKET NO.

50-263 UNIT NAME l onticetto DATE 7-01-94 COMPLETED BY H. H. Paustian REPORT MONTil June TELEPilONE [612/295-5151 _ T No.

Date Duration Peason Method LER System Comp.

Cause & Corrective Ty(pe (hours)

(2) of No.

bde Code Action to 1)

Shutdown (4)

(5)

Prevent Recurrence (3) 4 06-04-94 F

25.4 A

3 94-004 WF PT Lightning strike damaged offgas system and subsequently caused reactor scram on loss of Condenser Vacuum.

5 06-06-94 F

116.7 H

1 N/A SJ IDC Tube leaks prevented startup after scram recov-ery.

Cold shutdown necessitated level system relerence leg backfill installation per NRC req.

l l

1 2

3 4

F: Forced Reason:

Method:

Draft IEEE Standard S: Scheduled A-Equipment Failure (Explain) 1-Manual 805-1984(P805-D5)

B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram 5

D-Regulator Restriction 4-Other (Explain)

IEEE Standard 803A-1983 E-Operator Training & License Examination F-Administrative C-Operational Error (Explain)

Il-Other (Explain) t