Notifies That Required Audit & Insp of Fire Protection & Loss Prevention Program Will Be Completed by 830917
ML20070E430
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 12/14/1982
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: Adensam E
Office of Nuclear Reactor Regulation
References
NUDOCS 8212170259
Download: ML20070E430 (1)


Text

'~~

TENNESSEE VALLEY AUTHORITY CH ATTANOOGA. TENNESSEE 374ot 400 Chestnut Street Tower II December 14, 1982 Director of Nuclear Reactor Regulation Attention:

Ms. E. Adensam, Chief Licensing Branch No. 4 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Ms. Adensam:

In the Matter of

)

Docket Nos. 50-327 Tennessee Valley Authority

)

50-328 The technical specifications for unit 1 and unit 2 of our Sequoyah Nuclear Plant (6.5.2.8.i) require that "an inspection and audit of the fire protection and loss prevention program shall be performed by an outside qualified fire consultant at intervals no greater than 3 years." The full power license for unit 1 of Sequoyah was received on September 17, 1980.

Therefore, the required audit and inspection will be completed no later than September 17, 1983 If possible, we plan to perform the inspection and audit for unit 2 at Sequoyah in conjunction with the unit 1 inspection and audit.

If you have any questions concerning this matter, please get in touch with J. E. Wills at FTS 858-2683 Very truly yours, TENNESSEE VALLEY AUTHORITY L. M. Mills, nager Nuclear Licensing i

Sworn t d subscribed be ore me day or b 1982 thi auMe W 4H12

~

l Notary'Public My Consnission Expires "5 QW cc:

U.S. Nuclear Regulatory Commission Region II Attn:

Mr. James P. O'Reilly, Regional Administrator 101 Marietta Street, Suite 3100 l

Atlanta, Georgia 30303 I

l 8212170259 821214 PDR ADOCK 05000327 F

PDR An Equal Opportunity Employer