t h//j ~ NortllCasi 107 Schlen Stnet, Berhn, Cr 06037 M, f Utilitics System s,,13,,, cuno s.mc, company P.O. Ibx 270 Ilartford, Cr 06141-0270 (203) 665-5000 July 8, 1994 Docket No. 50-423 B14888 Re:
10CFR50.90 U.S.
Nuclear Regulatory Commission Attention:
Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station, Unit No. 3 Request for Additional Information Proposed Revision to Technical Specifications Emergency Diesel Generator Fuel Oil Storage Capacity (TAC No. M87864)
In a letter dated September 30, 1993,m Northeast Nuclear Energy company (NNECO) transmitted a license amendment request that included changes to the Millstone Unit No. 3 Technical Specifications related to the emergency diesel generator (EDG) fuel oil storage capacity.
Specifically, the proposed changes will increase the volume of fuel oil required to be stored in the EDG day tank and clarify the bases for the EDG fuel oil storage tank and day tank minimum fuel oil requirements.
In a letter dated April 7, 1994,A the NRC requested additional information pertaining to our license amendment request dated September 30, 1993.
A meeting was held with the NRC Staff in the NRC's offices in Rockville, Maryland on June 22, 1994, to discuss the Staff's questions concerning the EDG fuel oil storage capacity.
The attached responses to the NRC's question; reiterate the responses provided at the meeting.
We believe the above information, coupled with the information provided in our September 30,
- 1993, submittal, provides a
complete basis for approval of the requested amendment.
Should (1)
J.
F.
Opeka letter to the U.S.
Nuclear Regulatory Commission, " Proposed Revision to Technical Specifications, Emergency Diesel Generator Fuel Oil Storage Capacity," dated September 30, 1993.
(2)
V.
L.
Rooney letter to J.
F.
Opeka, " Request for Additional
-Information (TAC No. M87864)," dated April 7, 1994.
t i '. t.
u..
gy 71 3
P
U.S. Nuclear Regulatory Commission B14888/Page 2 July 8, 1994 the Staff require any additional information, please contact Mr. R.
G. Joshi at (203) 665-3844.
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY h}1 L-
~
J.
F.
Opekh V
Executive Vice President cc:
T. T. Martin, Region I Administrator V.
L. Rooney, NRC Project Manager, Millstone Unit No. 3 P.
D.
Swetland, Senior Resident Inspector, Millstone Unit Nos.
1, 2, and 3 Mr. Kevin T.A. McCarthy, Director Monitoring and Radiation Division Department of Environmental Protection 79 Elm Street P.O. Box 5066 Hartford, CT 06102-5066 Subscribe and sworn to before me thi day of hn thf f, 1994