ML20070E391
| ML20070E391 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 12/13/1982 |
| From: | Mills L TENNESSEE VALLEY AUTHORITY |
| To: | Adensam E Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8212170239 | |
| Download: ML20070E391 (1) | |
Text
~k
~
TENNESSEE VALLEY AUTHORITY CH ATTANOOGA. TENNESSEE 374ol 400 Chestnut Street Tower II December 13, 1982 Director of Nuclear Reactor Regulation Attention:
Ms. E. Adensam, Chief Licensing Branch No. 4 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Ms. Adensam:
In the Matter of
)
. Docket Nos. 50-327 Tennessee Valley Authority
)
50-328 My September 17, 1982 letter to H. R. Denton (TVA-SQN-TS-37) transmitted the Reload Safety Evaluation (RSE) for Sequoyah Nuclear Plar.t unit 1, cycle 2 operations. Included in the RSE wore associated technical specifications. As a result of NRC questions, a recent change in NRC position, and to prevent delay of NRC approval of the reload license application, we request that the proposed change in the technical specification for the containment ventilation system (TS 3.6.1.9) be withdrawn from consideration at this time.
If you have any questions concerning this matter, please get in touch with J. E. Wills at FTS 858-2683 Very truly yours, TENNESSEE VALLEY AUTHORITY 1.
L. M. Mills, nager Nuclear Licensing Swornpo d subsc d before me 4
1982 this /
day of
[NotgyPublic s
My' Commission Expires 7/ 5 Ohf l
/ /
cc:
U.S. Nuclear Regulatory Commission Region II Attn:
Mr. James P. O'Reilly Regional Administrator 101 Marietta Street, Suite 3 W Atlanta, Georgia 30303 9212170239 821213 PDR ADOCK 05000327 P
PDR An Equal Opportunity Emp; oyer
.,.