J w-F y
JOSEPH M. FARLEY NUCLEAR PLANT l
UNIT 1 NARRATIVE
SUMMARY
OF OPERATIONS NOVEMBER, 1982 In the month of November there were no unit shutdowns.
The following safety-related maintenance was performed in the month-of November:
1.
Performed miscellaneous maintenance on diesel generators.
2.
Repacked #1 River Water pump.
l 1
J 4
i 8212170207 821213
+
PDR ADOCK 05000348 R
c
.i
.s O
V OPERATING DATA REPORT DOCKET NO. 50-348 DATE 12-04-82 COMPLETED BY W.G.Hairston,III TELEPHONE (205)899-5156 OPERAT1NG STATUS
- 1. Unit Naane:
Joseph M. Farley - Unit 1 Notes November, 1982
- 1) Cumulative data since
- 2. Reportang Pened.
2652 12/01/77, date of
- 3. Licensed Thermal Power (MWt):
860 commercial operation.
- 4.. Nameplate Rating (Gross MWe):
829
- 5. Design Electncal Rating (Net MWe):
844.6
- 6. Maximum Dependable Capacity (Gross MWe):
803.6
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A
- 9. Power Levello Which Restricted,if Any (Net MWe):
N/A
- 10. Reasons For Restrictions,if Any:
N/A n
This Month Yr..to-Date Cumt.iatise 720 8,016 43,824
- 11. Hours In Reporting Period 720 6,429.2 27,411
- 12. Number Of flours Reactor Was Critical
- 13. Reactor Reserve Shutdown flours 0
122.5 3.614.5
- 14. Ilours Generator On.Line 720 6,207.3 26.537
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 1.909,130 15,688,181 66,633,092
- 17. Gross Electrical Energy Generated (MWH) 612d10_ _,
4.946,450 21.183.402
- 18. Net Electrical Energy Generated (MWil) 582,262 4,657,356 19,881,080 l
- 19. Unit Service Factor 100.0 77.4 60.6 100.0 77.4 60.6 20 Unit Availability Factor
- 21. Unit Capacity Factor (Using MDC Net) 100.6 72.3 56.5 97.6 70.1 54.7
- 22. Unit Capacity Factor (Using DER Net) 0.0 22.3 18.6
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Each):
l Refueline Outace: January 15. 1983: Annroximately 11 weeks
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
N/A
- 26. Units in Test Status tPrior to Commercial Operation):
Forecast Achie,ed INITI \\ L CRIIICA LITY 8/06/77 8/09/77 gj INIIIAL ELECTRICITY 8/20/77 8/18/77 CO\\l\\lERCI AL OPERATION 12/01/77 12/01/77 j
i (9/77) l
~
- +
m.._
DOCKET No. 50-348 UNIT T
1 DATI 12/04/82 h
COS!PLETED BY W. G. Hairston, III TELEPl!ONE (205) 899-5156 i
November 510NTl!
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (5tWe-Net)
(SIWE Net)
[,
37 811 807 2
802 IS 806 802 807 3
39 4
810 20 806
~
813-21 805 5
- - 6 22 806 817 817 806 7
23 g
814 24 807 9
25 812' 812 10 812 26 808 810 804 II 27 806 800 g2 805 814
- 9 13 800 t4 91s 30 816 35 3g 16 814 INSTitUCIlON5 On this fonn
- r. list the svenge daily unit power !cielin MWe Net for esch d:y in the reparting inonth. Compute io
, the neare:t whole nesswat:.
(9/77) 1
~=
-aw.
- = = +
(
(
d UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-348 UNIT NAhlE J.M.Farley - Unit 1 DATE 12/04/82 COMPLETED By W.G.Hairston. III REPORT MONTil November. 1982 TELEPilONE (205)899-5156 ~
We t.o E E
e ci N.. '
Date E.
'5 T5U
l Cause & Correceive 4
3.3 0
.g g x Event 5,3 gu3 Action so 3 i3 j Repor: #
v) U Prcvent Recurrence oO E
g b
i l
NO UNIT SHU FDOWN 3 OR POWIR REIIUCTION:
IN NOVEMBER, 1982.
t i
I I
2 3
4 F: Forced Reason:
Method:
Exhibit G. instructions S; Ssheduled A-Equipment Failure (Explain) 1 Manual for Preparation of Data Il Maintenance of Test 2 Manual Scrain.
Entry Sheets for I.icensee C Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG-D Regulatmy Restriction 4 Other (Esplain) 0161)
E-Operator Training & IJcense Examination F Adminisisalive 5
G-Opes ational Liror (Explain)
Exhibis 1 Same Source 19/77) 11 Othes (E xplain) 4
s a
p i
\\
4 JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE
SUMMARY
OF OPERATIONS NOVEMBER, 1982 In the month of November there were no unit :.hutdowns.
The following safety-related maintenance was performed in the month of November:
1.
Performed miscellaneous maintenance on diesel generators.
2.
Repacked #1 River Water pump.
\\
.-Q A
5*
Y
- o a
I
' 9u4 ' # s
(
7, ;
9
'\\
A-4 s
V
_;]
s a
t 1
(
OPERATING DATA REPORT DOCKET NO. 50-348 DATE 12-04-82 COhlPLETED BY W.G.Hairston,III TELEPilONE (205)899-5156 OPERATING ST ATUS Notes Joseph M. Farley - Unit 1
- 1. Unit Name:
November, 1982
- 1) Cumulative data since
- 2. Reporting Period:
12/01/77, date of 2652
- 3. Licensed Thermal Power (SIWt):
commercial operation.
860
- 4. Namentate Rating (Gross htWe):
829
- 5. Design Electrical Rating (Net blWe):
844.6
- 6. Slaximum Dependable Capacity (Gross htWe):
803.6
- 7. blaximum Dependable Capacity (Net SIWE):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Gise Reasons:
N/A N/A
- 9. Power Level To Which Restricted,If Any (Net SIWE):
- 10. Reasons For Restrictions,If Any:
H/A k
Yr..to.Date Cur'nufatise This hionth 720 8,016 43,824 i1. Ilours An Reporting P-6od no 6,429.2 27.411
- 12. Niamber Of Iloun Re...u. 'lls Critical 0
122.5 3.614.5
- 13. Reactor Resene Shutdown licurs
- 14. Ilours Generator On Line 720 6,207.3 26.537 0
0 0
- 15. Unit Reserve Shordown 4: curs 1.309.130 15,688,181 66,633,092
- 16. Gross Thermal Energy Genes ited (MWif)
~
- 17. Gross Electrical Energy Gene'tated (h!Wil) 612 210 4.946_.450 21.183.402 1
582,262 4,657,356 19,881,080
- 18. Net Electrical Energy Generated (htWH) 100.0 77.4 60.6
- 19. Unit Senice Factor 100.0 77.4 60.6
- 20. Unit Asailability Factor 72.3 56.5 100.6
- 21. Unit Capacity Factor (Using SIDC Net)
- 22. Unit Capacity Factor (Using DER Net)
_ 97.6 70.1 54.7 0.0 22.3 18.6 lt Unit Forced Outage Rate
- 24. Shutdowns Scheduled Oser Next 6 hionths (Type. Date. and Duration of Eacht:
Refueling Outage: January IL 1983: Aptroximately 11 weeks 1
N/A
- 25. If Shut Down At End Of Report Period.Estima;ed Date of Staettyp:
- 26. Units In Test Status (Prior to Commercial Optrationi:
Forecast Achieved INITI$ L CRITICALITY
'\\
8/06/77 8/09/77 8/20/77 8/18/77
(
~
INITIA L ELECTR! CITY COMMERCI A L OPERATION 12/01/77 12/01/77 s
i (u/77)
. 9
.. TG DOC KJ.T.NO.
50-348
[.' '
UNIT I
,I L
i 4
oA7g 12/04/82
.i COMPLETEdBY W. G. Hairston, III
(
TELEPl!0NEr (20i/899-5156 November MOfGli DAY AVERAGi~ DAILY POWEit LEVE'. "
DAY
- AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe Net) 811 807 37 g,
802 gg R06 2
807 802 g9 3
4' 810 20 806 813 21 805
_a t
5 806 817 22
- 6 806 817 23 7
814 24 807 g
812'
[
812 25 9
10 812 26 808 804 810 p
, ' gg 800 806
,j 12 805 814 29 13 800 34 ais 30 gs 3g 816 814-16 INSTRUCHONS On this format. list the svenge daily umt power levelin MWe Net for each d:y in the reporting month. Compute to
, the neare:t whole nesswast.
(907)
.c
~
~
',,{'
em 50-348 DOCKET NO. J.M.Farley - Unit 1 UNIT SilOTDOWNS AND POWER REDUC 110NS UNIT N AME DATE 12/04/82 W.G.Hairston, III COMPLETED BY REPORT MONT}i No.rn=her - 1982 TELEPHONE (205)899-5156 3
-c e
c.
3:
Cause d (orrective h
Thf LiNENI E 1
'I u.
Date
-eg
,3.; z Event ua
- o. 3 Action to
$0 0
Pacvent Recurrence
$6 sE j di j Report
- a d
t 6
NO UNIT SIIU CDOWN 3 OR POW?R REDUCTION:; IN NOVEMBER, 1982.
i l
l 2
3 4
F: Forced Reason:
Method:
Exhibit G. instructions 1-Manual for Prepasation of Data S: Scheduled A Fquipsnent Failure (Explain)
B Maintenance ci Test 2 Manual Scrain.
Entry Slicets for Licensee C Refuchng 3 Autonutic Scram.
Event Repml(LER) File (NUREG-t D Regulatosy Restriction 4 Other (Emplain) 0161) l E-Operator Training & license Examination 5
f F Adsninistr.stive Exinbit I. Same Source t
G Ope ational Leror(Emplain)
(9/77) 11 Otbei (E xpl.iin)