J w-F y

JOSEPH M. FARLEY NUCLEAR PLANT l

UNIT 1 NARRATIVE

SUMMARY

OF OPERATIONS NOVEMBER, 1982 In the month of November there were no unit shutdowns.

The following safety-related maintenance was performed in the month-of November:

1.

Performed miscellaneous maintenance on diesel generators.

2.

Repacked #1 River Water pump.

l 1

J 4

i 8212170207 821213

+

PDR ADOCK 05000348 R

PDR

c

.i

.s O

V OPERATING DATA REPORT DOCKET NO. 50-348 DATE 12-04-82 COMPLETED BY W.G.Hairston,III TELEPHONE (205)899-5156 OPERAT1NG STATUS

1. Unit Naane:

Joseph M. Farley - Unit 1 Notes November, 1982

1) Cumulative data since
2. Reportang Pened.

2652 12/01/77, date of

3. Licensed Thermal Power (MWt):

860 commercial operation.

4.. Nameplate Rating (Gross MWe):

829

5. Design Electncal Rating (Net MWe):

844.6

6. Maximum Dependable Capacity (Gross MWe):

803.6

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

N/A

9. Power Levello Which Restricted,if Any (Net MWe):

N/A

10. Reasons For Restrictions,if Any:

N/A n

This Month Yr..to-Date Cumt.iatise 720 8,016 43,824

11. Hours In Reporting Period 720 6,429.2 27,411
12. Number Of flours Reactor Was Critical
13. Reactor Reserve Shutdown flours 0

122.5 3.614.5

14. Ilours Generator On.Line 720 6,207.3 26.537
15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 1.909,130 15,688,181 66,633,092
17. Gross Electrical Energy Generated (MWH) 612d10_ _,

4.946,450 21.183.402

18. Net Electrical Energy Generated (MWil) 582,262 4,657,356 19,881,080 l
19. Unit Service Factor 100.0 77.4 60.6 100.0 77.4 60.6 20 Unit Availability Factor
21. Unit Capacity Factor (Using MDC Net) 100.6 72.3 56.5 97.6 70.1 54.7
22. Unit Capacity Factor (Using DER Net) 0.0 22.3 18.6
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Each):

l Refueline Outace: January 15. 1983: Annroximately 11 weeks

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

N/A

26. Units in Test Status tPrior to Commercial Operation):

Forecast Achie,ed INITI \\ L CRIIICA LITY 8/06/77 8/09/77 gj INIIIAL ELECTRICITY 8/20/77 8/18/77 CO\\l\\lERCI AL OPERATION 12/01/77 12/01/77 j

i (9/77) l

~

+

m.._

DOCKET No. 50-348 UNIT T

1 DATI 12/04/82 h

COS!PLETED BY W. G. Hairston, III TELEPl!ONE (205) 899-5156 i

November 510NTl!

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (5tWe-Net)

(SIWE Net)

[,

37 811 807 2

802 IS 806 802 807 3

39 4

810 20 806

~

813-21 805 5

  • - 6 22 806 817 817 806 7

23 g

814 24 807 9

25 812' 812 10 812 26 808 810 804 II 27 806 800 g2 805 814

9 13 800 t4 91s 30 816 35 3g 16 814 INSTitUCIlON5 On this fonn
r. list the svenge daily unit power !cielin MWe Net for esch d:y in the reparting inonth. Compute io

, the neare:t whole nesswat:.

(9/77) 1

~=

-aw.

- = = +

(

(

d UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-348 UNIT NAhlE J.M.Farley - Unit 1 DATE 12/04/82 COMPLETED By W.G.Hairston. III REPORT MONTil November. 1982 TELEPilONE (205)899-5156 ~

We t.o E E

e ci N.. '

Date E.

'5 T5U

l Cause & Correceive 4

3.3 0

.g g x Event 5,3 gu3 Action so 3 i3 j Repor: #

v) U Prcvent Recurrence oO E

g b

i l

NO UNIT SHU FDOWN 3 OR POWIR REIIUCTION:

IN NOVEMBER, 1982.

t i

I I

2 3

4 F: Forced Reason:

Method:

Exhibit G. instructions S; Ssheduled A-Equipment Failure (Explain) 1 Manual for Preparation of Data Il Maintenance of Test 2 Manual Scrain.

Entry Sheets for I.icensee C Refueling 3 Automatic Scram.

Event Report (LER) File (NUREG-D Regulatmy Restriction 4 Other (Esplain) 0161)

E-Operator Training & IJcense Examination F Adminisisalive 5

G-Opes ational Liror (Explain)

Exhibis 1 Same Source 19/77) 11 Othes (E xplain) 4

s a

p i

\\

4 JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE

SUMMARY

OF OPERATIONS NOVEMBER, 1982 In the month of November there were no unit :.hutdowns.

The following safety-related maintenance was performed in the month of November:

1.

Performed miscellaneous maintenance on diesel generators.

2.

Repacked #1 River Water pump.

\\

.-Q A

5*

Y

- o a

I

' 9u4 ' # s

(

7, ;

9

'\\

A-4 s

V

_;]

s a

t 1

(

OPERATING DATA REPORT DOCKET NO. 50-348 DATE 12-04-82 COhlPLETED BY W.G.Hairston,III TELEPilONE (205)899-5156 OPERATING ST ATUS Notes Joseph M. Farley - Unit 1

1. Unit Name:

November, 1982

1) Cumulative data since
2. Reporting Period:

12/01/77, date of 2652

3. Licensed Thermal Power (SIWt):

commercial operation.

860

4. Namentate Rating (Gross htWe):

829

5. Design Electrical Rating (Net blWe):

844.6

6. Slaximum Dependable Capacity (Gross htWe):

803.6

7. blaximum Dependable Capacity (Net SIWE):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Gise Reasons:

N/A N/A

9. Power Level To Which Restricted,If Any (Net SIWE):
10. Reasons For Restrictions,If Any:

H/A k

Yr..to.Date Cur'nufatise This hionth 720 8,016 43,824 i1. Ilours An Reporting P-6od no 6,429.2 27.411

12. Niamber Of Iloun Re...u. 'lls Critical 0

122.5 3.614.5

13. Reactor Resene Shutdown licurs
14. Ilours Generator On Line 720 6,207.3 26.537 0

0 0

15. Unit Reserve Shordown 4: curs 1.309.130 15,688,181 66,633,092
16. Gross Thermal Energy Genes ited (MWif)

~

17. Gross Electrical Energy Gene'tated (h!Wil) 612 210 4.946_.450 21.183.402 1

582,262 4,657,356 19,881,080

18. Net Electrical Energy Generated (htWH) 100.0 77.4 60.6
19. Unit Senice Factor 100.0 77.4 60.6
20. Unit Asailability Factor 72.3 56.5 100.6
21. Unit Capacity Factor (Using SIDC Net)
22. Unit Capacity Factor (Using DER Net)

_ 97.6 70.1 54.7 0.0 22.3 18.6 lt Unit Forced Outage Rate

24. Shutdowns Scheduled Oser Next 6 hionths (Type. Date. and Duration of Eacht:

Refueling Outage: January IL 1983: Aptroximately 11 weeks 1

N/A

25. If Shut Down At End Of Report Period.Estima;ed Date of Staettyp:
26. Units In Test Status (Prior to Commercial Optrationi:

Forecast Achieved INITI$ L CRITICALITY

'\\

8/06/77 8/09/77 8/20/77 8/18/77

(

~

INITIA L ELECTR! CITY COMMERCI A L OPERATION 12/01/77 12/01/77 s

i (u/77)

. 9

.. TG DOC KJ.T.NO.

50-348

[.' '

UNIT I

,I L

i 4

oA7g 12/04/82

.i COMPLETEdBY W. G. Hairston, III

(

TELEPl!0NEr (20i/899-5156 November MOfGli DAY AVERAGi~ DAILY POWEit LEVE'. "

DAY

  • AVERAGE DAILY POWER LEVEL (MWe Net)

(MWe Net) 811 807 37 g,

802 gg R06 2

807 802 g9 3

4' 810 20 806 813 21 805

_a t

5 806 817 22

  • 6 806 817 23 7

814 24 807 g

812'

[

812 25 9

10 812 26 808 804 810 p

, ' gg 800 806

,j 12 805 814 29 13 800 34 ais 30 gs 3g 816 814-16 INSTRUCHONS On this format. list the svenge daily umt power levelin MWe Net for each d:y in the reporting month. Compute to

, the neare:t whole nesswast.

(907)

.c

~

~

',,{'

em 50-348 DOCKET NO. J.M.Farley - Unit 1 UNIT SilOTDOWNS AND POWER REDUC 110NS UNIT N AME DATE 12/04/82 W.G.Hairston, III COMPLETED BY REPORT MONT}i No.rn=her - 1982 TELEPHONE (205)899-5156 3

-c e

c.

3:

Cause d (orrective h

Thf LiNENI E 1

'I u.

Date

-eg

,3.; z Event ua

o. 3 Action to

$0 0

Pacvent Recurrence

$6 sE j di j Report

  • a d

t 6

NO UNIT SIIU CDOWN 3 OR POW?R REDUCTION:; IN NOVEMBER, 1982.

i l

l 2

3 4

F: Forced Reason:

Method:

Exhibit G. instructions 1-Manual for Prepasation of Data S: Scheduled A Fquipsnent Failure (Explain)

B Maintenance ci Test 2 Manual Scrain.

Entry Slicets for Licensee C Refuchng 3 Autonutic Scram.

Event Repml(LER) File (NUREG-t D Regulatosy Restriction 4 Other (Emplain) 0161) l E-Operator Training & license Examination 5

f F Adsninistr.stive Exinbit I. Same Source t

G Ope ational Leror(Emplain)

(9/77) 11 Otbei (E xpl.iin)