MONTHYEARML20217N3171999-10-19019 October 1999 Rev 1,change 024-01-0 to OP-1903.011, Emergency Response Notifications ML20217J7641999-10-0505 October 1999 Rev 1 to Unit 1 Technical Requirement Manual, Replacing Index Page ML20216G0881999-09-19019 September 1999 Proposed Tech Specs Pages,Changing TS 4.18.5.a.9 & Associated Bases for One Cycle of Operation Through End of Cycle 16 for Suppl Use of OTSG Repair Roll Technology ML20212F5851999-09-17017 September 1999 Proposed Tech Specs Pages,Changing TS by Revising Curie Limits for Radioactive Gas Storage Tanks ML20216G0721999-09-17017 September 1999 Proposed Tech Specs,Revising Once Through SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Volumetric Integranular Attack ML20211P0061999-09-0707 September 1999 Proposed TS in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria ML20211B3291999-08-19019 August 1999 Proposed TS 4.18.3.a.4 Clarification Supporting Tube End Cracking Alternative Repair Criteria ML20211C4101999-08-18018 August 1999 Proposed Tech Specs Removing Requiremets for Tube Repair (Sleeving) & Clarifying Requirements for Preservice & ISI of Tubes to Facilitate Replacement of Original SGs ML20211C1701999-08-18018 August 1999 Proposed Tech Specs Revising ESAS Low RCS Pressure Setpoint to Ensure That TS Adequately Bounds Safety Analysis ML20210N5541999-08-0404 August 1999 Rev 28,Permanent Change 4 to OP-1903.061, Communication Equipment Test ML20210N5571999-08-0404 August 1999 Rev 23,Permanent Change 5 to OP-1903.011, Emergency Response/Notifications ML20210K5121999-07-29029 July 1999 Proposed Tech Specs,Revising Requirements Associated with Plant Station Batteries & DC Sources to 125 Vdc Switchyard Distribution Sys ML20210K3571999-07-29029 July 1999 Proposed Tech Specs Revising SRs Pertaining to ISI Requirements for SG Tube Circumferential Cracking at top-of-tubesheet During 2P99 Planned mid-cycle Outage ML20209H5811999-07-14014 July 1999 Proposed Tech Specs Revising RB Structural Integrity Requirements Re ISI Reporting for Containment Structures, Tendons & Anchorages ML20209H8701999-07-14014 July 1999 Proposed Tech Specs 6.2.2 & 6.2.2.h,replacing Functional Description of Operations Staff Middle Manager with Ref to Functional Description Assistant Operations Manager & Revising TS Table 6.2-1 Item 5 & TS 6.2.2.f ML20209H9721999-07-14014 July 1999 Proposed Tech Specs Changes for Elimination of Programmatic Requirements Associated with PASS & Regulatory Relief from PASS Requirements of NUREG-0737 & RG 1.97 ML20195D2371999-06-0101 June 1999 Proposed Tech Specs Re Surveillance Requirements & Applicable Bases Relevant to ISI Requirements for Portions of once-through SG (OTSG) Tubes Adjacent to Primary Cladding Region of tube-to Tubesheet Roll ML20206T2651999-05-14014 May 1999 Proposed Tech Specs Revising SG Tubing SRs ML20206Q1281999-05-10010 May 1999 Proposed Tech Specs Bases,Page B 2-2,discussing Guidance to Be Used When Applying Later Editions & Addendas of ASME Code to RCS Components ML20206J8021999-05-0404 May 1999 PC-03 to Procedure/Work Plan 1904-002, Offsite Dose Projections Rdacs Computer Method ML20205P6931999-04-0909 April 1999 Proposed Tech Specs Change,Adding Specification 3.0.6 & Associated Bases to ANO-2 ML20205P3731999-04-0909 April 1999 Revised Proposed TS Page 5-1 Re Design Features Conversion ML20205P6431999-04-0909 April 1999 Revised Proposed Technical Requirement Manual Pages ML20205P4081999-04-0909 April 1999 Proposed Tech Specs Changes,Revising Reactor Bldg Structural Integrity Requirements ML20205P6291999-04-0909 April 1999 Proposed Tech Specs Changes,Revising Battery Requirements ML20207C0631999-02-25025 February 1999 Proposed Tech Specs Change Revising Action 2 Associated with Table 3.3-1, Reactor Protective Instrumentation. Change Adds Footnote to Action 2 Allowing Startup with Functional Units Associated with Channel D Excore Inoperable ML20207M7561999-02-24024 February 1999 Proposed Tech Specs,Allowing Startup & Continued Operation of Plant with Channel D Detector Until New Detector Is Installed During mid-cycle Outage Scheduled for Nov 1999 ML20198K1341998-12-17017 December 1998 Corrected Tech Specs Pages to 980629 Application for Amend to License NPF-6 ML20198A3661998-12-0808 December 1998 Proposed Tech Specs B3/4 6-3 & B3/4 6-4,deleting All Requirements Associated with Sodium H Addition Sys & Adding New Requirements for Trisodium Phosphate to Be Stored in Containers Located on Floor of Cb ML20196B4381998-11-24024 November 1998 Proposed Tech Specs Pages,Changing Administrative Controls Section to Implement Consolidated QA Plan Manual & Clarifying Responsibilities on STA Position on Shift ML20196C9761998-11-24024 November 1998 Rev 1 to Unit 2 Technical Requirements Manual ML20154D6681998-10-0101 October 1998 Rev 28 to Procedure/Work Plan 1904.002, Offsite Dose Projections Rdacs Computer Method ML20153D8491998-09-17017 September 1998 Proposed Tech Specs 2.2.1,3.3.1.1 & 3.3.2.1 Re Operating Bypass Setpoint ML20153H1651998-08-12012 August 1998 Rev 0 to ANO Units 1 & 2 Technical Requirements Manual ML20236Y5251998-08-0606 August 1998 Proposed Tech Specs Section 3.1.3.2,revising Action Requirements for CEA Position Indicator Channels ML20236Y5081998-08-0606 August 1998 Proposed Tech Specs Section 3.3.4.B Re Sodium Hydroxide Tank Limits ML20236Y5951998-08-0606 August 1998 Proposed Tech Specs,Revising Requirements Associated W/Units 1 & 2 Control Room Emergency Ventilation Sys ML20236Q2781998-07-13013 July 1998 Proposed Tech Specs Re Safety Limits & Limiting Safety Settings ML20236G6921998-06-29029 June 1998 Proposed Tech Specs,Revising TS 3.4.2 & TS 3.4.12 Re Reactor Coolant Sys Safety Valves & Low Temp Overpressure Protection ML20236G5421998-06-29029 June 1998 Proposed Tech Specs,Revising Surveillance Testing Requirements for Unit 2 Direct Current Electrical Distribution Sys ML20236G5631998-06-29029 June 1998 Proposed Tech Specs,Revising Table 3.3-4 to Provide Range of Acceptable Values for 4160 Volt Bus Loss of Voltage Values ML20236G4911998-06-29029 June 1998 Proposed Tech Specs Re MSSVs & Pressurizer Safety Valves ML20199F7211998-05-22022 May 1998 Rev 8 to Simulator Mod Control,Training Desk Guide 6.3 ML20217N6141998-04-30030 April 1998 Proposed Tech Specs 1.6.1,revising Definition of Quadrant Power Tilt ML20217M2621998-04-30030 April 1998 Proposed Tech Specs Re DG Load Rejection Testing ML20217M4871998-04-28028 April 1998 Proposed Tech Specs Changing Order of Channel Rotation During Outage for Scheduling Flexibility,While Still Requiring Rotation Schedule to Be Established for Operating Cycle ML20217P8141998-04-0101 April 1998 Proposed Tech Specs Re Upper Tubesheet Volumetric Indications to Remain in Svc for Cycle 15 ML20216J7841998-03-17017 March 1998 Proposed Tech Specs Bases Change Concerning Plant Protection Sys Matrix Logic Testing ML20203D1061998-02-18018 February 1998 Proposed Tech Specs Revising Surveillance Testing Requirements for Emergency Feedwater Sys ML20202G9771998-02-0909 February 1998 Proposed Tech Specs Pages,Allowing Use of Repair Roll Technology (Reroll) for Upper Tubesheet Region of SGs 1999-09-07
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20217N3171999-10-19019 October 1999 Rev 1,change 024-01-0 to OP-1903.011, Emergency Response Notifications ML20217J7641999-10-0505 October 1999 Rev 1 to Unit 1 Technical Requirement Manual, Replacing Index Page ML20210N5571999-08-0404 August 1999 Rev 23,Permanent Change 5 to OP-1903.011, Emergency Response/Notifications ML20210N5541999-08-0404 August 1999 Rev 28,Permanent Change 4 to OP-1903.061, Communication Equipment Test ML20206J8021999-05-0404 May 1999 PC-03 to Procedure/Work Plan 1904-002, Offsite Dose Projections Rdacs Computer Method ML20205P6431999-04-0909 April 1999 Revised Proposed Technical Requirement Manual Pages ML20196C9761998-11-24024 November 1998 Rev 1 to Unit 2 Technical Requirements Manual ML20154D6681998-10-0101 October 1998 Rev 28 to Procedure/Work Plan 1904.002, Offsite Dose Projections Rdacs Computer Method ML20153H1651998-08-12012 August 1998 Rev 0 to ANO Units 1 & 2 Technical Requirements Manual ML20199F7211998-05-22022 May 1998 Rev 8 to Simulator Mod Control,Training Desk Guide 6.3 ML20202E1611997-12-0101 December 1997 IST Program Third Ten Yr Interval Submittal. W/32 Oversize Drawings ML20211Q1221997-10-14014 October 1997 Rev 22,change 2 to OP-1903.011, Emergency Response Notifications ML20198J8081997-10-14014 October 1997 Rev 28,Permanent Change 2 to Procedure/Work Plan 1903.061, Communications Equipment Tests ML20217K3001997-08-0808 August 1997 Change PC-03,Rev 21 to Work Plan 1903.030, Evacuation ML20151K2241997-07-29029 July 1997 Change PC-01,Rev 6 to OP-1903.035, Adm Potassium Iodide ML20148T0441997-07-0101 July 1997 Change PC-01 to Rev 12 to Procedures OP-1903.067, Emergency Response Facility - Emergency Operations Facility (Eof) ML20148T0221997-07-0101 July 1997 Change AP-06 to Rev 6 to Procedure OP-1903.035, Adm Potassium Iodide ML20148T0051997-07-0101 July 1997 Change PC-01 to Rev 32 to Procedure OP-1903.060, Emergency Supplies & Equipment ML20141C5421997-06-17017 June 1997 2 to Procedure Work Plan 1903.065, Emergency Response Facility Technical Support Center (Tsc) ML20148T5391997-06-0101 June 1997 Rev 0 to Third Ten-Year Interval ISI Plan for ANO Unit 1 ML20140C0951997-03-26026 March 1997 Rev 11,Change AP-11,to OP-1903.034, Emergency Operations Facility Evacuation ML20137D9271997-03-18018 March 1997 Rev 21-04-00,Change PC-04 to OP-1903.011, Emergency Response/Notifications ML20137W3621997-03-17017 March 1997 Rev 2 to Test Procedure TR-228, Three Hour Fire Test of One and Three Hour Versawrap Raceway Fire Barrier Sys for Conduits & Cable Trays ML20115D8901996-07-10010 July 1996 Permanent Change (Pc) PC-03 to Rev 11 to OP-1903.065, Emergency Response Facility Tsc ML20107G3981996-04-17017 April 1996 Rev 4 to Procedure 1903.053, Logistical Support, Combining Procedures 1903.054 & 1903.078 in W/Procedure 1903.053 & Deleting Procedures 1903.054 & 1903.078 Completely ML20107G4231996-04-17017 April 1996 Rev 4 to Procedure 1903.078, Emergency Response Support, Deleting Procedure.Info from Procedure Incorporated Into Procedure 1903.053, Logistical Support ML20107G4011996-04-17017 April 1996 Rev 6 to Procedure 1903.054, Addl Personnel, Deleting Procedure.Pertinent Info,Instructions & Requirements from Procedure Will Be Incorporated Into Procedure 1903.053, Logistical Support ML20101E3851996-03-13013 March 1996 Rev 15 to OP-1903.062, Communication Sys OP Procedure ML20101E3571996-03-13013 March 1996 Rev 28 to OP-1903.061, Communication Equipment Test ML20101E3771996-03-13013 March 1996 Rev 8 to OP-1903.066, Emergency Response Facility Osc ML20097B2221996-02-0606 February 1996 Change AP-33 to Rev 33 to OP-1903.010, EAL Classification ML20095F9611995-12-0707 December 1995 Permanent Change (Pc) PC-02 to Rev 27 to Procedure/Work Plan OP-1904.002, Offsite Dose Projection Rdacs Computer Method ML20091K8261995-08-28028 August 1995 Change PC-1 to Rev 9 to Procedure/Work Plan 1903.067, Emergency Response Facility - Eof ML20087B6431995-08-0808 August 1995 Rev 27 to Procedure/Work Plan 1904.002, Offsite Dose Projection Rdacs Computer Method ML20086B3901995-07-0505 July 1995 Rev 9 to Procedure/Work Plan 1903.067, Emergency Response Facility - Eof ML20084U7381995-06-13013 June 1995 Page 14 of Rev 20 to Procedure/Work Plan 1903.011, Emergency Response/Notifications ML20084L9881995-05-25025 May 1995 Rev 20 to Procedure/Work Plan 1903.011, Emergency Response/ Notifications ML20097B2201995-05-16016 May 1995 Change PC-2 to Rev 31 to OP-1903.060, Emergency Supply Equipment ML20083Q2961995-05-16016 May 1995 Rev 13 to Procedure/Work Plan 1905.002, Offsite Emergency Monitoring ML20083Q3071995-05-16016 May 1995 Rev 31 to Procedure/Work Plan 1903.060, Emergency Supplies & Equipment ML20083Q2891995-05-16016 May 1995 Rev 6 to Procedure/Work Plan 1903.064, Emergency Response Facility - Cr ML20083L6171995-05-0505 May 1995 Rev 9 to Procedure/Work Plan 1903.034, EOF Evacuation ML20083L6141995-05-0505 May 1995 Rev 4 to Procedure/Work Plan 1905.031, Airborne I-131 Determination Using RM-14.HP-210 ML20083L5941995-05-0505 May 1995 Rev 5 to Procedure/Work Plan 1905.004, EOF Radiological Controls ML20082E2211995-03-31031 March 1995 Rev 1 to Procedure/Work Plan 1903.068, Emergency Response Facility - Emergency News Center ML20081K0331995-03-16016 March 1995 Rev 27 to Procedure/Work Plan 1903.061, Communications Equipment Tests ML20078R0771995-02-0909 February 1995 Rev 21 to Procedure/Work Plan 1903.030, Evacuation ML20078G8921995-01-26026 January 1995 Rev 30 to Procedure/Work Plan 1903.060, Emergency Supplies & Equipment ML20078J1101995-01-13013 January 1995 Public Version of Rev 14 to Operating Procedure 1903.062, Communication Sys Operating Procedure ML20095J6271995-01-0303 January 1995 Permanent Change (Pc) PC-01 to Rev 11 to Procedure/Work Plan OP-1903.065, Emergency Response Facility Tsc 1999-08-04
[Table view] |
Text
- - - - - - - - - - - _ - - - - -
. s
{j.' .
ARKANSAS POWER & LIGHT COMPANY
~
Arkansas Nuclear One N
RECORD OF CHANGES AND REVISIONS l FORM NO.1000.06A F5?ERGE!!CY PL Aff PROCEDURE REV. # 12 PC #
l Safety Related YES R NO O OIL SP!LL PREVEIITICII CCIITRCL A :D COL' :TERMEA5URE PLAll
']' 1903.24 REV. 2 _
' ~
,' ~5 PAGE REV PC// PAGE REV PC// PAGE REV PC// PAGE REV PC(/ PAGE REV PC//
1 2 19 2 2 2 20 2 3 2 l 4 2 1
5 2
- 6 2 1
7 2 8 2 1 9 2 10 2 11 2 12 2 13 2 -
14 2 15 2 16 2 l 17 2 1 la 2 APPROVED BY:
APPROVAL DATE *
.[!,
.: i: l '. /IL
, ,7, , , , , , REQUIRED EFFECTIVE DATE:
I ,/ (General Manager)
/
8212170025 821210 PDR ADOCK 05000313 F PDR _ _ _ _ _
1 v _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
. s
, PLANT MANUAL SECTION: PROCEDURE / WORK PLAN TITLE: NO:
EMERGENCY PLAN OIL SPILL PREVENTION CoiiTROL I erncemver & < ove rrreursetter er ut ion 7_94 l
PAGE qnc 90 i
ARKANSAS NUCLEAR ONE _arvisma CHANGE ec.3 DATE o care o w , ",
33/3a/co 6.3 Emergency Diesel Fuel Tanks, T-57 A & B and 2T57 A & B 6.3.1 The Emergency Diesel Fuel storage tanks have a capacity of -
22,500 gallons each and are located in separate under-ground vaults. These tanks maintain 100% volume at all times and are gravity fed from T-25. The tanks are equipped with vent piping. The volume of the below door elevation is sufficient to contain the oil in the event of a ruptured fuel tank.
6.3.2 Tanks T-57 A & E f' 3d the Unit 1 emergency diesel generator day tanks exclus ie y through a combination of pumps P16 A
& B. Valves for Un t 1 are lined up per OP 1104.36. Tanks 2T-57 A & B, feed the Unit 2 emergency diesel generator day tanks exclusively through a combination of pumps 2P16 A & B.
Valves for Unit 2 are lined up per OP 2104.36.
6.3.3 Each emergency tank vault has a sump which is connected to a main sump equipped with a manually operated sump pump.
In the event of a main sump overflow, the oil will be con-tained in the vault building basement area. Excess oil accumulation is alarmed by annunciators in the respective control room.
6.3.4 In the unlikely event of a tank rupture, a fuel tank alarm will sound from the vault. Operations shall immediately close valve FO-4. This action will stop the gravity feed from the Fuel Oil Storage Tank, T-25.
6.4 Diesel Generator Day Tanks, T-30 A & B and 2T30 A & B 6.4.1 The Diesel Generator Day Tanks are located in the diesel '
generator rooms. Each diesel generator room is equipped with metal containment dikes at the doors and is con-nected to the oil water drain system (OWS). Unit 1 diesel generator day tanks are mounted on the D.G. frame and have a capacity of approximately 375 gallons. Unit 2 diesel generator day tanks are located behind a retaining wall inside the D.G. rooms and have a capacity of approximately 550 gallons and are not on the frame, o.4.2 For Unit 1, transfer pcmps P-16 A & B in the underground Storage Tank Vault connect T-57 A & B to the Diesel Gen-erator Day Tanks through buried piping. For Unit 2, trans-fer pumps 2P-16 A & B in the underground Storage Tank Vault connect 2T-57 A & B to the Diesel Generator Day Tanks through buried piping. This piping was designed to ANSI B31.10 and ANO QA program requirements. Valve line up for all Diesel Generator Day Tank fills are performed per OP 1104.23.
1 i
F
, PLANT I4 ANUAL SECTION: PROCEDUREtNORK PLAN TITLE: NO: l
~ ['
l fT
]'1 -
EMERGENCY PLAN 7"CCECCE OIL SPILL PREVENTION CONTROL E CO ~ TEF Z ?.SI?"E PL/3 '"2
a- PAGE r on i~C' ~ ARKANSAS NUCLEAR ONE nEvisioN 3-
~
- oATE" e, , , , , e -
CHANGE ,,~, DATE '
, , , , n ', $ }
Page 1 of 1 ATTACHMENT 2 Oil Spill Response Team Organization and Responsibilities The purpose of the ANO Oil Spill Response Team is to minimize the consequences of an oil spill upon the environment of Lake Dardanelle. The Oil Spill Response Team shall be activated per Section 4.4.3 of this procedure. Upon activation the team shall initiate actio6 as described in Section 4.2 and Attachment 1 of this procedure. The Oil Spill Team leader shall be responsible for coor-dinating oil containment and clean up activities and reporting to the Technical Analysis Superintendent.
Call List For Oil Spill Response Team NAME PHONE Team Leader Charles Adams * '*
j Alternate Team Leader Dennis Calloway * ;*
i Members Gary Lipham o',
Tom Blakenship g *
l Al Morgan *
- i THE MATERIAL CONTAINED WITHIN THE SYMBOLS (*) IS PROPRIETARY OR PRIVATE INFORMATION.