Discusses Action Plan to Disposition Concerns Re Seismic Qualification of Instrument Tubing at facilities.Safety- Related Tubing Will Be Seismically Qualified to Meet Final Design Criteria Prior to Unit Restart
ML20070D417
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 02/27/1991
From: Wallace E
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9102280259
Download: ML20070D417 (4)


Text

... -

r

.I A

Tennesbee Va%y Authonty.1101 Ma+et Streter. Chananoega Tennessee 37432 FEB 27 B31 U.S. Nuclear Regulatory Cotanission ATTN:

Document Control Desk Washington, D.C.

20555 Centlemen:

In the Matter of

)

Docket Nos. 50-259 Tennessee Valley Authority

)

50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - ACTION PLAN TO DISPOSITION CONCERN!:

RECARDINC THE SEISMIC QUALIFICATION OF UNITS 1 AND 3 INSTRUMENT TUBINC

Reference:

TVA letter, dated January 9,1991, plans for the Return to Service of BFN Units 1 and 3 As part of the referenced lettor TVA committed to provide the NL; staf f with the action plan for dispositioning concerns regarding the seismic qualification of instrument tubing at BFN Units 1 and 3.

Enclosu'o 1 to this letter provides a summary of the concerns, a review of the U it 2 resolution, a discussion of lessons learned, and a description of how these concerns will be resolved on Unita 1 and 3.

This submittal is provided for informational purposes only. No NRC action is spee!fically requested.

A su1mnary list of commitments contained in this letter is prov.ded in.

If you have any questions, please contact Joseph E. McCarthy, Manager of Unit 3 Licensing, at (205) 7'9-3604.

Very truly yours, TENNESSEE VALLEY AUTit0RITY 1

t k

E. G Walla Mana 'r Nucl e Licensing a d Regulatory Affairs Enclosures cc:

See page 2 9102280259 91022y PDR ADOCK 05000259 P

POR ej

,.. -. ~ - -. -. -.. -.

...... -. -... ~. -.....

f-U.S. Nuclear Regulatory Comission k

j cc (Enclosures):

Ms. S. C. Black,' Dr puty Director _

Project Directoratt.11-4 U.S. Nuclear Regulatory Commission One White Flint,= North 11555 Rockville Pike, Rockville, Maryland 20852 NRC Resident Inspector

. Browns Ferry Nuclear Plant-Route 12, Box 637-Athens, Alabama 35609-2000-Mr. Thierry M. Ross,- Project Manager U.S. Nuclear Regulatory Commission One White Flint, North -

-11555 Rockville' Pike Rockville, Maryland 20857.

Mr. B. A. Wilson, Proje.t Chief U.S. Nuclear Regulatory Curunission Region-II' 101 Marietta Street, NW, Ailte - 2900 Atlanta, Georgia'.30323-a i

I

.- )

i

..)

l 4

l 1

,(

t

'. c:.. -...

c...;..,,. n.....J.

.~. -, i -.

.. a. -........,.l._...~.c

... 2 n.

a.; c.-

....a a.

. -. L -. -

_. _. ~

.~

4 ENCLOSURE 1 BROWNS FERRY NUCLEAR PLANT - UNITS 1 AND 3 INSTRUMENT TUBING CORRECTIVE ACTION PLAN The program for seismic qualification of Unit 2 and common instrument tubing-was developed to address concerns identified with the lack of design criteria for the support of tubing and for the consideration of thermal stresses.- The l

details of the Unit 2 program were submitted by TVA letter,-dated June 13, 1989.. Implementation of the program was evaluated as documented in-Inspection Reports 89-36, dated September 21, 1989, 89-44, dated i

D9cember 11, 1989, and 90-13, dated August 10, 1990.

Approval of TVA's instrument tubing program was documented in Section 2.2.3.4 of Supplement 2 to NURICM 232, Volume 3, dated January 23, 1991.

The program to resolve the instrument tubing concerns for Unit 2 restart involved the rigorous analysis of a sample of the Unit 2 and common safety related instrument tubing which wae within the Design Baseline Program Safe Shutdown Restart Boundary *. This prc, gram was sim').ar to the program which was used to noismically qualify Unit 2 and common _cmall bore piping. Generic attribstes which contributed to an overstressed condition were identified. - A subseqtent screening walkdown of the romaining tubing _was performed.-

The t @ ing which was-identified as potential outliers during the screening ravies, were further evaluated. The Unit 2 and common' tubing, which did 'not' i

.eet interim operability criteria (which was approved for one cycle of Unit 2 operation), was modified to meet the design criteria. TVA committed to modify the Unit 2 and common safety related tubing which:-

1) Was outside the safe shutdown restart boundary, or
2) Het the interim criteria, but did not meet the: final desig'n criteria :

tc, meet the final design criteria during the next Unit 2 refueling outage.

l 1

I i

l Discussion of the design baseline and verification program was'inc}uded in TVA letter, dated March'25, 1988.

i e

- 1 l

?

5 *

.-,,-<+y

.,-c--

=,=,-

y

,.,.+

e.

e.

., wre4m

,,e w

y,.-,i,w-<4y-.

,.f

, y t,

+1

,w

3. j n

p t

-y

... ~.. ~~ ~ - -. -

s I

.j Page 2 of 2 ENCLOSURE 1 (CONTINUED)

BROWNS FERRY NUCl. EAR PLANT - UNITS 1 AND-3 INSTRUMENT TUBING CORRECTIVE ACTION -PL AN Based upon the lessons learned from the Omplementation of the Unit 2 and instrument tubing program, TVA will implement a similar program on Unite 1 and 3.

TVA will perform a walkdown the Units-1 and 3 safety related instrument tubing.

This walkdown will be based on the' generic. attributes which were developed in the Unit 2 program and will use procedures and checkliste similar to the ones de<reloped for Unit 2...The use of the Unit 2 generic attributes, procedures, and checklisto for the seismic qualification of the Unite I and 3 instrument tubing la acceptable since The almilarity between the instrument ttbing installations for_ Unite 1, 2, and 3, The analyste parameterc (e.g., operating modee, seismic spectra, etc.)

~

e are the same for all three units.

Unite 1 and 3 safety related tubing will be celemi.cally; qualified to meet the final design criteria prior to the restart of each respective unit.' Interim operability criteria will not be used.

1 i

i I

i a....a.

,.. a,.. s.

... a

. -. ~. -

r l:

ENCLOSURE 2 BROWNS FERRY. NUCLEAR PLANT - UNITS-1 AND 3~

SUMMARY

OF COMMITMENTS Units 1 and 3 safety related instrument tubing will be seismically qualified to meet the final design criteria prior to the restart of each respective unit.

I i

l 1

.W,.

_