Confirms Telcon Re Emergency Facility Status Per Generic Ltr 82-10.Structure Complete & Habitable.Info Equipment Not Completely Installed,But Facility Operable
ML20070D250
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 12/08/1982
From: Beckham J
GEORGIA POWER CO.
To:
Office of Nuclear Reactor Regulation
References
GL-82-10, NUDOCS 8212150009
Download: ML20070D250 (1)


Text

Georgia Power Company 333 Pedmont Avenue Atlanta. Georg a 30308 Telephore 404 526-7020 ecember 8, 1982 Mal Ad es$

B M 545 Atlanta. Georgta 30302 Georgia Power the southem electrc system J. T. Beckham, Jr.

Vce Prescent and General Manager Nuclear Generation Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Connission Washington, D. C.

20555 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNITS 1, 2 CONFIRMATION OF TELEPHONE CONVERSATION Gentlemen:

This letter is to formally document a conversation between Mr.

R. D.

Baker and Mr.

M.

Fairtile of our respective staffs.

The subject of the survey being conducted by Mr. Fairtile was Emergency Facility Status.

The following information was provided by telephone to Mr. Fairtile:

1.

Plant Name:

Hatch Units 1 and 2 2.

Response Date to Generic Letter 82-10: June 4, 1982 Permanent Primary EOF 3.

Location: On-site 4.

Structural Type: Concrete 5.

Protection Factor: 5 6.

Date Started: 3/81 7.

Construction Status: Structure is complete.

Building is habi-able.

Not all information equipment yet installed, but facility is operable.

8.

HEPA Filter: Yes Permanent Backup EOF 9.

Location:

Between 10 and 11 miles from the site 11.

Structural Type:

Brick

11. Date Started: Existing
12. Construction Status: N/A If you have any further questions please contact this office.

Very truly yours, hf f

. T. Beckham, Jr.

MJDi;nb xc:

H. C. Nix, Jr.

J. P. O'Reilly 8212150009 321208

~

g[

Senior Resident Inspector 6

FDR ADOCK 05000321 F