ML20070D136

From kanterella
Jump to navigation Jump to search
Notifies That Inservice Pump & Valve Testing Program Upgrade Will Reflect Section Xi,Div 1,of ASME Boiler Pressure Vessel Code,Permitting Pump Testing to Be Performed Quarterly Rather than Monthly
ML20070D136
Person / Time
Site: Crane Constellation icon.png
Issue date: 12/07/1982
From: Hukill H
GENERAL PUBLIC UTILITIES CORP.
To: Stolz J
Office of Nuclear Reactor Regulation
References
5211-82-207, NUDOCS 8212140466
Download: ML20070D136 (1)


Text

GPU Nuclear Corporation gJ Nuclear

aon,e8s48o S

Middletown, Pennsylvania 17057 717 944-7621 TELEX 84-2386 Writer"s Direct Dial Number:

Decanber 7,1982 5211-82-207 Office of Nuclear Reactor Regulation Attn: John F. Stolz, Chief Operating Reactors Branch No. 4 U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

Three Mile Island Nuclear Station, Unit 1 (TM1-1)

Operating License No. DPR-50 Docket No. 50-289 Inservice Testing Program As a result of 10 CFR 50.55(b)(2) having been amended to include the 1980 Edition through Winter 1980 Addenda to Section XI of the ASME boiler and pressure vessel code (Federal Register Vol. 46, No. 251), we are upgrading our Inservice Pump and Valve Testing Program (GQL 1,357 dated 10/26/79, TLL 032 dated 1/31/80 and Llt 264 dated 9/25/81) to Articles IWP and IWV of the 1980 Edition through Winter 1980 Addenda of Section XI.

Our Inservice Testing Program will reflect the Section XI Division 1 changes which permit pump testing to be donc quarterly, rather than on the monthly frequency previously specified. We further trust that the Commission's acceptance of the more current code addenda resolves the issue of monthly testing of pumps which was considered an open item (A.2 of SER Table 2.2) in License Amendment No. 71 to DPR-50.

Sincerely,

l. D. Ilukill Director, TMI-l llDll:JRB:CJS:vj f cc:

R. Conte

[

]

4 J. Van Vliet

/

8212140466 821207 DR ADOCK 05000289 PDR GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation