Text
j + '
^N Commonwealth ECson
) one First National Plua. Chictgo tilinois
=
C } Address R ply to: Post Office Box 767 g(j Chicago, lilinois 60690 December 8, 1982 Mr. A. Schwencer, Chie f Licensing Branch #2 Division of Licensing U.
S. Nuclear Regulatory Commission Washington, DC 20555
Subject:
LaSalle County Station Unit 1 Proposed Amendment NPF-11 Change Request NPF-11/82-10 Supplemental Information NRC Docket'No. 50-373 References (a):
C. W. Schroeder letter to A. Schwencer dated August 18, 1982.
(b):
C. W. Schroeder letter to A. Schwencer dated October 22, 1982.
(c):
C.
W.
Schroeder letter to A. Schwencer dated October 29, 1982.
(d):
C.
W.
Schroeder letter to A.
Schwencer dated December 7, 1982.
Dear Mr. Schwencer:
References (a), (b), and (c) provided Commonwealth Edison Company's original request and supp1 mental information for a change in Technical Specifications to allow installation of a modification to meet License NPF-11, Condition 2.c. (17).
Reference (a) stated, "This tech spec change must be ef fec-tive only upon completion o f the installation of this modification."
The reason for this statement was that the change involves removal of certain instrumentation (and the applicable technical specifica-tion requirements) and the installation of dif ferent types of -
instrumentation with dif ferent technical specification requirements.
By requesting that the tech spec change be ef fective upon completion o f the installation o f the modification, Commonwealth Edison Company desired to install the modification at the first convenient opportunity, which would likely be well in advance o f the required implementation by the completion of the first refueling outage.
On December 7, 1982, Dr. A. Bournia notified C.W. Schroeder o f Commonwealth Edison that NRC management had determined that it Qgg3 g was necessary that Commonwealth Edison provide an exact implementa-U tion date, in lieu of the requested language.
8212140402 821208 i
PDR ADOCK 050003g
}
P
3.-
A. Schwencer December 8, 1982 LaSalle County Station Unit 1 is currently in cold shutdown awaiting NRC approval of Reference (d) ~ which requests approval'of single loop recirculation operation.
Thus, the current outage provides an opportunity. for installation of the modification.
Therefore, Commonwealth Edison _now requests that the Technical Specification Change be approved to be effective as of December 9, 1982.
If there are any questions in this matter, please contact this of fice.
Three (3) signed originals and forty (40) copies of this letter are provided for your use.
Very truly yours, j2 /Slst C. W. Schroeder Nuclear Licensing Administrator 1m cc:
NRC Resident Inspector - LSCS SUBSCRIBED and SWORN to bef re me.this M day R
o fEh, 1982 L
- E-d.
A 2J Notary Public 5542N