Requests Concurrence Prior to Performance on Nonconst Items Under 821112 Show Cause Order for Immediate Suspension of Essential Const
ML20070C784
Person / Time
Site: Zimmer
Issue date: 11/18/1982
From: Borgmann E
CINCINNATI GAS & ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20070C772 List:
References
QA-2118, NUDOCS 8212140340
Download: ML20070C784 (2)


Text

'*

15 e

?-

h THE CINCINNATI GAS & ELECTRIC COMPANY ZIMMER NUCLEAR POWER STATION, P.O. BOX 201, MOSCOW, OH 45153 November 18, 1982 QA-2118 E. A. 80 ROMAN N scNsom vect PassiotNT U.S. Nuc1 car Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attention:

Mr. J. G. Keppler Regional Administrator RE:

WM. H. ZIMMER NUCLEAR POWER STATION UNIT 1 CONCURRENCE OF NON-CONSTRUCTION ITEMS UNDER SHOW CAUSE ORDER OF NOVEMBER 12, 1982 DOCKET No. 50-358, CONSTRUCTION PERMIT NO.

CPPR-88, W.O. #57300, JOB E-5590, FILE #NRC-3 Gentlemen:

Reference is made to the meeting held in Cincinnati, Ohio November 17, 1982 in Mr. Dickhoner's office. We wish to continue certain activities which we be-lieve do not violate the spirit of the November 12, 1982 Show Cause and Order of Immediate Suspension of Essential Construction. However, we wish concurrence on these items prior to their performance:

1.

Removal of paints and coatings necessary to inspect welds. Repainting to protect welds.

Is this permitted?

2.

Removal of fireproofing and insulation to inspect welds and heat number traccability. Can this be done?

3.

Removal of hanger or parts of hanger looking for heat number trace-ability.

Is this permitted?

4.

Essential HVAC is ready for air test and balancing. May we proceed?

5.

It is necessary to perform routine maintenance on essential components such as lubrication, cleaning, changing filters, etc., on HVAC, motors, etc.

Will this be permitted?

(Continued) 8212140340 821130 PDR ADOCK 05000 NOV 2 21%2

O

^J. G. Keppler QA2118 November 18, 1982 Page 2 6.

HJK would like to sEip essential material off site to vendors for fabrication.

7.

Grinding is required in some cases to prepare essential welds for NDE examination. Is this permitted?

8.

Are we prohibited from receiving and reissuing essential material to contractors on site provided they are not used in construction?

9.

We would like to continue walkdown of essential systems both for engineering, inspection and traceability.

10.

We would like to conduct evaluations of existing essential coatings which require taking samples and conducting tests.

11.

We would like to continue electrical testing of cables and logic testing.

Is this permitted?

12.

Is it permitted to physically move mechanical equipment provided it does not enhance construction?

13.

Are we permitted to continue application of fire barriers classified as important to safety not listed as essential?

14.

May we proceed with hydrostatic, pneumatic testing and NDE?

15.

Review and acceptance of quality-related documentation - may it proceed?

16.

Installation of mirror insulation on the RPV vessel. May it proceed?

A prompt communique in response to our request would be appreciated.

Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY By E. A. BORGMANN RPE:jas SENIOR VICE PRESIDENT cc: NRC Office of Inspection

& Enforcement Washington, D.C. 20555 NRC Senior Resident Inspector Attn: W. 1. Christianson

.Zimmer Project Inspector Region III