ML20070B256

From kanterella
Jump to navigation Jump to search
Requests Extension Until 821215 for Submittal of Response to IE Bulletin 82-03 Re Inservice Insp of Reactor Recirculation Sys Piping.Request Granted Per 821124 Telcon
ML20070B256
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 11/30/1982
From: Gucwa L
GEORGIA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
REF-SSINS-6820 IEB-82-03, IEB-82-3, NUDOCS 8212090492
Download: ML20070B256 (1)


Text

4 Geo ya Pee r Ctm)any 333 Pedmod Avmue ANeta Georc; a 30308

.. r.,404 m em

,.g 3.

y, n n.~

_ ?,

c

. oct Off c.e Box 4545 Marca Geera <t 30302 30,198'27 0 F C 3 A10 4,.Oc rgiaPower November 7

, ur s., n,.;,,,,,,,.m Power Generation Department U. S. Nuclear Regulatory Comraission

REFERENCE:

Office of Inspection and Enforcement RII: JP0 Region II - Suite 3100 50-321 101 Marietta Street, NW I&E Bulletin Atlanta, Georgia 30303 82-03 ATTENTION: Mr. James P. O'Reilly GENTLEMEN:

As a result of NRC I&E Bulletin 82-03, Georgia Power Company is required to submit a response by December 1, 1982 for the inservice inspection of Reactor Recirculation System piping currently being performed for Hatch Unit 1.

Several rejectable indications have been observed using ultrasonic techniques on the aforementioned piping which necessitates that additional examinations be performed.

These additional examinations are currently in progress and their results require evaluation.

In lieu of submitting a response by December 1, 1982 which would require updating after completion of the additional examinations, Georgia Power Company requests that a two (2) week extension be granted.

Submittal by December 15, 1982 would allow adequate time to complete the additional examinations and their evaluation.

The requested extension was discussed with Mr. H. Dance of your staff on November 24, 1982 by Mr.

S. C.

Ewald, Georgia Power Company.

Mr. Dance indicated that submittal of the response to the subject bulletin by December 15, 1982 would be acceptable.

Should you have any questions in this regard, please contact this office.

Very truly yours,

[ 7 4Q2+ m L. T. Gucwa Chief Nuclear Engineer JAE/mb xc:

H. C. Nix, Jr.

Senior Resident Inspector 8212090492 821130 PDR ADOCK 05000321 fd31

.