ML20069Q524
| ML20069Q524 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 01/10/1991 |
| From: | Creel G BALTIMORE GAS & ELECTRIC CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| TAC-61710, NUDOCS 9101160151 | |
| Download: ML20069Q524 (2) | |
Text
_ _. -
._.m..
B ALTIMORE
- G AS AND 1
1 ELECTRIC
. CHARLES CENTER * :P.O.' BOX 1475 e BALTIMORE. MARYLAND 21203 1475 Gronor C. CRCCL Viet Patstotut Nwctran tutmov
-(Joi) 3eo,a a 6 6 January 10,1991 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:
Document Control Desk
SUBJECT:
Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50 318 License Amendments Removing the Station Batteries' Dummy Load Profiles from the Technical Specifications -(TAC NOSc 61710, 61711, 69242 and 69243)
REFERENCE:
(a)
Letter from Mr. S. ALMcNeil (NRC) to Mr. G.C. Creel (BG&E),
dated May 18,1989, Issuance of Amendments Gentlemen:
On May 18,1989 the Commisbon issued Amendment -No.137cto Facility. Operating License No. DPR 53 and Amendment-No 120 to Facility Operating License No. DPR-69 for the Calvert Cliffs Nuclear Power Plantc Unit Nos.1 and 2, respectively.
These amendments modify Technical Specification 3/4.8.2.3, " Electrical Power System: D.C.
Distribution Operating " by deleting the dummy load profile for the 18 month station battery service test from Technical Specification Surveillance Requirement 4.8.2.3.2.d.2 and instead specify that the
-load profile is documented in Chapter 8 of the Calvert Cliffs Nuclear Power Plant Units 1 ~and 2 Updated Final Safety Analysis Report (UFSAR) and updated in accordance with 10 CFR 50.71(c).
In accordance with Reference (a), these amendments.wcre not to become effective until 14 days after our issuance of a notarized letter to.the Commission providing official certification of the completion, approval and implementation, in accordance with-the provisions of 10 CFR 50.59, of a new design load study reflecting current plant conditions at Calvert Cliffs.
' We certify with this letter that a new design load study reDecting current plant conditions at Calvert Cliffs has been completed,-approved,;and implemented,-in accordance with the provisions of '
L 10 CFR 50.59.
Therefore, we intend to implement Amendments 137 and'120 fourteen days from the date of this letter, or shortly thereafter.
h f
ph
- 6g"R86s $s8!$7 gd M
-P
]
m
Document Control Desk January l0,1991 Pagc 2 5
Should you have any questions regarding this matter, we wouid be pleased to discuss them with you.
Very truly outs, 1
STATE OF. MARYLAND 1 t
.TO WIT I hereby certify that on the
/0 day of 7 ner4
,193, before me, the subscriber,
- a. Notary Public of the-State of Maryland.in and for -
Calrut deanft/
. personally appeared George C. Crect, being duly sworn, and states that he is Vice President of the Baltimore Gas and Electric Company, t, corporation of the State of Maryland; that he provides the_
s foregoing response for the purposes therein set forth;-that the statements made are true and correct to the best of his knowledge, information, and belief; and that he was authorized to provide the response on behalf of said Corporation.
WITNESS my Hand and Notarial Scal:
Y Notary Public
.i My Commission Expires:
h; f
Dpc GCC/DLS/ dis / dim cc:
D. A. Brune, Esquire J. E. Silberg, Esquire R. A. Capra, NRC D. G. Mcdonald, Jr., NRC T. T. Martin, NRC.
L E. Nicholson, NRC R. I. McLean, DNR
(
t.
c.
- .. _, _ _. a
....