ML20069P478
| ML20069P478 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 12/31/1990 |
| From: | Berkow H Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20069P479 | List: |
| References | |
| NUDOCS 9101100210 | |
| Download: ML20069P478 (7) | |
Text
...
UNITED SVATES
[N
' 'n NUCLEAR REGULATORY COMMISSION 3,6 WASHINGTON, D. C. 20555 o,,
gw /
....+
VIRGINIA _ ELECTRIC AND_ POWER __ COMPANY DOCKET N0_._50-280
_SURRY POWER _ STATION, UNIT _NO._1 At4ENDMENT T0_ FACILITY _0PERATING L_ICENSE Amendment No. 151 License No. DPR-32 1.
The Nuclear Regulatory Comission (the Comission) has found thct:
A.
The application for amendment by Virginia Electric and Power Company (the licensee) dated October 11, 1990, as supplemented October 12, 1990, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangerint the health and safety of the public, and (ii) that such activitie s will be conducted in compliance with the Comission's regulat ons; D.
The issuance of this amendment will not be inimical t i the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B of Facility Operating License No. OPR-32 is hereby amended to read as follows:
9101100210 901231 gDR ADOCK 05000200 PDR
2 (B) Technical _ Specifj_c_a_tjons The Technical Specifications contained in Appendix A, as revised through Amendment No.151, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
}pu--
H bert H. Berkow, Director Project Directorate 11-2 Division of Reactor Projects - 1/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: December 31, 1990 i
_J
.. p@ ** %<4'o, UNITED STATES i
NUCLEAR REGULATORY COMMISSION 5+
WASHING TON, D. C. 20555
. o, gw.....f j
VIRGINIA ELECTRIC AND POWER COMPANY DOCKET NO. 50-281 SURRY_ POWER STATION,_ UNIT NO. 2 j
AMENDMENT T0 FACILITY OPERATING LICENSE Amendment No.148 License No. DPR-37
'1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment by Virginia Electric and Power Company (the licensee) dated October 11, 1990, as supplemented October 12, 1990, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Comission's rules and regulations set forth in 10 CFR Chapter I; i
P.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (1) that the activities authorized by this amendment can be conducted'without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
-The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.-
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulation.s and all applicable requirements have been satisfied.-
2.
Accordingly, the license is amended by changes to the-Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B of Facility Operating License No. DPR-37 is hereby amended to read as follows:
l (B) Technical Specific _at_io_n_s 1
The Technical Specifications contained in Appendix A, as revised through Amendment No.148, are hereby incorporated in the license.
The licensee shall operate the f acility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION f
)<
/
erbert N. Berkow, Director Project Directorate II-P Division of Pasctor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: December 31, 1990
ATTACHMENT TO LICENSE AMENDMENT AMENDMENT N0. 151
_FAClllT_Y_0PEPATING_ LICENSE _N0. OPR-32 AMEN 0 MENT NO.148 FACILITY OPERATING LICEllSE NO. DPR-37 DOCKET NOS. 50-280 AND 50-281 l
Revise Appendix A as follows:
Remove P,ajes Insert Pages TS 6.1-1 TS 6.1-1 TS 6.1-2 TS 6.1-2
41 TS 6.1-2 l
B.
The facility organization shall conform to the following rwquirements:
1.
Each member of the facility staff.shall meet or exceed the minimum qualifications of ANS 3.1 (12/79 Draft)* for comparable positions, and the supplemental requirements specified in the March 28,1980 NRC letter to alllicensees, except:
l a.
The Superintendent - Radiological Protection I
shall meet or exceed the qualifications of Regulatory Guide 1.8, September 1975.
b.
The Superintendent - Operations shall hold (or have previously held) a Senior Reactor Opemtor License for Surry Power Station or a similar design Pressurized Water Reactor plant.
The Supervisor Shift Operations shall hold an active Senior c.
Reactor Operator License for Surry Power Station.
2.
The Shift Technical Advisor shall have a bachelor's degree or equivalent in a scientific or engineering discipline with specific training in plant design and response and analysis of the plant for transients and accidents.
3.
The Manager - Nuclear Training is responsible for ensuring that retraining and replacement training programs for the facility staff are maintained and that such programs meet or exceed the requirements and recomendations of Section 5 of ANS-3.1 (12/79 l
Draft
- and Appendix "A" of 10 CFR Part 55 and the supplemental requirements specified in the March 28, 1980 NRC letter to all licensees, and shall include familiarization with relevant industry operational experience identified by the operating experience program.
4.
Each on duty shift shall be composed of at least the minimum shift crew composition for each unit as shown in Table 6.1-1.
5.
A health physics technician shall be on site when fuelis in the reactor.
6.
All core alterations shall. be observed and directly supervised by either a licensed Senior Reactor Operator or Senior Reactor Operator Limited to Fuel Handling who has no other concurrent responsibilities during this operation.
Exceptions to this requirement are specified in VEPCO's QA Topical Report, VEP 1," Quality Assurance Program, Operational Phase" l
Amendment Nos.151 and 149 vm-
-- e a
t
l 6.0 ADMINISTRATIVE CONTROLS I
6.1 Oraan12ation. Safety and Oceration Review Soecification A.
The Station Manager shall be responsible for the overall operation of the facility, in his absence, the Assistant Station Manager (Operations and Maintenance) shall be responsible for the safe operation of the facility.
During the absence of both, the Station Manager will delegate in writing the succession to this responsibility.
t An onsite and an offsite organization shall be established for facility operation and corporate management. The onsite and offsite organization shallinclude the positions for activities affecting the safety of the nuclear power plant.
1.
Lines of authority, responsibility, and communication shall be established and defined for the highest management levels through intermediate levels to and including all operating organization pcsitions. These relationships shall be documented and updated, as appropriate, in the form of organization charts, functional descriptions I
of departmental responsibilities and relationships, and job descriptions for key personnel positions, or in equivalent forms of documentation. These requirements shall be documented in the UFSAR.
2.
The Station Manager shall be responsible for overall unit safe operation and shall have control over those onsite activities necessary for safe operation and maintenance of the plant.
3.
The Vice President - Nuclear Operations shall have corporate responsibility for overall plant nuclear safety ano shall take any measures needed to ensure acceptable performance of the staff in operating, maintaining and providing technical support to the plant to ensure nuclear safety.
4.
The management position responsible for training of the operating staff and the position responsible for the quality assurance functions shall have sufficient organizationa! treedom including sufficient independence from cost and schedule wher: opposed to safety considerations.
5.
The management position responsible for health physics shall have direct access to that onsite individual having responsibility for overall facility management. Health physics personnel shall have the authority to cease any work activity when worker safety is jeopardized or in the event of unnecessary personnel radiation exposures.
I l
Amendment Nos. 151 and 148,
-